The page lists 39 deliverables related to the research project "IN2RAIL".
title and desprition | type | last update |
---|---|---|
Interface Control Document (ICD) for Application-specific InterfacesDocument describing required Data structure and Interface Data Management processes to connect Service Application Modules to the Framework Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Investigation of repair methods and welding techniquesAnalysis of current problems and advantages/disadvantages of current techniques. Analysis of feasibility and assessment of selected welding processes including establishment of tolerances. Proposals for subsequent studies in SHIFT²RAIL Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Asset status forecasting and feature selection methodologiesThis deliverable will define the methodologies and algorithms to predict the statuses of the network assets at different future times with associated uncertainty Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
IN²RAIL VideoVideo highlighting IN²RAIL main achievements Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Websites, patent fillings, videos etc. | 2020-02-07 |
Development of novel S&C motion mechanisms:- Design concept report [TRL 3]Design definition documentation recording the design development decisions and the option selection criteria applied for the adopted design concept Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Final research report “Intelligent AC power supplyâ€As final deliverable of WP10, a research report will be published. This report will cover all transferable specifications and implementation rules, evaluation concepts and proposals for adoptions in standards and regulations Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Integration and Implementation Design – Link to SHIFT2RAILReport on Use Case definition related to Energy Management Objective; List of Bill of Quantities for SHIFT²RAIL demonstrator implementation; Planning of SHIFT²RAIL demonstrator implementation Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Radical S&C concept:- Design concept evaluation study report [TRL3]Design definition documentation recording the design development decisions and the design option selection criteria applied for the adopted design concept. To include system integrity study results and LCC analysis Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Definition of the Proof-of-conceptThis deliverable will define an application scenario to show the concept of the I2M. The relevant parameters are identified and method for the proof-of-concept is also defined Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Interface Control Document for Integration Layer Interfaces, external/Web interfaces and Dynamic Demand ServiceDocument describing required Data structure and Interface Data Management processes to connect internal and external Services to the Integration Layer Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Nowcasting methodologiesThis deliverable will describe the methodologies developed in Task 6.1 to offer standardised, seamless access to synthesised network asset statuses (nowcasting) for TMS/dispatching systems Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Quality Assurance ReportSummary of all quality appraisal and verification sheets for proper evaluation of project quality Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Integration Test Plan for Application Framework and ConstituentsDocument describing the System Integration Test for the Framework, constituents and Service Applications Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Prioritised relevant inputA Report listing relevant inputs including the sources it’s obtained from and including updated findings Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Dissemination and Exploitation activitiesReport summarising the results/impacts of all the dissemination, communication and exploitation activities Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Websites, patent fillings, videos etc. | 2020-02-07 |
Self inspecting / adjusting S&C:- Systems concept design report [TRL5]Results of concepts analysis that documents the assessment of the principles of adaptive control and how these can be applied to self-adjusting S&C mechanisms Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Evaluation of the proof of conceptThis deliverable will report and explain the results of the proof-of-concept of the I2M Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
TMS/MMS interface specificationThe final deliverable will be a specification of a standardized interface (FFFIS) for a both side communication with a Traffic Management System and also with a Maintenance Management System. Therefore formats as well as web services have to be defined Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Asset status representationThis deliverable will provide a standard for the representation of dynamic heterogeneous data throughout the IN²RAIL I²M ecosystem to facilitate their use in TMS/dispatching systems Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Embedded & integrated sensors:- Systems design hierarchy report [TRL5]Systems principles design for the instrumentation of the embedded sensors. To include data structure design and signalling processing requirements Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Description of Integration Layer and ConstituentsDocument describing functional processes and architecture of the Integration Layer Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Requirements for InterfacesSpecification of the peer-to-peer services necessary for internal and external communications Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Description of the Generic Application Framework and its constituentsDocument describing the functional processes and the architecture of the Generic Application Framework and its constituents Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Report on key parameters for bridge and tunnel inspectionsRequirements on inspection data needed to fulfil effective bridge and tunnel management and value adding parameters for further enhancement are presented and will serve as benchmark criteria in the following work Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Report on benchmark, evaluation and initial testIdentified techniques, benchmark results based on key parameters and initial technology concept is formulated together with suggestions for further development Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
System Integration ReportReport on the level of integration achieved by the project and guidelines towards the integration in SHIFT²RAIL Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Report on technical validation of concepts and models [TRL 5]Feasibility validation of the developed concepts and models for track and switch maintenance, maintenance planning and tamping method Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Requirements for the Generic Application FrameworkSystem Requirements Specification (SRS) for a standardized Generic Application Framework allowing Plug and Play of Service Application Modules Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Set up public websiteReport defining the setting up of the project public website and its functionality Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Websites, patent fillings, videos etc. | 2020-02-07 |
Mid term System Integration ReportReport summarising the mid-term system integration achievements, activity, relationships, and further foreseen development Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Set up a dissemination and exploitation plan for IN²RAILReport defining the IN²RAIL dissemination, communication and exploitation strategies Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Websites, patent fillings, videos etc. | 2020-02-07 |
Quality Plan (WP1)Report defining the project quality assurance aspects. It shall include all templates and instructions for document preparation and coding Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Embedded & integrated sensors:- Systems design selection report [TRL5]Design evaluation analysis report comprising documentation of the design selection options and the rational for the final embedded sensor design selection Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Quality PlanReport defining the project quality assurance aspects. It shall include all templates and instructions for document preparation and coding Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Requirements for the Integration LayerSystem Requirement Specification (SRS) including outcome of WP7 for a standardised Integration Layer to secure dynamic communication between connected internal (e.g. Traffic Management) and external (Web based) Services Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
I2M Consolidated Functional and Non-Functional RequirementsDefine use cases and describe client (mainly passengers) expectations in order to consolidate and describe functional and non-functional requirements (IM and TOC) Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Specifications of the Standard Operator WorkstationRequirements, workload analysis methodologies, security guidelines and conceptual design, including considerations for persons with special needs Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
Project ManualDetailed Description of work with specific task and subtask allocation, detailed budget specification, deliverable preparation plan, detailed Gantt diagram (at sub task level), risk management and follow-up Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |
I2M State-of-the-art and High Level RequirementsProvide actual high level functional and non-functional requirements (IM and TOC) and KPI (definition and business impact description) going along with from previous results and ongoing projects, network benchmark Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2020-02-07 |