Opendata, web and dolomites

IN2RAIL project deliverables

The page lists 39 deliverables related to the research project "IN2RAIL".

 List of Deliverables

IN2RAIL: list of downloadable deliverables.
title and desprition type last update

Interface Control Document (ICD) for Application-specific Interfaces

Document describing required Data structure and Interface Data Management processes to connect Service Application Modules to the Framework

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Investigation of repair methods and welding techniques

Analysis of current problems and advantages/disadvantages of current techniques. Analysis of feasibility and assessment of selected welding processes including establishment of tolerances. Proposals for subsequent studies in SHIFT²RAIL

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Asset status forecasting and feature selection methodologies

This deliverable will define the methodologies and algorithms to predict the statuses of the network assets at different future times with associated uncertainty

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

IN²RAIL Video

Video highlighting IN²RAIL main achievements

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-02-07

Development of novel S&C motion mechanisms:- Design concept report [TRL 3]

Design definition documentation recording the design development decisions and the option selection criteria applied for the adopted design concept

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Final research report “Intelligent AC power supply”

As final deliverable of WP10, a research report will be published. This report will cover all transferable specifications and implementation rules, evaluation concepts and proposals for adoptions in standards and regulations

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Integration and Implementation Design – Link to SHIFT2RAIL

Report on Use Case definition related to Energy Management Objective; List of Bill of Quantities for SHIFT²RAIL demonstrator implementation; Planning of SHIFT²RAIL demonstrator implementation

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Radical S&C concept:- Design concept evaluation study report [TRL3]

Design definition documentation recording the design development decisions and the design option selection criteria applied for the adopted design concept. To include system integrity study results and LCC analysis

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Definition of the Proof-of-concept

This deliverable will define an application scenario to show the concept of the I2M. The relevant parameters are identified and method for the proof-of-concept is also defined

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Interface Control Document for Integration Layer Interfaces, external/Web interfaces and Dynamic Demand Service

Document describing required Data structure and Interface Data Management processes to connect internal and external Services to the Integration Layer

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Nowcasting methodologies

This deliverable will describe the methodologies developed in Task 6.1 to offer standardised, seamless access to synthesised network asset statuses (nowcasting) for TMS/dispatching systems

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Quality Assurance Report

Summary of all quality appraisal and verification sheets for proper evaluation of project quality

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Integration Test Plan for Application Framework and Constituents

Document describing the System Integration Test for the Framework, constituents and Service Applications

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Prioritised relevant input

A Report listing relevant inputs including the sources it’s obtained from and including updated findings

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Dissemination and Exploitation activities

Report summarising the results/impacts of all the dissemination, communication and exploitation activities

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-02-07

Self inspecting / adjusting S&C:- Systems concept design report [TRL5]

Results of concepts analysis that documents the assessment of the principles of adaptive control and how these can be applied to self-adjusting S&C mechanisms

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Evaluation of the proof of concept

This deliverable will report and explain the results of the proof-of-concept of the I2M

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

TMS/MMS interface specification

The final deliverable will be a specification of a standardized interface (FFFIS) for a both side communication with a Traffic Management System and also with a Maintenance Management System. Therefore formats as well as web services have to be defined

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Asset status representation

This deliverable will provide a standard for the representation of dynamic heterogeneous data throughout the IN²RAIL I²M ecosystem to facilitate their use in TMS/dispatching systems

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Embedded & integrated sensors:- Systems design hierarchy report [TRL5]

Systems principles design for the instrumentation of the embedded sensors. To include data structure design and signalling processing requirements

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Description of Integration Layer and Constituents

Document describing functional processes and architecture of the Integration Layer

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Requirements for Interfaces

Specification of the peer-to-peer services necessary for internal and external communications

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Description of the Generic Application Framework and its constituents

Document describing the functional processes and the architecture of the Generic Application Framework and its constituents

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Report on key parameters for bridge and tunnel inspections

Requirements on inspection data needed to fulfil effective bridge and tunnel management and value adding parameters for further enhancement are presented and will serve as benchmark criteria in the following work

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Report on benchmark, evaluation and initial test

Identified techniques, benchmark results based on key parameters and initial technology concept is formulated together with suggestions for further development

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

System Integration Report

Report on the level of integration achieved by the project and guidelines towards the integration in SHIFT²RAIL

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Report on technical validation of concepts and models [TRL 5]

Feasibility validation of the developed concepts and models for track and switch maintenance, maintenance planning and tamping method

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Requirements for the Generic Application Framework

System Requirements Specification (SRS) for a standardized Generic Application Framework allowing Plug and Play of Service Application Modules

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Set up public website

Report defining the setting up of the project public website and its functionality

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-02-07

Mid term System Integration Report

Report summarising the mid-term system integration achievements, activity, relationships, and further foreseen development

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Set up a dissemination and exploitation plan for IN²RAIL

Report defining the IN²RAIL dissemination, communication and exploitation strategies

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-02-07

Quality Plan (WP1)

Report defining the project quality assurance aspects. It shall include all templates and instructions for document preparation and coding

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Embedded & integrated sensors:- Systems design selection report [TRL5]

Design evaluation analysis report comprising documentation of the design selection options and the rational for the final embedded sensor design selection

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Quality Plan

Report defining the project quality assurance aspects. It shall include all templates and instructions for document preparation and coding

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Requirements for the Integration Layer

System Requirement Specification (SRS) including outcome of WP7 for a standardised Integration Layer to secure dynamic communication between connected internal (e.g. Traffic Management) and external (Web based) Services

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

I2M Consolidated Functional and Non-Functional Requirements

Define use cases and describe client (mainly passengers) expectations in order to consolidate and describe functional and non-functional requirements (IM and TOC)

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Specifications of the Standard Operator Workstation

Requirements, workload analysis methodologies, security guidelines and conceptual design, including considerations for persons with special needs

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

Project Manual

Detailed Description of work with specific task and subtask allocation, detailed budget specification, deliverable preparation plan, detailed Gantt diagram (at sub task level), risk management and follow-up

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07

I2M State-of-the-art and High Level Requirements

Provide actual high level functional and non-functional requirements (IM and TOC) and KPI (definition and business impact description) going along with from previous results and ongoing projects, network benchmark

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2020-02-07