Opendata, web and dolomites

I-SUPPORT project deliverables

The page lists 24 deliverables related to the research project "I-SUPPORT".

 List of Deliverables

I-SUPPORT: list of downloadable deliverables.
title and desprition type last update

Dissemination and exploitation report (II)

This deliverable is related to the output of T7.2 and T7.4. The dissemination part will be PU, while the exploitation/use part will be CO. This deliverable includes the identification of the I-SUPPORT exploitable assets and the individual (per partner and per asset) exploitation plans. All of the D7.2 updates will be delivered together with the periodic management reports.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Progress report (VI)

The project report deliverable will provide an update on the overall project progress. It is expected that progress reports will have a PU section and a CO section, depending on the EU requirements.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

System vision functionality (II)

This deliverable is related to the output of T4.1 and T4.2 and will demonstrate the advanced features of the system vision functionality. Intermediate milestones for both tasks are set on Month 18. The deliverable will be updated up to M35.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-10-08

System integration and performance metrics (II)

This deliverable is related to the output of T2.2, T2.3 and T2.5 and will demonstrate the integration and evaluation of the second prototype before the beginning of the corresponding Pilot testing. Updating of prototype continues up to Month M36 (Final Prototype & Report).

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Evaluation Plan (II)

This deliverable is related to the output of T6.1, where an overall evaluation plan will be formulated following a 4-step approach.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Safety validation results (I)

We will perform a first I-SUPPORT prototype safety validation on M23 with update on Month M30 (each delivery before the Pilot testing and I-SUPPORT prototype integration). This deliverable is related to the output of T2.4. A separate deliverable is devoted to T2.4, because a lot of effort will be put on safety evaluation and because of its significance to the acceptability of the I-SUPPORT system.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-10-08

Evaluation Plan (I)

This deliverable is related to the output of T6.1 and will be formulated following a 4 step approach.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-10-08

System vision functionality

This deliverable is related to the output of T4.1 and T4.2 and will demonstrate the first system vision functionalities. Intermediate milestones for both tasks are set on Month 18. The deliverable will be updated up to M35.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-10-08

System integration and performance metrics (III)

This deliverable is related to the output of T2.2, T2.3 and T2.5 and and will demonstrate the integration and evaluation of the final prototype.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Dissemination and exploitation reports (III)

This deliverable is related to the output of T7.2 and T7.4. The document will provide a full presentation of all dissemination activities and exploitation plans from all aspects described in T7.4. All of the D7.2 updates will be delivered together with the periodic management reports.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Progress Report (V)

The project report deliverable will provide an update on the project progress. It is expected that progress reports will have a PU section and a CO section, depending on the EU requirements.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Progress Report (III)

The project report deliverable will provide an update on the project progress. It is expected that progress reports will have a PU section and a CO section, depending on the EU requirements.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Progress Report (IV)

The project report deliverable will provide an update on the project progress. It is expected that progress reports will have a PU section and a CO section, depending on the EU requirements.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Service robotics system description and architecture (II)

Update the first version of the system description and architecture.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Safety validation results (II)

Safety validation results published on Month M30 before the Pilot testing and I-SUPPORT prototype integration. This deliverable is related to the output of T2.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-10-08

System Integration and Performance Metrics

This deliverable is related to the output of T2.2, T2.3 and T2.5 and will demonstrate the first I-SUPPORT prototype before the beginning of the pilot testing. The deliverable will contain also assessment of the system performance based on performance metrics.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-10-08

Safety requirements

This deliverable is related to the output of T1.3 and contains the analysis of I-SUPPORT system safety requirements. An intermediate milestone report will be delivered on M5. Revisions of the M12 report on safety requirements will be provided throughout the project as required and as development work progresses.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Sociological, gender and ethical considerations

This deliverable is related to the output of T1.5 and contains analysis on the sociological, gender and ethical considerations. Revisions of D1.3 delivered in M7 will be conducted up to M36 as required and as Pilot testing activities progress. Ethical approvals before pilot testing are milestones.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Dissemination Plan and Communication tools

Within this task, the consortium will create and regularly update a dissemination plan for the effective and high-impact dissemination of the project results. The internal and external communication tools to be used in the context of the project will also be defined, including the web site, the file repository, the web 2.0 tools (such as the wiki), templates of various kinds, leaflets, etc.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-10-08

Service robotic system description and architecture (I)

This deliverable is related to the output of T2.1 and contains specifications for all system blocks, operating systems, programming languages, libraries, system interconnections, communication protocols, middleware and application layers.

We will define interoperability standards so that the aforementioned can be seamlessly integrated. All software interfaces will be clarified and agreed between partners. All partners will agree on common software/documentation standards.

All hardware interfaces will be clarified and agreed between partners. All partners will agree on common hardware/documentation standards.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Progress Report

Progress reports are expected to have a PU section and a CO section. Periodic progress reports will be published on M6, M12, M18, M24, M30, M36. This deliverable is defined in the Grant Agreement offered by the EC and is related to all WP8 tasks.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Dissemination and exploitation report (I)

This deliverable is related to the output of T7.2 and T7.4. This document (Part (I) of D7.2) will only report on dissemination activities. All of the D7.2 updates will be delivered together with the periodic management reports.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

I-SUPPORT Models of user abilities and behaviour, use cases and system functionalities

This deliverable is related to the output of T1.1, T1.2 and T1.4 and contains I-SUPPORT Models of user abilities and behaviour, use cases and system functionalities. Intermediate milestone reports will be delivered on M3 (user requirements) and M5 (initial use cases). Revisions of D1.1 delivered in M7 will be conducted up to M18 as required and as development work progresses.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08

Progress Report (II)

The project report deliverable will provide an update on the project progress. It is expected that progress reports will have a PU section and a CO section, depending on the EU requirements.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-10-08