The page lists 19 deliverables related to the research project "CREATE".
title and desprition | type | last update |
---|---|---|
Report on analysis of INRIX dataReport on analyses of INRIX data: This report results from task 3.4: First, standard INRIX congestion indicators for stage 1 and stage 3 cities as well as advanced congestion indicators for stage 3 cities, both based on INRIX GPS data, are computed. Second, analyses of mobile phone data, giving information on congestion across modes, will be reported. Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Project VideoProject video First version, Month 18, final version Month 30 Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Other | 2019-08-06 |
Business and investment pathways for tackling traffic congestion and reducing car dependenceBusiness and investment pathways for tackling traffic congestion and reducing car dependence (Draft Month 24 for guidelines input, Final, Month 28) VECTOS Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Potential contributions of advances in transport technologies and new management systemsPotential contributions of advances in transport technologies and new management systems Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Scope for accelerating urban mobility development processes in rapidly growing economies: the case of Adana, Amman, Bucharest, Skopje and TallinnReport on cross-city comparison. This report cross-analyses each City Report produced in D4.4 identifying commonalities between cities and differences. It draws conclusions and recommendations. Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Report of cross city comparisonReport on cross city comparisons: This report is compiled in task 3.5. It includes cross-city descriptive and model based analyses on determinants of car use, travel demand and congestion. Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Developing a set of effective and politically acceptable Stage 4 city policies: an SUMDPDeveloping a set of effective and politically acceptable Stage 4 city policies Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
CREATE Stage 1 City Reports Past, Present and Future mobility challenges and opportunities in five growing economiesEach city report is based on the combined analysis of the ‘city profile’, including quantitative and qualitative data provided by each city, and the analysis of Focus Groups conducted in each city. For each Stage 1 city, past, present and future mobility challenges and opportunities are described. Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Internal reportsa_b_c_d_e - Internal reports, month 30 (End of Task 4.3), 5 monographs of some 40p. each. Dissemination level: PU Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
A city’s introduction to CREATE: (Glossy illustrated document to support the guidelines)Glossy illustrated document to support the guidelines Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Final Stakeholder needs assessmentFinal Stakeholder needs assessment. This is the final version of D2.2 showing an update of D2.2 but also the changing needs and views. This will include three waves of interviews. Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
A long term analysis of traffic congestion and car use reduction in major European cities: what policies and measures worked?A long term analysis of traffic congestion and car use reduction in major European cities: what policies and measures worked? VECTOS with input from EIP, UCL, BOKU, Sciences Po Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Final reportFinal report incl. comparative analysis (40p.), month 30 (End of WP4). Dissemination level: PU Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
The CREATE guidelines: pathways to tackling congestion and reducing levels of car use in European citiesThe CREATE guidelines: pathways to tackling congestion and reducing levels of car use in European cities) (Draft month 25, final Month 36) VECTOS with inputs from all workpackage leaders and city partners Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Urban congestion and network performance – a new understandingUrban congestion and network performance- a new understanding (technical report and glossy brochure) Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
One technical report per Stage 3 cityOne technical report per stage 3 city (= 5 reports): These reports contain descriptive analyses done in task 3.3. The analysis will cover some standard components being the same for all stage 3 cities but also city specific analyses if special data is only available in some of the stage 3 cities. (Input from Stage 3 city partners) Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Future mobility demands in rapidly growing Stage 3 cities and the likely implications for congestion and overall network performanceFuture mobility demands in rapidly growing Stage 3 cities and the likely implications for congestion and overall network performance Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Stakeholder needs assessmentStakeholders’ needs assessment Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Documents, reports | 2019-08-06 |
Project website and leafletProject website and leaflet Programme: H2020-EU.3.4. - Topic(s): MG-5.3-2014 |
Other | 2019-08-06 |