The page lists 15 deliverables related to the research project "ERIGrid".
title and desprition | type | last update |
---|---|---|
D-NA2.1: “Promotion and marketing materialâ€Relevant marketing material (incl. project website) will be available to disseminate project activities, outcomes / results, TA calls, etc. to relevant stakeholders. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Websites, patent fillings, videos etc. | 2019-11-25 |
D-JRA1.1: “ERIGrid scenario descriptionsâ€A report summarizing the high-level scenarios where development in the context of ERIGrid is evidently needed. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Documents, reports | 2019-11-25 |
D-NA2.2a: “Progress report on the cooperation with international and national projects and initiatives within the scope of ERIGridâ€Describes the status and achievements of the interaction with relevant stakeholder groups. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Documents, reports | 2019-11-25 |
D-NA4.2a: “Training/education material and organization of webinarsâ€Provides an overview of the developed training and education material. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Websites, patent fillings, videos etc. | 2019-11-25 |
D-JRA2.2: “Smart Grid ICT assessment methodâ€The procedure to test and check the ICT aspects (incl. cyber-security) of a Smart Grid system. The validity of the procedure is shown with a representative mock-up that uses the developed assessment scripts. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Documents, reports | 2019-11-25 |
D-NA3.4: â€First report on trans-national access results and lessons learnedâ€This document will summarize the trans-national activities performed during the first half of the TA period of the project. It will not only present the “administrative†information (calls, proposals, composition of the USPs, reviewing results, etc.) but also assess the technical results based on the dissemination information produced by the users. In addition, it will include the conclusions derived from the first user workshop. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Documents, reports | 2019-11-25 |
D-JRA2.1: “Simulator coupling and Smart Grid librariesâ€A report on all relevant simulation packages and libraries and how to integrate/adapt/extend them, packaged with the well-documented software library itself to implement these couplings. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Other | 2019-11-25 |
D-NA5.2: “Partner profilesâ€For each ERIGrid partner an automatically computable profile is provided that describes his/her key characteristics consisting of the quality with which a partner is able to conduct a certain experiment. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Other | 2019-11-25 |
D-NA5.1: “Smart Grid configuration validation scenario description methodâ€Based on established standardization activities a proper Smart Grid scenario description model and method is described that details the system configuration as well as the use and test cases that have to be investigated. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Documents, reports | 2019-11-25 |
D-NA2.2c: “Progress report on the cooperation with international and national projects and initiatives within the scope of ERIGridâ€Describes the status and achievements of the interaction with relevant stakeholder groups. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Documents, reports | 2019-11-25 |
D-NA2.2b: “Progress report on the cooperation with international and national projects and initiatives within the scope of ERIGridâ€Describes the status and achievements of the interaction with relevant stakeholder groups. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Documents, reports | 2019-11-25 |
D-NA3.2: â€Regulation of the stay of the users at the ERIGrid infrastructuresâ€This document is the general protocol governing the stay of users in the facilities. It will include indications for the stay provision, roles and responsibilities, general safety prescriptions, etc. A contract template to be signed by the user and the host infrastructure will be included as well. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Documents, reports | 2019-11-25 |
D-JRA2.3: “Smart Grid simulation environmentâ€A simulation package for modelling and simulating smart grids. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Other | 2019-11-25 |
D-NA3.1: â€General rules for the ERIGrid trans-national accessâ€This document details the full access procedure agreed among the ERIGrid infrastructures for the access of users. It will explain the calls structure and timeline, USP organization, selection criteria, etc. It will become the reference guide to the proposers applying for access. A proposal template will be included as well. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Documents, reports | 2019-11-25 |
D-JRA1.2: “Focal use case collectionâ€A collection of use case specifications to be implemented during the project. Programme: H2020-EU.1.4.1.2. - Topic(s): INFRAIA-1-2014-2015 |
Other | 2019-11-25 |