The page lists 17 deliverables related to the research project "smarticipate".

 List of Deliverables

smarticipate: list of downloadable deliverables.
title and desprition type last update

Working document summarizing results of tasks 7.1 to 7.4 for Rome

Production of a working document summarizing the results of tasks 7.1 to 7.4 in the City of Rome. This will serve as the basis for the elaboration of product specifications.

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Citizen Dialogue Design Requirements

A Report of the gathered requirements and derived recommendations for citizen dialog design.
Responsible: AIT

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Annual Report 1

Documentation of the project results from the first year

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

User requirements definition

This deliverable defines stakeholder engagement process and elaborates requirements management approach in smarticipate project. Also, it will identify and describe cities specific use cases, functional and non-functional requirements and present detailed requirements analysis.
Responsible: UWE

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Scoping Report

Experiences from 12-15 European cities in applying elements of ICT-enabled open governance will be portrayed in a scoping report illustrating the variety of existing local practices. The scoping report will be published both in electronic (pdf) and printed form.

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Working document summarizing results of tasks 7.1 to 7.4 for Hamburg

Production of a working document summarizing the results of tasks 7.1 to 7.4 in the City of Hamburg. This will serve as the basis for the elaboration of product specifications.

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Working document summarizing results of tasks 7.1 to 7.4 for London

Production of a working document summarizing the results of tasks 7.1 to 7.4 in the City of London. This will serve as the basis for the elaboration of product specifications.

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Interface and toolkit redbook

Interface and toolkit redbook: the accompanying documentation is released in 3 stages (M12 draft, M18 intermediate, M28 final)

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Final evaluation report

This deliverable will produce a comprehensive report on evaluation of smarticipate tools (process, exercises, results) and the extent to which these tools have been able to achieve their objectives and matching cities expectations. This report will highlight strengths and areas of potential improvements.

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Beta Application 1 testing schedule report

Report on results of first system test with detailed schedule list for improvements (M 30).

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Working document summarizing results of tasks 7.5 to 7.8 for Hamburg

Production of a working document summarizing the results of tasks 7.5 to 7.8 in the City of Hamburg. This will serve as the basis for the elaboration of product specifications.

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

System integrated beta application 1& 2

First system integration and documentation report, which will be superseded by an improved version after 1st testing cycle in Task6.5 (M 18, M28).

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Other 2019-11-18

Working document summarizing results of tasks 7.5 to 7.8 for London

Production of a working document summarizing the results of tasks 7.5 to 7.8 in the City of London. This will serve as the basis for the elaboration of product specifications.

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Integration requirements report

Report specifying system, hardware, software and data specifications along with integration concept and deployment flowchart.

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

smarticipate packaging and deployment report

Test schedule report of packaged beta application with list of improvements for first packaged beta release. Including smarticipate Systems Applications (AIT) – Bug free packaged system components with configuration file and documentation report ready for deployment at city IT infrastructures and piloting of smarticipat and toolset (M33).

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Open Data harmonisation and integration report

User case specific data harmonization and integration into smarticipate server ready for testing and piloting. These will be delivered in two steps, aligned to the sequential approach to the three applications (M 30).

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18

Working document summarizing results of tasks 7.5 to 7.8 for Rome

Production of a working document summarizing the results of tasks 7.5 to 7.8 in the City of Rome. This will serve as the basis for the elaboration of product specifications.

Programme: H2020-EU.3.6. - Topic(s): INSO-1-2015

download deliverable 

Documents, reports 2019-11-18