Opendata, web and dolomites

INTAS project deliverables

The page lists 20 deliverables related to the research project "INTAS".

 List of Deliverables

INTAS: list of downloadable deliverables.
title and desprition type last update

Database and report on EN/IEC/IEEE technical standards

Database and report on EN/IEC/ISO technical standards and National laws/decrees of interest for testing energy performances of A and B product groups separately (M8).

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Creation of project website and FAQs in English language

Electronic, website, printed - Creation of communication materials and tools - project website and FAQs in English language, logo, template, leaflet (x500 copies per national partner) (M6).

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Final policy recommendations for future legislation on Industrial products

Final policy recommendations for future legislation on Industrial products. This report shall be drafted by ECOS, using the outcomes and results throughout work packages 2, 3, and the other tasks of WP4. The final recommendations will be reached by majority consensus of project partners. Specific dissemination of this task and its outcome deliverable 4.4 is outlined in work packages 5 and 6.

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Analysis and report on other applicable regulations on fans

Analysis and report on other applicable regulations, including at the national level, to be considered when undertaking inspection on fans (M23)

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Graphical flow chart of the methodological process, taking into account all tasks within WP3

Graphical flow chart of the methodological process, taking into account all Tasks within WP3 (M24)

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Project summary; half yearly reports for external stakeholders

Electronic leaflet/report - Project summary (M3); half yearly reports (M6, M12, M18, M24, M30, M36) these reports are not the formal Reports for EASME but a summary for external stakeholders.

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Final reports translated (if appropriate) and printed

Electronic and printed reports (50 in English for all partners) - If a translation of final reports into national languages is considered appropriate by specific partners 10 additional reports will be printed in each national language(s). All reports will be collected as evidence of this deliverable (M30).

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Best practice and experiences of both MSAs and industry regarding testing of transformers

Report highlighting the best practice and experiences of both MSAs and industry regarding testing of transformers (M24)

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Report on the overall methodology for the targeting and compliance verification for fans and transformers

Report on the overall methodology for the targeting and compliance verification for fans and transformers. This task assembles the deliverables of WPs 2, 3, 4 and other deliverables in WP5 in order to create a comprehensive document of the findings and outcomes of the project. There will be 3 documents created, for fans and transformers: D5.2, D5.3 and D5.4.

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Final reports summarising findings from fans and transformers

Final reports summarising findings from fans and transformers. This assembles the deliverables of WPs 2, 3, 4 and other deliverables in WP5 in order to create a comprehensive document of the findings and outcomes of the project. There will be 3 documents created, for fans and transformers: D5.2, D5.3 and D5.4.

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Final Methodology on market surveillance of Transformers

Final Methodology on market surveillance of Transformers in the the form of a step-by-step guide aimed mainly at market surveillance authorities and will include a graphical flowchart.

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Final Methodology on market surveillance of Fans

Final Methodology on market surveillance of Fans: in the form of a step-by-step guide aimed mainly at market surveillance authorities and will include a graphical flowchart

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Best practice and experiences of both MSAs and industry regarding testing of fans

Report highlighting the best practice and experiences of both MSAs and industry regarding testing of fans (M24)

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Participation in 2 international events

Article and presentation - Participation in 2 international events and the writing of articles or papers (M36).

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Evaluation of costs, benefits, and new methods of compliance verification

This report will assess generic relationships between large product types to determine whether aspects of the INTAS methodology could be easily exported to other large products such as pumps, large commercial refrigeration products, etc.

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Report on strategic capacity building and awareness raising at the pan-European level

Electronic report - Report on strategic capacity building and awareness raising at the pan-European level (M29)

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Analysis and report on other applicable regulations on transformers

Analysis and report on other applicable regulations, including at the national level, to be considered when undertaking inspection on transformers (M23)

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Report about the screening techniques available for product/supplier targeting

Report about the screening techniques available for product/supplier targeting (M23)

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Coordination of final conference

International event - Coordination of final conference (M33).

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07

Collection of minutes from project meetings providing evidence of consideration of national input and 2 excel tables listing comments and questions with their answers and replies

Modified electronic excel table from D6.1 - Collection of minutes from project meetings, or written evidence of consideration of national input and 2 excel tables listing comments and questions with their answers and replies. Electronic format (M30).

Programme: H2020-EU.3.3.7. - Topic(s): EE-15-2015

download deliverable 

Documents, reports 2019-10-07