Opendata, web and dolomites

MALORCA project deliverables

The page lists 5 deliverables related to the research project "MALORCA".

 List of Deliverables

MALORCA: list of downloadable deliverables.
title and desprition type last update

System Requirement Document

The document is the output of task 1.2 (Consolidation of system requirements). It will define the system requirements with special consideration of interfaces, data content and formats of the data preparation, and data privacy issues in connection to WP2. Functional requirements will be defined to specify clearly what a system is su-posed to accomplish. The performance requirements will be elaborated here.

Programme: H2020-EU.3.4.7.1 - Topic(s): Sesar-02-2015

download deliverable 

Documents, reports 2019-05-31

Report on Stakeholder Workshop Results

Austro Control and ANS CR, are the first test sites who will explore proposed solutions. Both partners plan to organize at least two workshops (within the project duration) to demonstrate the developed tools for all interested stakeholders from other ANSPs and also for interested suppliers.
A first stakeholder workshop will be conducted after 15 months resulting in a draft of this deliverable. After a 23 months a second workshop is planned which will be the input into this deliverable.

Programme: H2020-EU.3.4.7.1 - Topic(s): Sesar-02-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Gap Analysis Report (T0+24)

The last step of WP5 and also of the project will be the gap analysis with respect to achieved results.

Programme: H2020-EU.3.4.7.1 - Topic(s): Sesar-02-2015

download deliverable 

Documents, reports 2019-05-30

Operational Concept Description

The Operation Concept Description will define the user requirements. Based on the operational experience of ANSPs, they will provide the set of use cases in connection to voice recognition application in ATM environment with the main focus on automatic learning of speech recognition parameters. Those uses cases will be evolved from the current operational practise and their identified limitations. This task also identifies the current operating environment from the view of the end users (controllers). Identified use cases will serve as a basis for the user requirements which will be imbedded in the Operational Concept Document

Programme: H2020-EU.3.4.7.1 - Topic(s): Sesar-02-2015

download deliverable 

Documents, reports 2019-05-30

Publishable Project Results final report

The Final Project Report includes a publishable summary of the entire project. The report is the input for the Project Closeout Meeting. This deliverable will summarize the project scope and objectives, the achieved results and main conclusions, the performed communication and dissemination actions, and the exploitation and follow-up activities proposed for the next stage of the R&I lifecycle. It will include a self-assessment of the achieved TRL of the MALORCA unsupervised learning component. Furthermore it will include a short summary of the gap analysis and the stakeholder feedback from the workshops and the proof of concept experiments.

Programme: H2020-EU.3.4.7.1 - Topic(s): Sesar-02-2015

download deliverable 

Documents, reports 2019-05-30