The page lists 14 deliverables related to the research project "UtilitEE".
title and desprition | type | last update |
---|---|---|
Data Management PlanThe deliverable will elaborate the Data Management Plan (DMP) of the project, comprising of (i) handling of research data during & after the project; (ii) what data will be collected, processed or generated; (iii) what methodology & standards will be applied; and (iv) whether data will be shared /made open access/ how data will be curated and preserved. It will define in detail a concrete methodology for ensuring compliance with relevant EU and National Regulations as listed below, as well as, for complying with intra-organization regulations for privacy, data protection and security with regards to the data collected during the pilot implementation of the project Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Open Research Data Pilot | 2020-01-27 |
UtilitEE Branding, Website and Social Media ChannelsThe deliverable consists in the UtilitEE Logo and Associated Dissemination Mock-ups, the project website and social media channels Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Websites, patent fillings, videos etc. | 2020-01-27 |
Utility-driven new Business ModelsThe deliverable will consist in the definition of emerging and innovative utility business models that comply with national regulatory constraints, facilitate the transition into easily accessible energy markets and enable the application of highly effective energy efficiency schemes by utilities Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
UtilitEE Market Analysis Report - First VersionThe deliverable aims at reporting on the market intelligence activities of the project and providing valuable input for the successful business planning of the integrated UtilitEE Solution Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
Pilot Validation Framework and Roll-out PlanThe deliverable will outline the validation approach towards assessing the impact of the project against defined impact KPIs and respective targets, as well as, evaluating the compliance of pilot and project overall results to the user requirements. It will also include pilot validation activities planning including critical milestones, relevant risks and mitigation plans. Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
UtilitEE Dissemination and Communication Plan and Associated Material - First VersionThe deliverable consists in the detailed and well targeted dissemination plan that will uptake all possible and appropriate dissemination channels and means also exploiting the immense collaboration and open deliberation capabilities provided by contemporary social networking Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
UtilitEE Dissemination and Communication Plan and Associated Material - Second VersionThe deliverable consists in the detailed and well targeted dissemination plan that will uptake all possible and appropriate dissemination channels and means also exploiting the immense collaboration and open deliberation capabilities provided by contemporary social networking. The deliverable will report on the dissemination and communication activities of the previous period Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
Pilot Sites Energy Audits and Equipment Installation PlanThe deliverable will report on the audits made in the pilot buildings of the project and detail the equipment installation plan in pilot premises Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
Building Performance Rating Model and UtilitEE PMV Methodology SpecificationsThe deliverable will detail the functionality and features of the Systemic & Enhanced Performance Rating to support the UtilitEE behavioural change approach and will definethe Performance Measurement and Verification Methodology (PMV) to be followed during the pilot validation activities of the project. Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
End-user & business requirementsThis deliverable will focus on the definition of the UtilitEE Business Scenarios and Use Cases and will end-up to the extraction of respective high-level user requirements for the UtilitEE Framework Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
Specifications and high-level design of the UtilitEE Energy Behaviour Change ApproachThe deliverable will consist in the configuration of a personalized activity-based feedback mechanism that will unfreeze, change and refreeze habitual behaviour Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
UtilitEE Activity Energy Model SpecificationsThe deliverable will report on the methodological framework that will enable the real-time identification of activities (of habitual nature) from the energy use data collected from the pilot buildings Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
UtilitEE Living Lab Activities Evaluation Report - First VersionThe deliverable will report on the living lab activities for the period and evaluate them against specific KPIs and effectiveness assessment criteria Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Documents, reports | 2020-01-27 |
UtilitEE Sensing Network & Information Management ModuleThis deliverable will report on the setup and configuration of the UtilitEE Information Management Services Programme: H2020-EU.3.3.1. - Topic(s): EE-07-2016-2017 |
Demonstrators, pilots, prototypes | 2020-01-27 |