Progetti FP7 coordinati da "Institut de radioprotection et de surete nucleaire"

# progetto  anno  totale costo  contributi 
1 ASAMPSA2 Advanced Safety Assessment Methodologies : level 2 PSA (European Best Practices L2 PSA guidelines) 2008 2˙112˙056.00 1˙499˙998.00
2 SARNET2 Severe Accident Research Network of Excellence 2 2009 39˙588˙707.00 5˙750˙000.00
3 STAR Strategy for Allied Radioecology 2011 8˙042˙738.00 3˙999˙756.00
4 JASMIN Joint Advanced Severe accidents Modelling and Integration for Na-cooled fast neutron reactors 2011 5˙650˙533.00 2˙991˙182.00
5 SARGEN_IV Proposal for a harmonized European methodology for the safety assessment of innovative reactors with fast neutron spectrum planned to be built in Europe 2012 1˙293˙111.00 999˙128.00
6 SITEX Sustainable network of Independent Technical EXpertise for radioactive waste disposal 2012 1˙363˙512.00 950˙080.00
7 PASSAM Passive and Active Systems on Severe Accident source term Mitigation 2013 5˙111˙546.00 3˙600˙000.00
8 OPERRA Open Project for the European Radiation Research Area 2013 10˙256˙172.00 8˙000˙000.00
9 ASAMPSA_E Advanced Safety Assessment : Extended PSA 2013 4˙043˙346.00 2˙999˙999.00

Altri progetti

L'Ente institut de radioprotection et de surete nucleaire partecipato anche in questi progetti.