WETMATE

WETMATE – a 33kV Subsea Wet-Mateable Connector for Offshore Renewable Energy

 Coordinatore HYDRO BOND ENGINEERING LIMITED 

 Organization address address: CLAYMORE AVENUE ABERDEEN SCIENCE AND ENERGY PARK BRIDGE OF DON
city: ABERDEEN
postcode: AB238GW

contact info
Titolo: Ms.
Nome: Lynn
Cognome: Rennie
Email: send email
Telefono: +44 01224 254261

 Nazionalità Coordinatore United Kingdom [UK]
 Totale costo 1˙601˙614 €
 EC contributo 1˙207˙378 €
 Programma FP7-SME
Specific Programme "Capacities": Research for the benefit of SMEs
 Code Call FP7-SME-2012
 Funding Scheme BSG-SME
 Anno di inizio 2012
 Periodo (anno-mese-giorno) 2012-12-01   -   2015-09-30

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    HYDRO BOND ENGINEERING LIMITED

 Organization address address: CLAYMORE AVENUE ABERDEEN SCIENCE AND ENERGY PARK BRIDGE OF DON
city: ABERDEEN
postcode: AB238GW

contact info
Titolo: Ms.
Nome: Lynn
Cognome: Rennie
Email: send email
Telefono: +44 01224 254261

UK (ABERDEEN) coordinator 556˙753.08
2    MARINE SIGNALS SL

 Organization address address: C PRACTICANTE IGNACIO RODRIGUEZ SN OFFICINA 12 ED DE SERVICIOS I D I CAMPUS UNIVERSITARIO DE TAFIRA
city: LAS PALMAS
postcode: 35017

contact info
Titolo: Mr.
Nome: Francisco
Cognome: Concepcion
Email: send email
Telefono: 34928454953

ES (LAS PALMAS) participant 260˙026.20
3    FORTIS MECHANICAL DESIGN LIMITED

 Organization address address: PICKTHALL GROUND BROUGHTON MILLS
city: BROUGHTON IN FURNESS CUMBRIA
postcode: LA20 6AT

contact info
Titolo: Mr.
Nome: Stephen
Cognome: Lainson
Email: send email
Telefono: 441230000000
Fax: 441230000000

UK (BROUGHTON IN FURNESS CUMBRIA) participant 169˙896.54
4    NORDIC SEAL AS

 Organization address address: HEGDALRINGEN 19
city: LARVIK
postcode: 3261

contact info
Titolo: Mr.
Nome: Per
Cognome: Stokkan
Email: send email
Telefono: +47 33140570

NO (LARVIK) participant 166˙431.99
5    THE UK INTELLIGENT SYSTEMS RESEARCH INSTITUTE LIMITED

 Organization address address: MIDDLE ASTON HOUSE
city: OXFORDSHIRE
postcode: OX25 5PT

contact info
Titolo: Mr.
Nome: Simon
Cognome: Fawcett
Email: send email
Telefono: +44 1664 501 214

UK (OXFORDSHIRE) participant 47˙163.00
6    DANMARKS TEKNISKE UNIVERSITET

 Organization address address: Anker Engelundsvej 1, Building 101A
city: KONGENS LYNGBY
postcode: 2800

contact info
Titolo: Mr.
Nome: Joachim
Cognome: Holboell
Email: send email
Telefono: +45 45 25 35 15
Fax: +45 45 93 40 28

DK (KONGENS LYNGBY) participant 4˙562.00
7    NOVAMINA CENTAR INOVATIVNIH TEHNOLOGIJA DOO

 Organization address address: JACKOVINSLI KLANEC 17
city: Zagreb
postcode: 10000

contact info
Titolo: Mrs.
Nome: Jasmina
Cognome: Petrinovic
Email: send email
Telefono: +385 1 3499 836
Fax: +385 1 3793 345

HR (Zagreb) participant 2˙545.19
8    E.ON CLIMATE & RENEWABLES UK LIMITED

 Organization address address: WESTWOOD WAY WESTWOOD BUSINESS PARK
city: COVENTRY WEST MIDLANDS
postcode: CV4 8LG

contact info
Titolo: Mr.
Nome: Clym
Cognome: Stock-Williams
Email: send email
Telefono: +44 02476 192199

UK (COVENTRY WEST MIDLANDS) participant 0.00
9    OMNISENS SA

 Organization address address: RIOND BOSSON 3
city: MORGES

contact info
Titolo: Mr.
Nome: Etienne
Cognome: Rochat
Email: send email
Telefono: +41 21 510 21 21
Fax: +41 44 274 20 31

CH (MORGES) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

mate    depths    wet    km    routine    maintenance    connectors    cable    transmission    monitoring       wind    connector   

 Obiettivo del progetto (Objective)

'Most European offshore wind farms are currently installed within 20 km of the coast in shallow water depths up to 20m. The next generation will be developed at distances of 40 km in sea depths up to 80m. These new locations present technical challenges for engineering and the possibility of new synergies between all marine renewable energy resources including wave, tide and wind. Inspection and maintenance at depth is difficult and the raising of transmission voltages to keep cable sizes manageable is urgently required as the technical difficulty of hauling heavy cables is significantly increased. The availability of self-monitoring connectors to eliminate routine maintenance at greater depths is seen as a potential step-change improvement in infrastructure management and the development of ROV-installable wet-mate connectors as an alternative to dry-mated cable is a dominant industry objective. We will deliver a prototype 33kV hybrid wet-mate connector with a connectivity monitoring system and future-proof features for higher voltage connector technologies. This will lead to efficient power transmission, reduced installation and maintenance costs and precision remote monitoring that reduces routine maintenance and intervention by divers, benefitting health, safety and affordability.'

Altri progetti dello stesso programma (FP7-SME)

NOFIRE (2009)

High Speed Fire Stopping Sectional Door

Read More  

MOBI-WELD (2013)

Low force mobile friction stir welding system for on-site marine fabrication

Read More  

OPTOCO2FISH (2009)

Development of an Opto-chemical Carbon Dioxide Sensor for Aquaculture and Oceanography Applications

Read More