Opendata, web and dolomites

RADIO project deliverables

The page lists 58 deliverables related to the research project "RADIO".

 List of Deliverables

RADIO: list of downloadable deliverables.
title and desprition type last update

Actual & perceived privacy considerations and ethical requirements II

FZ is main responsible for delivery, with contributions from NCSR-D, FSL and FHAG.

The report must include an updated literature review containing the sociological, ethical and gender-related projections on medical data collection (M3). It will further describe the impact of these considerations in the design of RADIO and set the privacy and ethical framework of the system, taking into account the target group. (M18)

These deliverables are prepared within Task 2.2 and satisfy Objective 2.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-31

Conceptual architecture for sensing methods and sensor data sharing II

S&C is main responsible for delivery, with contributions from NCSR-D, TWG, RUB, and AVN.

Architecture document, pertaining to the information dependencies and interoperability between RADIO components for satisfying the medical information requirements set in WP2. The initial and intermediate versions (M6/M18) are used to drive development in Task 3.2; for M19 until M24 this is a living document, updated to record adjustments necessitated as development in Task 3.2 progresses. The final version (M24) documents the architecture and interfacing of the final data analysis methods (D3.5).

These deliverables are prepared within Task 3.1 and satisfy Objective 3.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-31

Conceptual architecture for sensing methods and sensor data sharing I

S&C is main responsible for delivery, with contributions from NCSR-D, TWG, RUB, and AVN.

Architecture document, pertaining to the information dependencies and interoperability between RADIO components for satisfying the medical information requirements set in WP2. The initial and intermediate versions (M6/M18) are used to drive development in Task 3.2; for M19 until M24 this is a living document, updated to record adjustments necessitated as development in Task 3.2 progresses. The final version (M24) documents the architecture and interfacing of the final data analysis methods (D3.5).

These deliverables are prepared within Task 3.1 and satisfy Objective 3.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-31

Early detection methods & relevant system requirements III

FSL is main responsible for delivery, with contributions from FHAG and FZ.
The first version of the report (M1) will detail the profile and number of participants and how long they will work with the consortium. Based on this definition of the end user target group, the second version (M3) will set the criteria for choosing relevant system requirements. A detailed list of these requirements will be included in this report, where each item of the list is justified based on the aforementioned criteria. The final version of the report (M18) refines and updates these criteria and requirements, based on subsequent research.
These deliverables are prepared within Task 2.1 and satisfy Objective 1.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-31

Early detection methods & relevant system requirements II

FSL is main responsible for delivery, with contributions from FHAG and FZ.

The first version of the report (M1) will detail the profile and number of participants and how long they will work with the consortium. Based on this definition of the end user target group, the second version (M3) will set the criteria for choosing relevant system requirements. A detailed list of these requirements will be included in this report, where each item of the list is justified based on the aforementioned criteria. The final version of the report (M18) refines and updates these criteria and requirements, based on subsequent research.
These deliverables are prepared within Task 2.1 and satisfy Objective 1.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-31

Conceptual architecture for sensing methods and sensor data sharing III

S&C is main responsible for delivery, with contributions from NCSR-D, TWG, RUB, and AVN.

Architecture document, pertaining to the information dependencies and interoperability between RADIO components for satisfying the medical information requirements set in WP2. The initial and intermediate versions (M6/M18) are used to drive development in Task 3.2; for M19 until M24 this is a living document, updated to record adjustments necessitated as development in Task 3.2 progresses. The final version (M24) documents the architecture and interfacing of the final data analysis methods (D3.5).

These deliverables are prepared within Task 3.1 and satisfy Objective 3.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-31

Actual & perceived privacy considerations and ethical requirements I

FZ is main responsible for delivery, with contributions from NCSR-D, FSL and FHAG.

The report must include an updated literature review containing the sociological, ethical and gender-related projections on medical data collection (M3). It will further describe the impact of these considerations in the design of RADIO and set the privacy and ethical framework of the system, taking into account the target group. (M18)

These deliverables are prepared within Task 2.2 and satisfy Objective 2.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-31

Guidelines for balancing between medical requirements and obtrusiveness II

FHAG is main responsible for delivery, with contributions from FSL and FZ.

This report must integrate the findings of the previous deliverables; define the trade-off between medical requirements, and ethical/privacy demands (M9). Based on these a final medical requirements description must be enlisted (M18).

These deliverables are prepared within Task 2.3 and satisfy Objective 3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-31

Guidelines for balancing between medical requirements and obtrusiveness I

FHAG is main responsible for delivery, with contributions from FSL and FZ.

This report must integrate the findings of the previous deliverables; define the trade-off between medical requirements, and ethical/privacy demands (M9). Based on these a final medical requirements description must be enlisted (M18).

These deliverables are prepared within Task 2.3 and satisfy Objective 3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-31

Robust and energy-efficient hardware components II

AVN is main responsible for delivery, with contributions from TWG and RUB.
This deliverable comprises a library of dedicated hardware components and a report presenting the design, implementation, performance, and power consumption characteristics of the components.
These deliverables are prepared within Task 4.2 and satisfy WP Objective 4.1 and 4.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Integrated data analysis system II

TWG is main responsible for delivery, with contributions from NCSR-D and S&C.
This deliverable consists of (a) the integrated data analysis prototype that integrates the prototypes D3.2, D3.3, D3.4; and (b) a report setting requirements on the data provided by the sensor hardware and on the transfer, security, privacy and authentication characteristics of the communication protocols.
These deliverables are prepared within Task 3.5 and satisfy Objectives 3.3 and 3.5.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Project Website Structure

NCSR-D is main responsible for delivery, with contributions from all partners.
The product of this deliverable is: a) the RADIO website informing the scientific community and the general public about the results and activities of the project, b) RADIO accounts on various social platforms.
These deliverables are prepared within Task 7.2 and satisfies Objectives 7.1, 7.2, 7.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Dissemination and communication plan III

NCSR-D is main responsible for delivery, with contributions from all partners.
The report: a) establishes procedures for uploading content by the partners and describes the kinds of content that will be uploaded throughout the project, b) plans in detail the T7.2 activities.
These deliverables are prepared within Task 7.2 and satisfies Objectives 7.1, 7.2, 7.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

User evaluation report II

FZ is main responsible for delivery, with contributions from FHAG.
This deliverable will report the finding of User evaluation in terms of usability of the system and improvement in quality of life. The report must mention in details the measured variables, the analysis methods used, the results, and a brief summary discussing the main findings and their implications
These deliverables are prepared within Task 6.4 and satisfies Objective 6.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

User evaluation report III

FZ is main responsible for delivery, with contributions from FHAG.
This deliverable will report the finding of User evaluation in terms of usability of the system and improvement in quality of life. The report must mention in details the measured variables, the analysis methods used, the results, and a brief summary discussing the main findings and their implications
These deliverables are prepared within Task 6.4 and satisfies Objective 6.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Project showcase

NCSR-D is main responsible for delivery, with contributions from all partners.
A package (in the form of set of documents and software components) with the main results of the project and a brief, self-explanatory description of each core contribution/outcome. The Commission will be granted the right to use the project showcase for its own dissemination and awareness activities (including Web based and electronic publications). The project showcase will feature a meaningful demonstration of the functionality of the overall RADIO system, along with relevant copyright notices and contact information, and suitable installation aids and run-time interfaces.
This deliverable is prepared within Task 7.2 and satisfies Objectives 7.1, 7.2, 7.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Other 2019-05-30

Dissemination and communication plan I

NCSR-D is main responsible for delivery, with contributions from all partners.
The report: a) establishes procedures for uploading content by the partners and describes the kinds of content that will be uploaded throughout the project, b) plans in detail the T7.2 activities.
These deliverables are prepared within Task 7.2 and satisfies Objectives 7.1, 7.2, 7.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Project Website

NCSR-D is main responsible for delivery, with contributions from all partners.
The product of this deliverable is: a) the RADIO website informing the scientific community and the general public about the results and activities of the project, b) RADIO accounts on various social platforms.
These deliverables are prepared within Task 7.2 and satisfies Objectives 7.1, 7.2, 7.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Piloting plan II

FZ is main responsible for delivery, with contributions from FSL and FHAG.
This report documents the criteria to be used for subject selection and the procedures followed for deploying the RADIO system and executing the pilot. It also describes the data that will be collected, the procedures for making parallel human observations for estimating the accuracy of the data, and the policies for data retention and analysis. This report also includes the original text of the consent forms signed by the subjects and their English language translations.
These deliverables are prepared within Task 6.1 and satisfies Objective 6.1.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

User interfaces I

S&C is main responsible for delivery, with contributions from NCSR-D and ROBOTNIK.
This deliverable includes the 3 visual user interfaces as described in Task 5.2. It will also include a report mentioning any innovating methods uses in building the GUIs. A final outcome of this deliverable are the users manuals for each GUI separately.
These deliverables are prepared within Task 5.2 and satisfies Objective 5.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Architecture of the RADIO ecosystem II

NCSR-D is main responsible for delivery, with contributions from TWG, RUB, and S&C.
Architecture and interfaces for efficient and privacy-preserving data exchange between RADIO deployments, the formal and informal care-givers’ applications, and medical care institutions that operate across a wide area.
These deliverables are prepared within Task 5.1 and satisfies Objective 5.1 and 5.2.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Integrated robotic platform I

ROBOTNIK is main responsible for delivery, with contributions from NCSR-D, RUB, TWG.
In the first version (M15) the complete design of the RADIO mobile platform will be finalized. In the final version (M30) the fully functional robot prototype will be delivered.
These deliverables are prepared within Task 4.3 and satisfy WP Objective 4.2.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Network robustness and efficiency methods II

TWG is main responsible for delivery, with contributions from S&C and AVN.
Methods for improving network robustness and communication efficiency. The scope of delivery comprises (a) the report that documents the methods and (b) the prototype implementations that will be integrated into deliverables D3.9 and D3.10.
These deliverables are prepared within Task 3.3 and satisfy Objective 3.2.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

ADL and mood recognition methods I

R-PU. NCSR-D is main responsible for delivery, with contributions from TWG, RUB, and AVN.
Methods for ADL and mood recognition from visual and acoustic data. The scope of delivery comprises (a) the report that documents the methods and (b) the prototype implementations that will be integrated into deliverables D3.9 and D3.10.
These deliverables are prepared within Task 3.2 and satisfy Objective 3.1.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Robust and energy-efficient hardware components I

AVN is main responsible for delivery, with contributions from TWG and RUB.
This deliverable comprises a library of dedicated hardware components and a report presenting the design, implementation, performance, and power consumption characteristics of the components.
These deliverables are prepared within Task 4.2 and satisfy WP Objective 4.1 and 4.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

ADL and mood recognition methods II

R-PU. NCSR-D is main responsible for delivery, with contributions from TWG, RUB, and AVN.
Methods for ADL and mood recognition from visual and acoustic data. The scope of delivery comprises (a) the report that documents the methods and (b) the prototype implementations that will be integrated into deliverables D3.9 and D3.10.
These deliverables are prepared within Task 3.2 and satisfy Objective 3.1.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Network robustness and efficiency methods I

TWG is main responsible for delivery, with contributions from S&C and AVN.
Methods for improving network robustness and communication efficiency. The scope of delivery comprises (a) the report that documents the methods and (b) the prototype implementations that will be integrated into deliverables D3.9 and D3.10.
These deliverables are prepared within Task 3.3 and satisfy Objective 3.2.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Architecture of the RADIO ecosystem III

NCSR-D is main responsible for delivery, with contributions from TWG, RUB, and S&C.
Architecture and interfaces for efficient and privacy-preserving data exchange between RADIO deployments, the formal and informal care-givers’ applications, and medical care institutions that operate across a wide area.
These deliverables are prepared within Task 5.1 and satisfies Objective 5.1 and 5.2.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Project fact sheet IV

NCSR-D is main responsible for delivery, with contributions from all partners.
A brief project Fact Sheet suitable for Web publishing. The Fact Sheet will outline the project\'s rationale and objectives, specify its technical baseline and intended target groups and application domains, and present intermediate and final outputs. The Fact Sheet will be used by the Commission for its own dissemination and awareness activities throughout the project lifecycle, and will be published on EC and EC sponsored websites. The Fact Sheet will be maintained and updated until the end of the project.
These deliverables are prepared within Task 7.2 and satisfies Objective 7.1, 7.2, 7.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Piloting plan III

FZ is main responsible for delivery, with contributions from FSL and FHAG.
This report documents the criteria to be used for subject selection and the procedures followed for deploying the RADIO system and executing the pilot. It also describes the data that will be collected, the procedures for making parallel human observations for estimating the accuracy of the data, and the policies for data retention and analysis. This report also includes the original text of the consent forms signed by the subjects and their English language translations.
These deliverables are prepared within Task 6.1 and satisfies Objective 6.1.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Dissemination and communication plan II

NCSR-D is main responsible for delivery, with contributions from all partners.
The report: a) establishes procedures for uploading content by the partners and describes the kinds of content that will be uploaded throughout the project, b) plans in detail the T7.2 activities.
These deliverables are prepared within Task 7.2 and satisfies Objectives 7.1, 7.2, 7.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Medical evaluation report I

FHAG is main responsible for delivery, with contributions from FSL.
This report documents the medical evaluation process performed on nursing home residents and elderly people living in the community participating on the RADIO project. Outcomes will be a detailed document for the operational medical evaluation plan as well as the medical and scientific evaluation final report. This deliverable will report the medical results of the project and it will be delivered in three stages.
These deliverables are prepared within Task 6.5 and satisfies Objective 6.5.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Project fact sheet I

NCSR-D is main responsible for delivery, with contributions from all partners.
A brief project Fact Sheet suitable for Web publishing. The Fact Sheet will outline the project\'s rationale and objectives, specify its technical baseline and intended target groups and application domains, and present intermediate and final outputs. The Fact Sheet will be used by the Commission for its own dissemination and awareness activities throughout the project lifecycle, and will be published on EC and EC sponsored websites. The Fact Sheet will be maintained and updated until the end of the project.
These deliverables are prepared within Task 7.2 and satisfies Objective 7.1, 7.2, 7.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Piloting plan IV

FZ is main responsible for delivery, with contributions from FSL and FHAG.
This report documents the criteria to be used for subject selection and the procedures followed for deploying the RADIO system and executing the pilot. It also describes the data that will be collected, the procedures for making parallel human observations for estimating the accuracy of the data, and the policies for data retention and analysis. This report also includes the original text of the consent forms signed by the subjects and their English language translations.
These deliverables are prepared within Task 6.1 and satisfies Objective 6.1.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Integrated RADIO prototype II

S&C is main responsible for delivery, with contributions from NCSR-D.
RADIO ecosystems including hardware and software parts will be delivered in two outputs. A preliminary version will be delivered in M24 for intermediate deployment. Feedback from Task 6.3 will retrofit on-going integration towards the final and fully functional version that will cover final deployment in Task 6.3.
These deliverables are prepared within Task 5.5 and satisfies Objective 5.7.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Integrated RADIO prototype I

S&C is main responsible for delivery, with contributions from NCSR-D.
RADIO ecosystems including hardware and software parts will be delivered in two outputs. A preliminary version will be delivered in M24 for intermediate deployment. Feedback from Task 6.3 will retrofit on-going integration towards the final and fully functional version that will cover final deployment in Task 6.3.
These deliverables are prepared within Task 5.5 and satisfies Objective 5.7.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Medical evaluation report II

FHAG is main responsible for delivery, with contributions from FSL.
This report documents the medical evaluation process performed on nursing home residents and elderly people living in the community participating on the RADIO project. Outcomes will be a detailed document for the operational medical evaluation plan as well as the medical and scientific evaluation final report. This deliverable will report the medical results of the project and it will be delivered in three stages.
These deliverables are prepared within Task 6.5 and satisfies Objective 6.5.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Integrated smart home with robotic platform extensions II

S&C is main responsible for delivery, with contributions from TWG, RUB, and ROBOTNIK.
The prototype will include a set of software packages running in its corresponding hardware device within the RADIO system (robot and smart home system gateway) demonstrating RADIO capabilities at home level.
These deliverables are prepared within Task 4.4 and satisfy WP Objective 4.5.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Large-scale and privacy-preserving data fusion and interpretation II

NCSR-D is main responsible for delivery, with contributions from TWG, RUB, and S&C.
This deliverable will focus on all related data management processes concerning both technical related controls to protect against respective privacy/security issues and attacks as well as data management procedures aiming to defend the RADIO platform against soft issues such as information misuse, unauthorized access, accidental error etc.
These deliverables are prepared within Tasks 5.3 and 5.4 and satisfies Objectives 5.5 and 5.6.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Piloting plan I

FZ is main responsible for delivery, with contributions from FSL and FHAG.
This report documents the criteria to be used for subject selection and the procedures followed for deploying the RADIO system and executing the pilot. It also describes the data that will be collected, the procedures for making parallel human observations for estimating the accuracy of the data, and the policies for data retention and analysis. This report also includes the original text of the consent forms signed by the subjects and their English language translations.
These deliverables are prepared within Task 6.1 and satisfies Objective 6.1.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Integrated data analysis system I

TWG is main responsible for delivery, with contributions from NCSR-D and S&C.
This deliverable consists of (a) the integrated data analysis prototype that integrates the prototypes D3.2, D3.3, D3.4; and (b) a report setting requirements on the data provided by the sensor hardware and on the transfer, security, privacy and authentication characteristics of the communication protocols.
These deliverables are prepared within Task 3.5 and satisfy Objectives 3.3 and 3.5.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Project fact sheet III

NCSR-D is main responsible for delivery, with contributions from all partners.
A brief project Fact Sheet suitable for Web publishing. The Fact Sheet will outline the project\'s rationale and objectives, specify its technical baseline and intended target groups and application domains, and present intermediate and final outputs. The Fact Sheet will be used by the Commission for its own dissemination and awareness activities throughout the project lifecycle, and will be published on EC and EC sponsored websites. The Fact Sheet will be maintained and updated until the end of the project.
These deliverables are prepared within Task 7.2 and satisfies Objective 7.1, 7.2, 7.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Early detection methods & relevant system requirements I

FSL is main responsible for delivery, with contributions from FHAG and FZ.

The first version of the report (M1) will detail the profile and number of participants and how long they will work with the consortium. Based on this definition of the end user target group, the second version (M3) will set the criteria for choosing relevant system requirements. A detailed list of these requirements will be included in this report, where each item of the list is justified based on the aforementioned criteria. The final version of the report (M18) refines and updates these criteria and requirements, based on subsequent research.

These deliverables are prepared within Task 2.1 and satisfy Objective 1.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

User evaluation report IV

FZ is main responsible for delivery, with contributions from FHAG.
This deliverable will report the finding of User evaluation in terms of usability of the system and improvement in quality of life. The report must mention in details the measured variables, the analysis methods used, the results, and a brief summary discussing the main findings and their implications
These deliverables are prepared within Task 6.4 and satisfies Objective 6.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Guidelines for RADIO configuration and deployment

S&C is main responsible for delivery, with contributions from TWG, RUB, and ROBOTNIK.
This document clarifies and documents dependencies and overlaps between the functionalities of the various components developed within RADIO as well as commercially available components that have been integrated into the pilot deployments. Without delving into the technical reasons behind such dependencies and overlaps (reported in D4.1), this document provides guidelines that distil experience gained during the project so that designers of specific RADIO configurations and deployments can take full advantage of the system’s modularity and extendibility. This material will be made available on a Creative Commons license that allows its usage by anybody for preparing educational material or any other commercial or freely available resources.
This deliverable is prepared within Task 7.5 and satisfies Objective 7.6.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Integrated robotic platform II

ROBOTNIK is main responsible for delivery, with contributions from NCSR-D, RUB, TWG.
In the first version (M15) the complete design of the RADIO mobile platform will be finalized. In the final version (M30) the fully functional robot prototype will be delivered.
These deliverables are prepared within Task 4.3 and satisfy WP Objective 4.2.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Medical evaluation report III

FHAG is main responsible for delivery, with contributions from FSL.
This report documents the medical evaluation process performed on nursing home residents and elderly people living in the community participating on the RADIO project. Outcomes will be a detailed document for the operational medical evaluation plan as well as the medical and scientific evaluation final report. This deliverable will report the medical results of the project and it will be delivered in three stages.
These deliverables are prepared within Task 6.5 and satisfies Objective 6.5.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

User evaluation report I

FZ is main responsible for delivery, with contributions from FHAG.
This deliverable will report the finding of User evaluation in terms of usability of the system and improvement in quality of life. The report must mention in details the measured variables, the analysis methods used, the results, and a brief summary discussing the main findings and their implications
These deliverables are prepared within Task 6.4 and satisfies Objective 6.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Architecture for extending smart homes with robotic platforms I

RUB is main responsible for delivery, with contributions from TWG, S&C and AVN.
Architecture document, pertaining to RADIO device interconnection and interfacing; specifications on interfacing the different domains; and on fast and energy efficient data processing in the distributed RADIO environment.
The initial and intermediate versions (M6/M18) are used to drive development in Tasks 4.2 and 4.3; for M19 until M30 this is a living document, updated to record adjustments necessitated as development in Task 4.2 progresses. The final version (M30) documents the architecture and interfacing of the final hardware components (D4.5) and robotic platform (D4.7).
These deliverables are prepared within Task 4.1 and satisfy WP Objectives 4.3 and 4.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Large-scale and privacy-preserving data fusion and interpretation I

NCSR-D is main responsible for delivery, with contributions from TWG, RUB, and S&C.
This deliverable will focus on all related data management processes concerning both technical related controls to protect against respective privacy/security issues and attacks as well as data management procedures aiming to defend the RADIO platform against soft issues such as information misuse, unauthorized access, accidental error etc.
These deliverables are prepared within Tasks 5.3 and 5.4 and satisfies Objectives 5.5 and 5.6.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Architecture for extending smart homes with robotic platforms III

R-PU. RUB is main responsible for delivery, with contributions from TWG, S&C and AVN.
Architecture document, pertaining to RADIO device interconnection and interfacing; specifications on interfacing the different domains; and on fast and energy efficient data processing in the distributed RADIO environment.
The initial and intermediate versions (M6/M18) are used to drive development in Tasks 4.2 and 4.3; for M19 until M30 this is a living document, updated to record adjustments necessitated as development in Task 4.2 progresses. The final version (M30) documents the architecture and interfacing of the final hardware components (D4.5) and robotic platform (D4.7).
These deliverables are prepared within Task 4.1 and satisfy WP Objectives 4.3 and 4.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Guidelines for RADIO application developers

NCSR-D is main responsible for delivery, with contributions from S&C.
This report documents the programmatic interfaces for creating applications for the RADIO ecosystem. Without delving into the technical reasons behind architectural and interfacing decisions (reported in D5.1), this document provides training and reference material for the community. This material will be made available on a Creative Commons license that allows its usage by anybody for preparing educational material or any other commercial or freely available resources.
This deliverable is prepared within Task 7.5 and satisfies Objective 7.6.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Integrated smart home with robotic platform extensions I

S&C is main responsible for delivery, with contributions from TWG, RUB, and ROBOTNIK.
The prototype will include a set of software packages running in its corresponding hardware device within the RADIO system (robot and smart home system gateway) demonstrating RADIO capabilities at home level.
These deliverables are prepared within Task 4.4 and satisfy WP Objective 4.5.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

User interfaces II

S&C is main responsible for delivery, with contributions from NCSR-D and ROBOTNIK.
This deliverable includes the 3 visual user interfaces as described in Task 5.2. It will also include a report mentioning any innovating methods uses in building the GUIs. A final outcome of this deliverable are the users manuals for each GUI separately.
These deliverables are prepared within Task 5.2 and satisfies Objective 5.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Social network analysis component

NCSR-D is main responsible for delivery, with contributions from RUB.
Methods for mood and behaviour recognition from social network interactions. The scope of delivery comprises (a) the report that documents the methods and (b) the prototype implementations that will be integrated into deliverable D3.10.
This deliverable is prepared within Task 3.4 and satisfies Objective 3.1.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Architecture for extending smart homes with robotic platforms II

RUB is main responsible for delivery, with contributions from TWG, S&C and AVN.
Architecture document, pertaining to RADIO device interconnection and interfacing; specifications on interfacing the different domains; and on fast and energy efficient data processing in the distributed RADIO environment.
The initial and intermediate versions (M6/M18) are used to drive development in Tasks 4.2 and 4.3; for M19 until M30 this is a living document, updated to record adjustments necessitated as development in Task 4.2 progresses. The final version (M30) documents the architecture and interfacing of the final hardware components (D4.5) and robotic platform (D4.7).
These deliverables are prepared within Task 4.1 and satisfy WP Objectives 4.3 and 4.4.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Project fact sheet II

NCSR-D is main responsible for delivery, with contributions from all partners.
A brief project Fact Sheet suitable for Web publishing. The Fact Sheet will outline the project\'s rationale and objectives, specify its technical baseline and intended target groups and application domains, and present intermediate and final outputs. The Fact Sheet will be used by the Commission for its own dissemination and awareness activities throughout the project lifecycle, and will be published on EC and EC sponsored websites. The Fact Sheet will be maintained and updated until the end of the project.
These deliverables are prepared within Task 7.2 and satisfies Objective 7.1, 7.2, 7.3.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30

Architecture of the RADIO ecosystem I

NCSR-D is main responsible for delivery, with contributions from TWG, RUB, and S&C.
Architecture and interfaces for efficient and privacy-preserving data exchange between RADIO deployments, the formal and informal care-givers’ applications, and medical care institutions that operate across a wide area.
These deliverables are prepared within Task 5.1 and satisfies Objective 5.1 and 5.2.

Programme: H2020-EU.3.1.4. - Topic(s): PHC-19-2014

download deliverable 

Documents, reports 2019-05-30