Opendata, web and dolomites

Lt-AD SIGNED

Low-temperature Anaerobic Digestion treatment of low-strength wastewaters

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Lt-AD project word cloud

Explore the words cloud of the Lt-AD project. It provides you a very rough idea of what is the project "Lt-AD" about.

producing    recirculation    emissions    ad    heat    dairy    yields    ww    annually    treats    12    months    lowered    footprint    resale    rhi    ghg    temperatures    strength    deg    day    ambient    drinks    conventional    thermal    125    sectors    billion    plant    etv    reuse    rate    business    aerobic    post    uwwd    risk    promotional    assets    protection    aeration    fuels    environmental    industrial    payback    biogas    treatment    unsustainable    input    cod    market    energy    latter    106    367    wastewater    period    nvp    channel    20    conjunction    temperature    site    directive    milk    gas    compact    generates    gain    first    urban    greenhouse    operation    solution    ip    alone    negligible    successfully    data    annual    litres    mg    100    digestion    food    effluent    ahead    no    revenue    opex    reliant    m3    374    commercialisation    produces    relationship    662    anaerobic    volumes    176    provides    hugely    standard    materials    savings    49    fossil    install    demonstrator    lt    sludge   

Project "Lt-AD" data sheet

The following table provides information about the project.

Coordinator
NVP ENERGY LIMITED 

Organization address
address: POST BOX 4, BLOCK 4, MARLINSTOWN OFFICE PARK, DUBLIN ROAD
city: MULLINGAR, CO. WESTMEATH
postcode: n.a.
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Ireland [IE]
 Project website http://www.lowtemp-ad.eu
 Total cost 2˙418˙815 €
 EC max contribution 1˙693˙170 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2015
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-06-01   to  2018-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    NVP ENERGY LIMITED IE (MULLINGAR, CO. WESTMEATH) coordinator 1˙014˙223.00
2    HYDRO INTERNATIONAL LIMITED IE (NAVAN) participant 495˙653.00
3    J.K. FABRICATIONS LIMITED UK (NEWRY DOWN) participant 183˙293.00

Map

 Project objective

No need for heat! NVP Energy presents the first to market, high-rate AD technology that successfully treats low strength wastewater (WW) at ambient temperatures (4 - 20°C). The low-temperature anaerobic digestion (Lt-AD) process provides a novel solution to Food and Drinks industrial sectors which produce large volumes of WW. The European milk treatment and processing sector alone generates over 367 billion litres annually which is typically treated using conventional aerobic processes. The latter treatment process is unsustainable. It results in high sludge yields, requires a large footprint on-site and is hugely reliant on fossil fuels for aeration. The Lt-AD technology produces negligible sludge volumes, presents a compact design, requires no heat input or biogas recirculation, and produces effluent of urban wastewater directive (UWWD) standard (< 125 mg/L COD) without post-aeration. Comparing Lt-AD to conventional aerobic treatment of WW from a typical dairy processing plant producing 2,000 m3 WW per day, Lt-AD can provide annual OPEX savings of €1,662,106 p.a over a payback period of 2.49 years that includes RHI revenue of €374,176. The low temperature operation of Lt-AD allows for 100% of the biogas produced being available for reuse or resale. Lt-AD also has a high impact on environmental savings through reduced greenhouse gas (GHG) emissions and lowered thermal energy and fossil fuels requirements. This Phase 2 project will allow NVP Energy install and commission a demonstrator plant and gain 8-12 months operational data. The results obtained, in conjunction with ETV assessment, will build the business case for each targeted market channel ahead of commercialisation. Other key project objectives include: commercialisation partner relationship development; promotional materials development; exploitation planned; assessment and protection of IP assets and project risk management.

 Deliverables

List of deliverables.
Lt-AD operation simulation model Other 2019-05-31 18:17:52
Process maps for relevant standards Other 2019-05-31 18:17:51
Project website Demonstrators, pilots, prototypes 2019-05-31 18:17:47

Take a look to the deliverables list in detail:  detailed list of Lt-AD deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "LT-AD" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "LT-AD" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

DUSTCOMB (2018)

A Novel Technology to Reduce Industrial Dust Pollution and to Enable Most Efficient Energy Recovery

Read More  

CleanCoat (2017)

Development of eco-friendly architectural coil coatings for clean buildings and pollution-free air

Read More  

APA (2018)

Filter-less water-based Air Pollution Abatement system

Read More