Opendata, web and dolomites

Lt-AD SIGNED

Low-temperature Anaerobic Digestion treatment of low-strength wastewaters

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Lt-AD project word cloud

Explore the words cloud of the Lt-AD project. It provides you a very rough idea of what is the project "Lt-AD" about.

49    100    effluent    rhi    market    recirculation    assets    rate    strength    125    annually    period    ww    treatment    drinks    ip    risk    volumes    lt    conventional    106    urban    662    relationship    alone    promotional    environmental    sectors    12    first    post    directive    aeration    heat    treats    demonstrator    ahead    nvp    billion    uwwd    energy    no    savings    months    anaerobic    operation    reliant    m3    producing    milk    thermal    industrial    plant    temperature    unsustainable    ambient    payback    aerobic    compact    litres    standard    gas    temperatures    site    footprint    day    materials    negligible    generates    ghg    greenhouse    provides    hugely    374    successfully    wastewater    etv    emissions    yields    resale    sludge    176    commercialisation    fuels    dairy    mg    opex    gain    deg    biogas    food    lowered    annual    ad    produces    20    cod    367    latter    install    conjunction    digestion    data    input    fossil    protection    channel    reuse    solution    business    revenue   

Project "Lt-AD" data sheet

The following table provides information about the project.

Coordinator
NVP ENERGY LIMITED 

Organization address
address: POST BOX 4, BLOCK 4, MARLINSTOWN OFFICE PARK, DUBLIN ROAD
city: MULLINGAR, CO. WESTMEATH
postcode: n.a.
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Ireland [IE]
 Project website http://www.lowtemp-ad.eu
 Total cost 2˙418˙815 €
 EC max contribution 1˙693˙170 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2015
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-06-01   to  2018-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    NVP ENERGY LIMITED IE (MULLINGAR, CO. WESTMEATH) coordinator 1˙014˙223.00
2    HYDRO INTERNATIONAL LIMITED IE (NAVAN) participant 495˙653.00
3    J.K. FABRICATIONS LIMITED UK (NEWRY DOWN) participant 183˙293.00

Map

 Project objective

No need for heat! NVP Energy presents the first to market, high-rate AD technology that successfully treats low strength wastewater (WW) at ambient temperatures (4 - 20°C). The low-temperature anaerobic digestion (Lt-AD) process provides a novel solution to Food and Drinks industrial sectors which produce large volumes of WW. The European milk treatment and processing sector alone generates over 367 billion litres annually which is typically treated using conventional aerobic processes. The latter treatment process is unsustainable. It results in high sludge yields, requires a large footprint on-site and is hugely reliant on fossil fuels for aeration. The Lt-AD technology produces negligible sludge volumes, presents a compact design, requires no heat input or biogas recirculation, and produces effluent of urban wastewater directive (UWWD) standard (< 125 mg/L COD) without post-aeration. Comparing Lt-AD to conventional aerobic treatment of WW from a typical dairy processing plant producing 2,000 m3 WW per day, Lt-AD can provide annual OPEX savings of €1,662,106 p.a over a payback period of 2.49 years that includes RHI revenue of €374,176. The low temperature operation of Lt-AD allows for 100% of the biogas produced being available for reuse or resale. Lt-AD also has a high impact on environmental savings through reduced greenhouse gas (GHG) emissions and lowered thermal energy and fossil fuels requirements. This Phase 2 project will allow NVP Energy install and commission a demonstrator plant and gain 8-12 months operational data. The results obtained, in conjunction with ETV assessment, will build the business case for each targeted market channel ahead of commercialisation. Other key project objectives include: commercialisation partner relationship development; promotional materials development; exploitation planned; assessment and protection of IP assets and project risk management.

 Deliverables

List of deliverables.
Lt-AD operation simulation model Other 2019-05-31 18:17:52
Process maps for relevant standards Other 2019-05-31 18:17:51
Project website Demonstrators, pilots, prototypes 2019-05-31 18:17:47

Take a look to the deliverables list in detail:  detailed list of Lt-AD deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "LT-AD" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "LT-AD" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

PAIR (2015)

Plasma active pollution control system

Read More  

OWANDBO (2016)

Smart secure system to share resources between OWners AND BOrrowers in a peer-to-peer collaborative consumption market

Read More  

MRP (2017)

autonomous Multi-electric Recycling Process line

Read More