Opendata, web and dolomites

TubeICE

Passive Thermal Energy Storage based on PCMs for energy saving in air conditioning

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 TubeICE project word cloud

Explore the words cloud of the TubeICE project. It provides you a very rough idea of what is the project "TubeICE" about.

energy    lower    solutions    solidification    constant    nighttime    73    free    packed    27    conditioning    store    competing    maximization    gradient    consequent    mechanical    installing    building    50mm    consumption    m2    day    deals    location    positive    night    located    demonstrated    integration    discharged    22    benefits    summer    shaped    global    charged    thanks    material    standard    breakthrough    storage    pcm    first    delivers    offices    days    deg    exploits    ptes    educational    thermal    winter    shops    density    technologies    facility    liquefaction    area    ceiling    brackets    40    shell    air    assures    leads    industrialization    charging    easiness    depending    tubes    giving    maintenance    pilot    innovative    compact    discharging    74    temperature    m3    tubular    cooling    inertia    alloy    pipe    intensive    quality    tubeice    12    commercialization    pcmpro    durability    installations    coventry    eutectic   

Project "TubeICE" data sheet

The following table provides information about the project.

Coordinator
PHASE CHANGE MATERIAL PRODUCTS LTD 

Organization address
address: MERE VIEW INDUSTRIAL ESTATE UNIT 32 YAXLEY
city: PETERBOROUGH CAMBS
postcode: PE7 3HS
website: www.pcmproducts.net/

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.pcmproducts.net/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2017
 Duration (year-month-day) from 2017-07-01   to  2017-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    PHASE CHANGE MATERIAL PRODUCTS LTD UK (PETERBOROUGH CAMBS) coordinator 50˙000.00

Map

 Project objective

TubeICE project deals with the design, industrialization and commercialization of an innovative Phase Change Material (PCM) tubular shaped PTES unit, able to store energy within the range 22-27°C. TubeICE unit is composed by a pipe shell where a Positive Temperature Eutectic solutions is packed: in summer, the storage unit exploits the temperature gradient between night and days, being charged during the night (when temperature is lower) thanks to the solidification of the PCM and discharged during the day by the liquefaction of the material, thus allowing a reduction of air conditioning energy consumption; in winter, TubeICE increases the thermal inertia of the building, being charged through material liquefaction when thermal energy is available. The technology developed and proposed by PCMPro delivers breakthrough properties: • thanks to the development of the innovative PCM and to a compact innovative design, the energy density is 73 kWh/m3, much higher than competing technologies; • installing the storage unit on the ceiling area, 12 tubes can be packed per m2 using standard 50mm pipe brackets, giving a storage of 1.74 kWh/m2; • the application of an eutectic alloy leads to a constant charging and discharging temperature, with benefits in terms of conditioning quality and easiness in storage management; • as already demonstrated by the first pilot installations in a number of offices/shops and in an educational facility located at Coventry in U.K., the integration of TubeICE leads to a global energy consumption reduction within the range 10-40% depending on the location and the building properties, thanks to the maximization of free-cooling (and the consequent reduction of energy intensive mechanical cooling) and to the nighttime free storage. • TubeICE is maintenance free and assures a long durability (10 years and more).

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "TUBEICE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "TUBEICE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Horizon (2018)

Cableway based Photovoltaic Retractable Folding Roof for Dual Usage of Spaces

Read More  

Ventura Habitat (2018)

Commercialisation of Ventura Habitat - a novel wind turbine blade maintenance enclosure tomaximize downtime productivity

Read More  

FlyInGS (2017)

Flywheel energy storage for Increased Grid Stability

Read More