Opendata, web and dolomites

FAME SIGNED

Flexible and Mobile Economic Processing Technologies

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 FAME project word cloud

Explore the words cloud of the FAME project. It provides you a very rough idea of what is the project "FAME" about.

industry    ores    fame    mining    deposits    critical    mineral    environments    eu28    raw    ore    materials   

Project "FAME" data sheet

The following table provides information about the project.

Coordinator
WARDELL ARMSTRONG LLP 

Organization address
address: SIR HENRY DOULTON HOUSE, FORGE LANE
city: STOKE ON TRENT
postcode: ST1 5BD
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Total cost 7˙466˙072 €
 EC max contribution 7˙458˙064 € (100%)
 Programme 1. H2020-EU.3.5.3. (Ensuring the sustainable supply of non-energy and non-agricultural raw materials)
 Code Call H2020-SC5-2014-one-stage
 Funding Scheme /RIA
 Starting year 2015
 Duration (year-month-day) from 2015-01-01   to  2018-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    WARDELL ARMSTRONG LLP UK (STOKE ON TRENT) coordinator 1˙054˙500.00
2    UNIVERSITE DE LORRAINE FR (NANCY CEDEX) participant 937˙750.00
3    G.E.O.S.INGENIEURGESELLSCHAFT MBH DE (HALSBRUCKE) participant 767˙750.00
4    NATURAL HISTORY MUSEUM UK (LONDON) participant 609˙500.00
5    THE UNIVERSITY OF EXETER UK (EXETER) participant 585˙437.00
6    GEOKOMPETENZZENTRUM FREIBERG EV DE (Freiberg) participant 582˙556.00
7    LULEA TEKNISKA UNIVERSITET SE (LULEA) participant 493˙625.00
8    Laboratorio Nacional de Energia e Geologia I.P. PT (S.Mamede de infesta) participant 476˙500.00
9    GEOLOGIAN TUTKIMUSKESKUS FI (ESPOO) participant 409˙625.00
10    UNIVERSIDADE DO PORTO PT (PORTO) participant 360˙125.00
11    BUREAU DE RECHERCHES GEOLOGIQUES ET MINIERES FR (ORLEANS) participant 294˙265.00
12    GBM MINERALS ENGINEERING CONSULTANTS LIMITED UK (TWICKENHAM) participant 237˙500.00
13    NICKELHUTTE AUE GMBH DE (AUE) participant 205˙811.00
14    Keliber Oy FI (Kaustinen) participant 149˙125.00
15    EUROCOLT RESOURCES UNIPESSOAL LDA PT (SINTRA) participant 143˙750.00
16    GEOMET SRO CZ (BRNO) participant 93˙500.00
17    SAXORE BERGBAU GMBH DE (FREIBERG) participant 30˙000.00
18    Asociación para la Investigación y Desarrollo Industrial de los Recursos Naturales ES (LEGANES) participant 26˙743.00

Mappa

 Project objective

FAME aims to increase the competiveness of the mining of European mineral resources and to stimulate more private engagement and investment and thus business development with the potential to maintain and create high quality jobs within the EU28. The focus and a principal aim is to enhance mineral processing and mining skills within Europe. A medium to long term aim is to reduce the reliance of European Industry and consumers on raw materials that currently have to be imported from outside EU28. FAME will contribute to the more efficient exploitation of European domestic mineral resources including previously undeveloped resources that have the potential to contribute to the securing of raw material supply by optimising the extraction and processing of ores that include raw materials critical to the economic development of the EU (“critical raw materials”, CRM) and which occur in widespread deposits across the EU. This project specifically addresses primary ore deposits with skarn, pegmatite and greisen ores as they offer the most promising potential for this purpose. This proposal will consider the flexibility (and to an extent the mobility) of the processing concept, in particular, by ensuring the modularity of individual project components.

FAME will consider flexible and modular processing technology demonstrated in relevant operational environments (industrially relevant environments in the case of key enabling technologies (TRL). TRL6 is envisaged feasible for processing of pegmatites, whereas TRL5 is considered more realistic for other types of ore body. The consortium has 17 partners from 8 European countries and includes industry, academia and governmental institutions. The consortium has a strong industrial background and involves strategically important reference deposits operated or/and accessible to the project partners and, additionally, associated partners within the EU28 nations and Greenland.

 Work performed, outcomes and results:  advancements report(s) 

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "FAME" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "FAME" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.3.)

Minland (2017)

Mineral resources in sustainable land-use planning

Read More  

RemovAL (2018)

Removing the waste streams from the primary Aluminium production and other metal sectors in Europe

Read More  

NEMO (2018)

Near-zero-waste recycling of low-grade sulphidic mining waste for critical-metal, mineral and construction raw-material production in a circular economy

Read More