Opendata, web and dolomites

Wavepiston SIGNED

Low price wave energy conversion through force cancellation.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Wavepiston project word cloud

Explore the words cloud of the Wavepiston project. It provides you a very rough idea of what is the project "Wavepiston" about.

force    company    pumping    respectively    mounted    no    wave    price    waves    producing    tests    break    modules    investors    ireland    tank    respect    proved    emissions    90    conversion       water    conceived    reducing    identical    power    meet    technologies    size    nurmi    attempt    accounting    amount    economically    proof    suitable    shore    performed    consists    efficiency    forces    cancellation    requiring    2013    ensures    industrialization    stopped    2009    models    renewable    patented    chain    specialised    pilot    reduce    esco    structure    sceptical    string    cylinders    predicted    worked    simpler    energy    business    enermed    coastal    pressurized    islands    validated    near    remote    competitive    experimentally    plan    harvest    efficient    expenditure    fit    anchors    supply    hydraulic    watt    grid    connection    vryhof    usable    clean    panel    contained    complete    joined    wavepiston    2006    mooring    successive    ed    isolated    pumps    capital    demand    communities    2010    offshore   

Project "Wavepiston" data sheet

The following table provides information about the project.

Coordinator
WAVEPISTON AS 

Organization address
address: KRONBORG 10A, 3000 Helsingør
city: HELSINGER
postcode: 3000
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Denmark [DK]
 Project website http://www.wavepiston.dk/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-02-01   to  2015-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    WAVEPISTON AS DK (HELSINGER) coordinator 50˙000.00
2    ENERGIA MEDITERRANEA SRL IT (CAGLIARI) participant 0.00
3    NURMI CYLINDERS OY FI (IKKALA) participant 0.00
4    VRYHOF ANCHORS BV NL (SCHIEDAM) participant 0.00

Map

 Project objective

No attempt to harvest energy from waves has resulted in an economically viable and competitive technology. Many projects stopped and investors have become sceptical of wave power. Currently the cost per watt of usable wave energy is high, due to a focus on energy conversion methods and efficiency, rather than on mooring and grid connection, accounting for more than 90% expenditure. Wavepiston is a break through near-shore wave power technology producing energy from waves at a competitive price with respect to the most efficient renewable energy technologies. The system consists of identical modules mounted on a string pumping pressurized water to shore for successive energy conversion. Using Wavepiston’s patented “force cancellation” principle the system is able to reduce the amount of forces on the mooring and structure to 1:10, requiring a simpler structure and therefore reducing capital costs. The Wavepiston system can provide cost efficient, clean and reliable renewable energy to help meet Europe’s increasing demand and achieve emissions reduction targets. The offshore application ensures it is a suitable fit also for remote islands and isolated coastal communities. The Wavepiston system was conceived in 2006 and in 2009 the concept of force cancellation was patented. In 2010 numerous tank tests were performed with a system 1:30 the size, that experimentally validated the system and proved each panel can harvest more than 5% of the energy contained in a wave. In 2013 a proof of concept was carried out offshore with a system 1:9 the size and it worked better than predicted. Vryhof Anchors and Nurmi Cylinders, specialised in offshore mooring and hydraulic pumps respectively, have joined the project to support product industrialization. Phase 1 will assess various business models (with the support of the ESCO company EnerMed partner in the project), establish a complete supply chain and plan all activities for the large scale pilot to be held in Ireland.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "WAVEPISTON" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "WAVEPISTON" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

HELITE (2016)

High precision and performance heliostat for variable geometry fields of Thermosolar Plants

Read More  

iDriver (2015)

iDriver

Read More  

CargoMill (2015)

The CARGOMIL, an innovative self propelled all terrain vehicle for mobilising “where and when the biomass is”.

Read More