Opendata, web and dolomites

Wavepiston SIGNED

Low price wave energy conversion through force cancellation.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Wavepiston project word cloud

Explore the words cloud of the Wavepiston project. It provides you a very rough idea of what is the project "Wavepiston" about.

respect    consists    islands    string    waves    break    economically    grid    cancellation    nurmi    structure    identical    vryhof    predicted    panel    mounted    shore    industrialization    technologies    producing    offshore    ireland    business    usable    water    ed    hydraulic    accounting    clean    90    attempt    contained    sceptical    coastal    company    2013    investors    renewable    conversion    size    force    2006       near    patented    harvest    2009    performed    mooring    conceived    energy    joined    specialised    reducing    modules    proved    reduce    plan    pumping    cylinders    efficiency    efficient    watt    no    wavepiston    wave    pressurized    remote    amount    meet    capital    communities    pilot    price    connection    chain    worked    successive    emissions    pumps    complete    2010    isolated    power    respectively    fit    experimentally    forces    competitive    models    enermed    tests    demand    supply    esco    tank    simpler    expenditure    anchors    suitable    stopped    ensures    proof    validated    requiring   

Project "Wavepiston" data sheet

The following table provides information about the project.

Coordinator
WAVEPISTON AS 

Organization address
address: KRONBORG 10A, 3000 Helsingør
city: HELSINGER
postcode: 3000
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Denmark [DK]
 Project website http://www.wavepiston.dk/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-02-01   to  2015-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    WAVEPISTON AS DK (HELSINGER) coordinator 50˙000.00
2    ENERGIA MEDITERRANEA SRL IT (CAGLIARI) participant 0.00
3    NURMI CYLINDERS OY FI (IKKALA) participant 0.00
4    VRYHOF ANCHORS BV NL (SCHIEDAM) participant 0.00

Map

 Project objective

No attempt to harvest energy from waves has resulted in an economically viable and competitive technology. Many projects stopped and investors have become sceptical of wave power. Currently the cost per watt of usable wave energy is high, due to a focus on energy conversion methods and efficiency, rather than on mooring and grid connection, accounting for more than 90% expenditure. Wavepiston is a break through near-shore wave power technology producing energy from waves at a competitive price with respect to the most efficient renewable energy technologies. The system consists of identical modules mounted on a string pumping pressurized water to shore for successive energy conversion. Using Wavepiston’s patented “force cancellation” principle the system is able to reduce the amount of forces on the mooring and structure to 1:10, requiring a simpler structure and therefore reducing capital costs. The Wavepiston system can provide cost efficient, clean and reliable renewable energy to help meet Europe’s increasing demand and achieve emissions reduction targets. The offshore application ensures it is a suitable fit also for remote islands and isolated coastal communities. The Wavepiston system was conceived in 2006 and in 2009 the concept of force cancellation was patented. In 2010 numerous tank tests were performed with a system 1:30 the size, that experimentally validated the system and proved each panel can harvest more than 5% of the energy contained in a wave. In 2013 a proof of concept was carried out offshore with a system 1:9 the size and it worked better than predicted. Vryhof Anchors and Nurmi Cylinders, specialised in offshore mooring and hydraulic pumps respectively, have joined the project to support product industrialization. Phase 1 will assess various business models (with the support of the ESCO company EnerMed partner in the project), establish a complete supply chain and plan all activities for the large scale pilot to be held in Ireland.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "WAVEPISTON" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "WAVEPISTON" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

PVFINAL (2015)

Photo Voltaic Fully Integrated and Automated Line

Read More  

HELITE (2016)

High precision and performance heliostat for variable geometry fields of Thermosolar Plants

Read More  

PearlLight+ (2015)

Increasing the efficiency of LED street lighting by 15% via optical design

Read More