Opendata, web and dolomites

CEWET

Cost Effective Wireless Electrical Transportation

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 CEWET project word cloud

Explore the words cloud of the CEWET project. It provides you a very rough idea of what is the project "CEWET" about.

road    transit    municipalities    industry    once    co2    infrastructure    80    regulators    pressure    segment    policy    approached    put    vehicles    zero    attractive    validation    transmission    transport    regulatory    dollar    stakeholders    charging    billion    drive    reduce    source    mitigation    clean    market    perform    enthusiasm    trolleys    structural    efficiency    cheaper    pollution    trl    battery    buy    competitors    cewet    trams    universal    train    removing    wirelessly    money    lighter    economical    commercialization    power    public    types    government    solutions    preparation    electroad    maintenance    utilities    motion    emissions    first    full    risk    transmitting    demonstration    wireless    vehicle    transportation    plans    participate    breakthrough    noise    fuelling    pilot    energy    alternatives    powered    approximately    operators    solution    expressed    costly    200    eliminates    willingness    buses    electric    electrical    feasibility    companies    plan    pilots    business    prepare    readiness   

Project "CEWET" data sheet

The following table provides information about the project.

Coordinator
ELECTRIC ROAD LTD 

Organization address
address: AMAL 10 ST PARK AFEK
city: ROSH HAYIN
postcode: 4809900
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Israel [IL]
 Project website http://electroad.me/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2015
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-10-01   to  2016-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ELECTRIC ROAD LTD IL (ROSH HAYIN) coordinator 50˙000.00

Map

 Project objective

The multi-billion dollar public transit buses and train industry is under increasing regulatory and public policy pressure to adopt clean transportation solutions, that reduce CO2 emissions and noise pollution. ElectRoad has developed the technology that makes possible the first electrical vehicle that is directly powered by wireless energy with no need for a battery or costly infrastructure. This unique technology eliminates the need for fuelling or charging a battery to put an electrical vehicle in motion by removing the energy source from the vehicle and transmitting the power wirelessly directly from the road during the drive. The solution is generic and universal, can be used by all types of electric vehicles without any structural changes to the electrical vehicle. This technology is now at TRL level 6. ElectRoad has already achieved high energy transmission efficiency (above 80%), high value for money and zero emissions. ElectRoad electric buses are lighter (no battery), require less maintenance, and are more economical than electric buses of the competitors. The infrastructure is much cheaper than other electric transport alternatives such as trolleys or trams, making them attractive to public transport regulators, operators, and to the general public.

CEWET will: – Perform a feasibility study in preparation for a full demonstration and pilot (planned for Phase II), including Business and commercialization Plans. – Prepare for the validation of the system on a road segment of approximately 200 m. - Perform a comprehensive Market Research and Risk Mitigation Plan – Prepare a Phase II proposal.

Several stakeholders have been approached (Public Transport Operators, Municipalities, Government Authorities, Utilities companies, etc) and expressed enthusiasm about the breakthrough technology, as well as their readiness to participate in pilots and willingness to buy the product once in production.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CEWET" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CEWET" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

GT WHR system (2015)

Green Turbine WHR System

Read More  

eco-railjacket (2015)

Total Full Ecologic Embedded Railways Jacket System

Read More