Opendata, web and dolomites

CEWET

Cost Effective Wireless Electrical Transportation

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 CEWET project word cloud

Explore the words cloud of the CEWET project. It provides you a very rough idea of what is the project "CEWET" about.

source    trams    solution    co2    first    trolleys    regulatory    pilot    feasibility    expressed    money    power    public    200    transmitting    transport    validation    trl    billion    operators    buses    drive    readiness    once    electroad    cewet    road    regulators    electric    vehicles    pilots    business    utilities    infrastructure    lighter    removing    economical    approximately    enthusiasm    battery    clean    policy    solutions    mitigation    segment    participate    preparation    transportation    attractive    industry    wireless    efficiency    wirelessly    fuelling    risk    transmission    structural    breakthrough    buy    put    companies    motion    vehicle    powered    emissions    alternatives    eliminates    government    demonstration    perform    types    willingness    electrical    competitors    plan    approached    cheaper    stakeholders    energy    pollution    charging    reduce    transit    plans    maintenance    dollar    municipalities    costly    noise    prepare    80    zero    market    pressure    train    commercialization    full    universal   

Project "CEWET" data sheet

The following table provides information about the project.

Coordinator
ELECTRIC ROAD LTD 

Organization address
address: AMAL 10 ST PARK AFEK
city: ROSH HAYIN
postcode: 4809900
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Israel [IL]
 Project website http://electroad.me/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2015
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-10-01   to  2016-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ELECTRIC ROAD LTD IL (ROSH HAYIN) coordinator 50˙000.00

Map

 Project objective

The multi-billion dollar public transit buses and train industry is under increasing regulatory and public policy pressure to adopt clean transportation solutions, that reduce CO2 emissions and noise pollution. ElectRoad has developed the technology that makes possible the first electrical vehicle that is directly powered by wireless energy with no need for a battery or costly infrastructure. This unique technology eliminates the need for fuelling or charging a battery to put an electrical vehicle in motion by removing the energy source from the vehicle and transmitting the power wirelessly directly from the road during the drive. The solution is generic and universal, can be used by all types of electric vehicles without any structural changes to the electrical vehicle. This technology is now at TRL level 6. ElectRoad has already achieved high energy transmission efficiency (above 80%), high value for money and zero emissions. ElectRoad electric buses are lighter (no battery), require less maintenance, and are more economical than electric buses of the competitors. The infrastructure is much cheaper than other electric transport alternatives such as trolleys or trams, making them attractive to public transport regulators, operators, and to the general public.

CEWET will: – Perform a feasibility study in preparation for a full demonstration and pilot (planned for Phase II), including Business and commercialization Plans. – Prepare for the validation of the system on a road segment of approximately 200 m. - Perform a comprehensive Market Research and Risk Mitigation Plan – Prepare a Phase II proposal.

Several stakeholders have been approached (Public Transport Operators, Municipalities, Government Authorities, Utilities companies, etc) and expressed enthusiasm about the breakthrough technology, as well as their readiness to participate in pilots and willingness to buy the product once in production.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CEWET" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CEWET" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

GT WHR system (2015)

Green Turbine WHR System

Read More  

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More  

LIFE-BATTERY (2015)

Long lifespan battery for hybrid vehicles

Read More