Opendata, web and dolomites

CEWET

Cost Effective Wireless Electrical Transportation

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 CEWET project word cloud

Explore the words cloud of the CEWET project. It provides you a very rough idea of what is the project "CEWET" about.

business    types    stakeholders    validation    policy    eliminates    efficiency    transit    vehicle    willingness    billion    utilities    preparation    transport    lighter    cewet    transmitting    electroad    energy    segment    solutions    charging    prepare    plans    cheaper    public    solution    universal    motion    mitigation    perform    power    pollution    risk    transportation    municipalities    infrastructure    attractive    readiness    maintenance    full    approximately    electric    wirelessly    source    regulatory    clean    operators    trl    plan    alternatives    costly    buses    breakthrough    first    trolleys    market    commercialization    200    structural    emissions    pressure    economical    competitors    vehicles    pilot    noise    electrical    demonstration    participate    drive    expressed    wireless    transmission    feasibility    once    co2    enthusiasm    zero    pilots    buy    government    fuelling    battery    train    powered    removing    put    money    industry    trams    companies    approached    regulators    road    80    reduce    dollar   

Project "CEWET" data sheet

The following table provides information about the project.

Coordinator
ELECTRIC ROAD LTD 

Organization address
address: AMAL 10 ST PARK AFEK
city: ROSH HAYIN
postcode: 4809900
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Israel [IL]
 Project website http://electroad.me/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2015
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-10-01   to  2016-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ELECTRIC ROAD LTD IL (ROSH HAYIN) coordinator 50˙000.00

Map

 Project objective

The multi-billion dollar public transit buses and train industry is under increasing regulatory and public policy pressure to adopt clean transportation solutions, that reduce CO2 emissions and noise pollution. ElectRoad has developed the technology that makes possible the first electrical vehicle that is directly powered by wireless energy with no need for a battery or costly infrastructure. This unique technology eliminates the need for fuelling or charging a battery to put an electrical vehicle in motion by removing the energy source from the vehicle and transmitting the power wirelessly directly from the road during the drive. The solution is generic and universal, can be used by all types of electric vehicles without any structural changes to the electrical vehicle. This technology is now at TRL level 6. ElectRoad has already achieved high energy transmission efficiency (above 80%), high value for money and zero emissions. ElectRoad electric buses are lighter (no battery), require less maintenance, and are more economical than electric buses of the competitors. The infrastructure is much cheaper than other electric transport alternatives such as trolleys or trams, making them attractive to public transport regulators, operators, and to the general public.

CEWET will: – Perform a feasibility study in preparation for a full demonstration and pilot (planned for Phase II), including Business and commercialization Plans. – Prepare for the validation of the system on a road segment of approximately 200 m. - Perform a comprehensive Market Research and Risk Mitigation Plan – Prepare a Phase II proposal.

Several stakeholders have been approached (Public Transport Operators, Municipalities, Government Authorities, Utilities companies, etc) and expressed enthusiasm about the breakthrough technology, as well as their readiness to participate in pilots and willingness to buy the product once in production.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CEWET" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CEWET" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More  

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

MODULAR INNODRIVE (2015)

MODULAR INNODRIVE Powered Reel Drive in maritime environment

Read More