Opendata, web and dolomites

BIMplement SIGNED

Towards a learning building sector by setting up a large-scale and flexible qualification methodology integrating technical, cross-craft and BIM related skills and competences

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "BIMplement" data sheet

The following table provides information about the project.

Coordinator
ALLIANCE NAT VILLES INNOVATION EMPLOI ASSOCIATION 

Organization address
address: RUE DU QUATRE SEPTEMBRE 28
city: PARIS
postcode: 75002
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country France [FR]
 Project website http://www.bimplement-project.eu
 Total cost 999˙620 €
 EC max contribution 999˙620 € (100%)
 Programme 1. H2020-EU.3.3.7. (Market uptake of energy innovation - building on Intelligent Energy Europe)
2. H2020-EU.3.3.1. (Reducing energy consumption and carbon foorpint by smart and sustainable use)
 Code Call H2020-EE-2016-CSA
 Funding Scheme CSA
 Starting year 2017
 Duration (year-month-day) from 2017-09-01   to  2020-02-29

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ALLIANCE NAT VILLES INNOVATION EMPLOI ASSOCIATION FR (PARIS) coordinator 202˙070.00
2    STICHTING ISSO NL (ROTTERDAM) participant 166˙730.00
3    Huygen Installatie Adviseurs NL (Maastricht) participant 148˙750.00
4    ASTUS-CONSTRUCTION FR (VILLEFONTAINE) participant 121˙875.00
5    INSTITUTO VALENCIANO DE LA EDIFICACION ES (VALENCIA) participant 118˙145.00
6    REGIONINIS INOVACIJU VADYBOS CENTRAS LT (VILNIUS) participant 84˙600.00
7    CONSEIL DES ARCHITECTES D'EUROPE BE (BRUXELLES) participant 56˙000.00
8    MOSTOSTAL WARSZAWA SA PL (WARSZAWA) participant 42˙875.00
9    SERVICIO VALENCIANO DE EMPLEO Y FORMACION ES (VALENCIA) participant 33˙375.00
10    LIETUVOS STATYBININKU ASOCIACIJA LT (VILNIUS) participant 25˙200.00
11    STICHTING OPLEIDINGS- EN ONTWIKKELINGSFONDS VOOR HET TECHNISCH INSTALLATIEBEDRIJF*ST.POL.- EN ONTWIKK.FONDS TECH INSTALL.BEDR OTIB NL (WOERDEN) participant 0.00

Map

 Project objective

NZEB construction needs an enhanced systematic approach for the quality control of the entire process to reduce the gap between designed and actual performances of buildings. This requires a fully qualified and equipped workforce, capable to implement, execute and perform all the necessary labor actions with understanding of the responsibility of their own profession and actions, as well as the relation with the other involved professions and actions. BIMplement offers the trainers and the learners a range of tools that fit the objective of developing a fully qualified and equipped workforce, capable to implement, execute and perform all the necessary labour actions. Main aim is to achieve an improved quality for NZEB construction and renovation by setting up a large scale, training, CPD and qualification schemes, addressing the entire process phases in a cross-crafts and cross level multidisciplinary approach, strengthened with hands-on and BIM-enhanced workplace learning tools by following objectives: 1. To improve the overall quality of renovations and new constructions, based on a BIM-enabled workplace learning, addressing the entire process phases in a cross-crafts multidisciplinary approach 2. To create a new generation of professionals and craftsmen, equipped and enabled by BIM skills, to enhance the overall quality of construction and renovation across the entire process 3. To foster interactions between different trades and professions enabled by a flexible qualification, certification and accreditation methodology for implementing BIM as a workplace learning environment 4. To sustain the qualification and training schemes a replication and exploitation strategy will be developed and validated At the end of the 2 years project BIMplement has developed a transferable method based on the experience of previous BUS and H2020 Construction Skills projects and on experimentations in territories with craftsmen and small enterprises.

 Deliverables

List of deliverables.
Elaborated quality control and qualification matrix for ventilation and air tightness Documents, reports 2020-04-02 09:03:00
Methodology guide and tools for awareness campaign Documents, reports 2020-04-02 09:02:10
Selected tool and learning methods, implemented in the five national frameworks Documents, reports 2020-04-02 09:03:09
List of criteria and of the selected territories Documents, reports 2020-04-02 09:02:02
Replication and exploitation plan Documents, reports 2020-04-02 09:02:19
Adjusted methodology for a BIM-enhanced Qualification Framework including an instruction guide Documents, reports 2020-04-02 09:02:51
Five national results of usability testing Documents, reports 2020-04-02 09:02:39
Methodology for a BIM-enhanced Qualification Framework Documents, reports 2020-04-02 09:02:29
Overview of possibilities to connect the tools and learning methods to the BIM models & process Documents, reports 2020-04-02 09:01:52

Take a look to the deliverables list in detail:  detailed list of BIMplement deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 AnaTisov, Peter Op \'t Veld, Jan Cromwijk, Henri Le Morois
Introduction to the H2020 BIMplement project -Towards a learning building sector for enhanced quality control by setting up a qualification methodology integrating technical, cross-trade and BIM related skills and competences
published pages: 7-11, ISSN: 1307-3729, DOI:
The REHVA European HVAC Journal Volume 55, issue 5 October 2018 2020-03-04

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "BIMPLEMENT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "BIMPLEMENT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.7.;H2020-EU.3.3.1.)

SocialWatt (2019)

Connecting Obligated Parties to Adopt Innovative Schemes towards Energy Poverty Alleviation

Read More  

EEW4 (2019)

Energy Efficiency Watch 4

Read More  

F-PI (2019)

Financing Energy Efficiency using Private Investments

Read More