Opendata, web and dolomites

GEODEPOWER

Cutting-edge deep geothermal system and drilling technology suitable for all users and locations

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 GEODEPOWER project word cloud

Explore the words cloud of the GEODEPOWER project. It provides you a very rough idea of what is the project "GEODEPOWER" about.

million       outside    irr    rate    geothermal    fracking    800m    environment    market    ipp    geodepower    heating    team    nov    space    generation    zero    17    projected    constructed    groundwater    ratio    wells    cooling    almost    office    2007    licensees    founded    150    000m    airport    pumps    plants    developer    geological    managed    domestic    emissions    delivering    trl6    noise    joint    deployment    lack    2x1500m    occupying    serve    round    small    buildings    model    countries    2023    initially    return    parking    jobs    location    rock    demanding    temperature    beginning    lots    residential    sports    chp    roll    hours    densely    combined    soil    2017    2016    completion    enhanced    deliveries    area    electricity    installation    23    implies    arenas    gradients    fit    patented    norwegian    business    owner    profit    first    trl7    runways    energy    sidewalks    deep    contamination    drilling    plant    geoscience    closed    supplier    oslo    gwh    internal    industrial    asker    power    heat    ideal    venturing    sme    loop    populated    operation    rig    plan    nordic   

Project "GEODEPOWER" data sheet

The following table provides information about the project.

Coordinator
ROCK ENERGY AS 

Organization address
address: LILLEAKERVEIEN 8
city: OSLO
postcode: 283
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Project website http://www.rockenergy.no/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-01-01   to  2018-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ROCK ENERGY AS NO (OSLO) coordinator 50˙000.00

Map

 Project objective

Rock Energy AS is a Norwegian SME founded in 2007 and managed by a highly experienced team within geoscience, rig, drilling, and energy systems. We have developed GEODEPower geothermal plants based on deep-drilling and enhanced geothermal well-system patented technology capable of delivering energy even in very low geothermal gradients, thus allowing exploitation at any location no matter geological activity. GEODEPower wells reach as deep as to 5,000 m, and through a closed loop system achieve high-energy delivery all year round occupying almost no space. Our technology can fit energy deliveries from 0.3 to 150 GWh/year/well with high utilization ratio in terms of operational hours. Thus, we can serve since low-temperature demanding end users such as residential and office buildings, sports arenas, parking lots, and sidewalks to airport runways, and large industrial users through heat pumps and combined heat and power (CHP) plants. GEODEPower closed-loop operation implies no fracking, no contamination of groundwater/soil, and zero emissions. These features together with the lack of operation noise, and the small area for installation, make them the ideal electricity, heating and cooling supplier in densely populated areas. The first GEODEPower plant to demonstrate the technology in a relevant environment constructed in Asker 2016 (down to 800m) is now in testing phase (TRL6). A plant with 2x1500m wells is planned for Oslo Airport, drilling phase beginning in Nov 2017. After project completion at the airport will be at TRL7. We have projected the roll out of our business plan initially through the Nordic countries, our domestic market, through an IPP developer model enabling to the end user to be plant’s owner. Outside the Nordic market, we are focused on the deployment of 5,000m wells by licensees and joint venturing. We expect €23,3 million profit by 2023, with an Internal Return Rate (IRR) of 17.8% for Rock Energy, and the generation of 70 new jobs.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "GEODEPOWER" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "GEODEPOWER" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Horizon (2018)

Cableway based Photovoltaic Retractable Folding Roof for Dual Usage of Spaces

Read More  

RenGen (2017)

Onsite, On-demand, Self-standing Cost Competitive Zero-Carbon Power Generation

Read More  

WTSS (2017)

Wind Turbine Support Structure

Read More