Opendata, web and dolomites

LowCostTracking

Low cost tracking and data management solution for biopharma cold chain logistics

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 LowCostTracking project word cloud

Explore the words cloud of the LowCostTracking project. It provides you a very rough idea of what is the project "LowCostTracking" about.

expansion    50    safe    strictly    outcome    global    ready    manufacturers    damages    landscape    sharing    economic    oems    supply    efficient    regulations    ultimately    feasibility    temperature    understand    models    counterfeiting    succesful    environment    revolutionizing    asset    market    endanger    sabotage    solution    partnered    fast    influx    clinic    roi    company    brand    drugs    patent    analytics    stems    final    position    container    trials    pharma    pricing    fto    portfolio    provider    hardware    logistics    danish    exists    25    commercial    patient    reefer    refrigerated    tracker    segment    international    deviations    transmission    biologics    competitive    monitor    benefits    data    half    reduce    meet    secure    shipments    entry    functional    tested    companies    layered    globe    apparent    building    gt    stakeholders    profitability    chain    globally    safety    protect    visibility    regulatory    customer    phase1    tracking    segments    demand    compliance    blockbuster    security    counterfeit    niche    integrity   

Project "LowCostTracking" data sheet

The following table provides information about the project.

Coordinator
GLOBE TRACKER INTERNATIONAL APS 

Organization address
address: STRANDGADE 91 4 FLOOR
city: KOBENHAVN K
postcode: 1401
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Denmark [DK]
 Project website http://www.globetracker.com
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2016
 Duration (year-month-day) from 2016-09-01   to  2016-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    GLOBE TRACKER INTERNATIONAL APS DK (KOBENHAVN K) coordinator 50˙000.00

Map

 Project objective

The Danish company Globe Tracker International (GT) is revolutionizing supply chain visibility and profitability as a leading provider of data sharing, data analytics and global asset tracking. GT has developed a fully functional hardware/data management system that is ready to be deployed globally and is currently being tested in commercial trials in the reefer market. GT has partnered with global OEMs, container manufacturers and data transmission companies to help commercial expansion. For this project, GT has identified the the pharma product delivery market as a high value segment in which demand exists but where its solution needs adaptation to meet customer and regulatory requirements. The demand stems from the need for safe, secure and efficient distribution of pharma products in a strictly controlled and refrigerated environment in order to protect the integrity of the drugs. Today temperature deviations endanger patient safety and increase costs. In addition, sabotage and counterfeiting damages safety and brand values. This need is especially apparent in the fast growing biologics market that already represents a third of blockbuster pharma shipments and over half of clinic trials. The feasibility study will (1) identify the most promising pharma market niche for entry that will ultimately open up growth into all other temperature/security/counterfeit relevant segments and (2) define the technical design for its final products to deliver the largest possible economic benefits to the supply chain. The feasibility study will help to understand how the multi-layered stakeholders need to be involved. GT will evaluate the competitive landscape, analyse pricing and ROI models and monitor its FTO position, while it is building a patent portfolio throughout Phase1 and Phase 2. The succesful outcome of the Phase II project will reduce product loss by 25%, reduce the influx of counterfeit by 50% and ensure compliance with recent EU and US logistics regulations.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "LOWCOSTTRACKING" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "LOWCOSTTRACKING" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

K.A.R.S. (2017)

ANTIROTATION SYSTEM FOR HELIRESCUE

Read More  

GMP (2017)

Green Marine Propulsion

Read More  

OUITAXI (2017)

OUITAXI (or WETAXI) a taxi on demand and taxi sharing service

Read More