Opendata, web and dolomites

Greenrail SIGNED

Greenrail, innovative and sustainable railway sleepers: the greener solution for railway sector

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Greenrail project word cloud

Explore the words cloud of the Greenrail project. It provides you a very rough idea of what is the project "Greenrail" about.

ferroviaria    integrate    122    kilometer    lifespan    patented    photovoltaic    designed    composite    telecommunications    solar    power    railway    installation    substitute    1670    dynamometers    regulations    safety    transmission    basic    data    outer    made    seal    noise    train    linkbox    plastic    sensors    rete    countries    producing    35    advantages    covered    150    activate    company    greenrail    stressed    core    piezo    themselves    life    manufacturing    shell    tons    rfi    railroad    sleeper    600    sme    elt    longer    inner    excellence    homologation    reduces    waste    obtain    winner    urban    goals    km    2018    remote    transform    recover    transition    recycled    investments    sleepers    italiana    innovative    communicate    tyres    certification    sustainable    first    diagnostics    combines    besides    incorporates    rooms    line    pilot    plant    maintenance    elastic    energy    piezoelectric    ones    commercialisation    vibrations   

Project "Greenrail" data sheet

The following table provides information about the project.

Coordinator
GREENRAIL SRL 

Organization address
address: VIA BELSIANA 71
city: ROMA
postcode: 187
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.greenrailgroup.com/en/home/
 Total cost 3˙272˙623 €
 EC max contribution 2˙290˙836 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-10-01   to  2018-09-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    GREENRAIL SRL IT (ROMA) coordinator 2˙290˙836.00

Map

 Project objective

Greenrail S.r.l., winner of SME Phase I and Seal of Excellence SME Phase II has designed an innovative composite railway sleeper. Greenrail Sleeper, patented in 122 countries, combines the advantages of concrete sleepers with the ones of composite sleepers. It is made of an inner core in concrete, covered by an elastic outer shell obtained from recycled plastic and ELT (End-of-Life Tyres), which reduces maintenance costs, vibrations and noise and allows to recover 35 tons of ELT and 35 tons of plastic from urban waste for each kilometer of line (1 km = 1670 sleepers). It is the sustainable substitute of pre-stressed concrete sleepers and it has a longer lifespan, estimated in 50 years from the first installation. Moreover, it is the only existing sleeper that can integrate sensors and systems for energy production and/or data transmission for safety and/or telecommunications. Besides the Greenrail Basic sleeper the company has planned further R&D for Greenrail Solar (a sleeper able to transform every km of line into a photovoltaic field producing from 150 kWh to 600 kWh), Greenrail LinkBox (a Greenrail Solar which also incorporates systems of data transmission for safety and telecommunications able to communicate with remote control rooms) and Greenrail Piezo (Greenrail Basic sleeper which incorporates piezoelectric systems and dynamometers that activate themselves at every train transition, producing energy able to power integrated systems for analysis and diagnostics of the railroad line). The goals of the project are: - obtain the homologation of Greenrail Basic sleeper through the pilot activity with RFI (Rete Ferroviaria Italiana), following the certification regulations; - R&D investments on Greenrail Solar, LinkBox and Piezo by 2018; - commercialisation and manufacturing plant.

 Deliverables

List of deliverables.
Results of demonstration activities- Field test of Greenrail Basic Documents, reports 2019-04-18 13:50:42
Dissemination Report and Organization of Greenrail Day Websites, patent fillings, videos etc. 2019-05-30 15:33:15
Creation of media kits Websites, patent fillings, videos etc. 2019-05-30 15:33:12
Report on the communication activities (web and not web) Websites, patent fillings, videos etc. 2019-05-30 15:33:14
Report of the Launch Meeting Documents, reports 2019-05-30 15:33:15
Copies of communication materials Websites, patent fillings, videos etc. 2019-05-30 15:33:10
Creation of official calendar and report of events/fairs Websites, patent fillings, videos etc. 2019-05-30 15:33:13

Take a look to the deliverables list in detail:  detailed list of Greenrail deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "GREENRAIL" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "GREENRAIL" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

LEDVAR-Z (2018)

A New Paradigm for Efficient and Modern Rail Signalling

Read More  

Zbox (2018)

ZBOX: THE NEXT GENERATION OF FOLDABLE CONTAINERS

Read More  

SPEED-EU (2018)

Damping device to solve the pantograph-line capture problems, especially for the EU high-speed railways lines

Read More