Opendata, web and dolomites

CYCLOMB SIGNED

Disruptive Cyclone-based technology for effective and affordable particulate matter emission reduction in biomass combustion systems

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 CYCLOMB project word cloud

Explore the words cloud of the CYCLOMB project. It provides you a very rough idea of what is the project "CYCLOMB" about.

mg    cumulative    solution    direct    price    filters    buildings    recycling    operation    market    team    achieves    levels    investing    capital    solutions    performance    cyclone    abide    99    combustion    total    combining    device    maintenance    26    abatement    launch    95    greenhouses    2030    5mw    particulate    ideal    fix    150    uk    exist    affordable    tertiary    reduces    80    comply    gases    additional    germany    generate    electrostatic    96    precipitators    legislation    countries    final    annual    54m    district    recirculation    200kw    attached    denmark    pm    automatic    hospitals    cyclomb    biomass    gas    66    boiler    least    2023    lower    always    follow    97    limits    medium    power       emissions    m3    until    efficiency    provides    geometry    primary    upgrade    optimized    office    farms    hotels    plants    reduce    profit    capacity    complementary    schools    emission    urgently    respect    heating    regulations    small    jobs    ge    boilers    flue    bag   

Project "CYCLOMB" data sheet

The following table provides information about the project.

Coordinator
KSM STOKER AS 

Organization address
address: NAESSUNDVEJ 440
city: KARBY
postcode: 7960
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Denmark [DK]
 Project website http://www.cyclomb.eu
 Total cost 1˙640˙773 €
 EC max contribution 1˙241˙826 € (76%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2. (PRIORITY 'Industrial leadership')
 Code Call H2020-FTIPilot-2016-1
 Funding Scheme IA
 Starting year 2017
 Duration (year-month-day) from 2017-04-01   to  2020-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    KSM STOKER AS DK (KARBY) coordinator 652˙019.00
2    UNIVERSIDAD DE VIGO ES (VIGO PONTEVEDRA) participant 310˙948.00
3    T.A.M.A. AERNOVA SRL IT (PREDAIA) participant 256˙812.00
4    SOLARBOX SOLAR SOLUTIONS SL ES (ARNEDO LA RIOJA) participant 22˙045.00

Map

 Project objective

A strong complementary team with more than 70 years' experience has come together to upgrade, scale-up and market launch an urgently needed affordable integrated solution for emission reduction for biomass combustion plants (CYCLOMB), which will generate 26.54M€ of cumulative profit and 97 new direct jobs by 2023. All EU countries will have to abide by new regulations (already implemented in Germany, Denmark and UK, other EU member states have to follow until 2030) which fix particulate matter (PM) emission limits under 20 mg/m3. Today no cost effective solutions exist that comply with the legislation. The CYCLOMB system achieves a 96-99% PM emission reduction, combining flue gas recycling and cyclone variable geometry. Recirculation of flue gases provides the biomass boiler with a high combustion efficiency (up to 95%) and reduces boiler emissions from 150 mg/m3 of typical automatic boilers to 80 mg/m3. By using a variable-geometry design of the attached PM abatement device a ≥96-99% particulate matter reduction is achieved. Final emission levels are always lower than 20 mg/m3 while investing only an additional 26% in PM abatement technology with respect to boiler price. It thus provides a comparative performance to the most advanced electrostatic precipitators and bag filters but at a 66% lower cost. The total annual operation and maintenance cost of biomass power plants is typically 5%-6.5% of the capital cost of small and medium capacity power plants. The implementation of CYCLOMB can reduce these maintenance costs at least 80% The PM abatement cyclone-technology solution will be optimized for the CYCLOMB integrated solution medium-scale range (200kW-5MW) ideal for medium scale district heating plants and applications in the primary sector (farms, greenhouses) and the tertiary sector (office buildings, schools, hospitals and hotels).

 Deliverables

List of deliverables.
Mid-term dissemination and communication report Documents, reports 2020-02-19 11:29:57

Take a look to the deliverables list in detail:  detailed list of CYCLOMB deliverables.

 Publications

year authors and title journal last update
List of publications.
2017 Araceli Regueiro, Lucie Jezerská, David Patiño, Raquel Pérez-Orozco, Jan Nečas, Martin Žídek
Experimental Study of the Viability of Low-Grade Biofuels in Small-Scale Appliances
published pages: 1823, ISSN: 2071-1050, DOI: 10.3390/su9101823
Sustainability 9/10 2020-02-19

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CYCLOMB" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CYCLOMB" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.)

Innovation Principle (2019)

Developing an Innovation-Friendly Legislative Culture – the Innovation Principle at Work

Read More  

PULSe (2017)

Pervasive Ubiquitous Lightwave SEnsor

Read More  

DynaHUBS (2016)

DynaHUBs is a new application designed to kick start the development of the Physical Internet using a crowd-sourced approach

Read More