Opendata, web and dolomites

CYCLOMB SIGNED

Disruptive Cyclone-based technology for effective and affordable particulate matter emission reduction in biomass combustion systems

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 CYCLOMB project word cloud

Explore the words cloud of the CYCLOMB project. It provides you a very rough idea of what is the project "CYCLOMB" about.

launch    team    97    farms    2030    power    m3    provides    capacity    germany    least    lower    150    respect    hospitals    abide    ge    cyclomb    legislation    levels    abatement    emissions    bag    ideal    2023    complementary    200kw    flue    pm    electrostatic    affordable    optimized    profit    66    medium    direct    geometry    cyclone    device    achieves    primary    cumulative    district    80    boilers    recycling    mg    54m    office    hotels    additional    operation    plants    greenhouses    annual    filters    generate    upgrade    5mw       99    comply    total    biomass    small    tertiary    boiler    reduces    investing    denmark    fix    performance    automatic    emission    regulations    96    gas    capital    recirculation    urgently    combustion    attached    exist    uk    efficiency    combining    heating    gases    reduce    schools    price    particulate    countries    buildings    follow    26    always    final    market    precipitators    jobs    solution    until    maintenance    limits    solutions    95   

Project "CYCLOMB" data sheet

The following table provides information about the project.

Coordinator
KSM STOKER AS 

Organization address
address: NAESSUNDVEJ 440
city: KARBY
postcode: 7960
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Denmark [DK]
 Project website http://www.cyclomb.eu
 Total cost 1˙640˙773 €
 EC max contribution 1˙241˙826 € (76%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2. (PRIORITY 'Industrial leadership')
 Code Call H2020-FTIPilot-2016-1
 Funding Scheme IA
 Starting year 2017
 Duration (year-month-day) from 2017-04-01   to  2020-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    KSM STOKER AS DK (KARBY) coordinator 652˙019.00
2    UNIVERSIDAD DE VIGO ES (VIGO PONTEVEDRA) participant 310˙948.00
3    T.A.M.A. AERNOVA SRL IT (PREDAIA) participant 256˙812.00
4    SOLARBOX SOLAR SOLUTIONS SL ES (ARNEDO LA RIOJA) participant 22˙045.00

Map

 Project objective

A strong complementary team with more than 70 years' experience has come together to upgrade, scale-up and market launch an urgently needed affordable integrated solution for emission reduction for biomass combustion plants (CYCLOMB), which will generate 26.54M€ of cumulative profit and 97 new direct jobs by 2023. All EU countries will have to abide by new regulations (already implemented in Germany, Denmark and UK, other EU member states have to follow until 2030) which fix particulate matter (PM) emission limits under 20 mg/m3. Today no cost effective solutions exist that comply with the legislation. The CYCLOMB system achieves a 96-99% PM emission reduction, combining flue gas recycling and cyclone variable geometry. Recirculation of flue gases provides the biomass boiler with a high combustion efficiency (up to 95%) and reduces boiler emissions from 150 mg/m3 of typical automatic boilers to 80 mg/m3. By using a variable-geometry design of the attached PM abatement device a ≥96-99% particulate matter reduction is achieved. Final emission levels are always lower than 20 mg/m3 while investing only an additional 26% in PM abatement technology with respect to boiler price. It thus provides a comparative performance to the most advanced electrostatic precipitators and bag filters but at a 66% lower cost. The total annual operation and maintenance cost of biomass power plants is typically 5%-6.5% of the capital cost of small and medium capacity power plants. The implementation of CYCLOMB can reduce these maintenance costs at least 80% The PM abatement cyclone-technology solution will be optimized for the CYCLOMB integrated solution medium-scale range (200kW-5MW) ideal for medium scale district heating plants and applications in the primary sector (farms, greenhouses) and the tertiary sector (office buildings, schools, hospitals and hotels).

 Deliverables

List of deliverables.
Mid-term dissemination and communication report Documents, reports 2020-02-19 11:29:57

Take a look to the deliverables list in detail:  detailed list of CYCLOMB deliverables.

 Publications

year authors and title journal last update
List of publications.
2017 Araceli Regueiro, Lucie Jezerská, David Patiño, Raquel Pérez-Orozco, Jan Nečas, Martin Žídek
Experimental Study of the Viability of Low-Grade Biofuels in Small-Scale Appliances
published pages: 1823, ISSN: 2071-1050, DOI: 10.3390/su9101823
Sustainability 9/10 2020-02-19

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CYCLOMB" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CYCLOMB" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.)

Innovation Principle (2019)

Developing an Innovation-Friendly Legislative Culture – the Innovation Principle at Work

Read More  

PULSe (2017)

Pervasive Ubiquitous Lightwave SEnsor

Read More  

InToTidal (2017)

Demonstration of Integrated Solution for offshore Tocardo Tidal power plants.

Read More