Opendata, web and dolomites

SF-TLS SIGNED

Bridge Reestablishment Solutions – Super Fast Telescopic Launching System (SF-TLS)

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "SF-TLS" data sheet

The following table provides information about the project.

Coordinator
BERD - PROJECTO, INVESTIGACAO E ENGENHARIA DE PONTES SA 

Organization address
address: AV D AFONSO HENRIQUES EDIFICIO OLYMPUS I 1462 ESQ
city: MATOSINHOS
postcode: 4450 013
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Portugal [PT]
 Project website https://mbs.berd.eu/wp-content/uploads/2018/11/Publishable-Summary_MBS.pdf
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.7. (Secure societies - Protecting freedom and security of Europe and its citizens)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-04-01   to  2018-09-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    BERD - PROJECTO, INVESTIGACAO E ENGENHARIA DE PONTES SA PT (MATOSINHOS) coordinator 50˙000.00

Map

 Project objective

In our days, the effect of weather conditions, natural disasters, conflicts between peoples, refurbishment of degraded / weal structures requires daily bypasses to allow the freedom of movement of people. When a bridge collapse, the modular bridges available on the market are one of the conventional solutions that allow to restore the damaged infrastructures. In addition to the tragic human losses that these events often cause, there is always a high social and economic impact/cost due to the time between collapse and the bridge complete installation, that can reach several weeks or even months. BERD developed a new superfast launching system capable of launching an innovative modular bridge solution or even current modular bridges, based in a telescopic boom that can reduce the assembling and launching time up to 70%. Economic analysis shows that higher the importance of the road artery, higher is the payback of using the new Super Fast Telescopic Launching System (SF-TLS). Decision makers and roads and highways managers will have the opportunity to choose a fast reestablishment solution with a very important social and economic impact.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SF-TLS" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SF-TLS" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.7.;H2020-EU.2.3.1.)

SRAP (2018)

Safe and Readily Authenticated Pharmaceutical dosage forms (tablets)

Read More  

Quakebots (2018)

Artificial Intelligence and IoT for seismic monitoring

Read More  

Probe.ly (2018)

PROBE.LY - Web Application Vulnerability Scanning Suite for Agile Teams

Read More