Opendata, web and dolomites

LTT SIGNED

Long-term testing of airtightness to increase energy efficiency in buildings.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 LTT project word cloud

Explore the words cloud of the LTT project. It provides you a very rough idea of what is the project "LTT" about.

directive    successful    accumulated    163    public    consumption    period    projected    lower    58    implementing    residential    attaining    respectively    performance    2018    efficiency    clients    point    solution    2m    compound    1bn    ltt    months    efficient    measurable    leaking    savings    energy    alternative    money    venturigo    usp    2020    economy    airtightness    nearly    adjust    203    market    building    leakage    3m    technologies    responsible    x100    2017    29    society    renewable    time    jobs    36    selling    strategy    successfully    zero    27    sustainable    reduce    ec    237    designed    259    projections    cagr    24    55    employments    services    annual    sense    4bn    upfront    emissions    reducing    first    profit    solutions    highlights    40    co2    revenue    payback    quantified    0m    ventilation    2026    mwh    50    company    create    rate    air    full    feasibility    rapid    indirect    690    296    26    monitoring    commercialisation    buildings   

Project "LTT" data sheet

The following table provides information about the project.

Coordinator
AIRTIGHT AS 

Organization address
address: OSLO SCIENCE PARK GAUSTADALLEEN 21
city: OSLO
postcode: 349
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Project website https://www.airtight.ai
 Total cost 2˙452˙800 €
 EC max contribution 1˙716˙960 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-08-01   to  2020-07-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AIRTIGHT AS NO (OSLO) coordinator 1˙716˙960.00

Map

 Project objective

The LTT Phase 2 project is designed to address and implement the findings of our Feasibility Study and to enable a rapid and successful commercialisation of our Long-term testing of airtightness (LTT) technology. Venturigo has developed the only solution in the market capable of monitoring 24/7 how much air, energy and money are leaking in a given building, and to adjust the ventilation system to reduce this leakage by an average of 50%. LTT has x100 lower upfront cost than alternative solutions in the market for improving airtightness, and a 5.8/6.9 months payback period in high-rise residential buildings and large services buildings, respectively, a major advancement over the current state-of-the-art and our unique selling point (USP). The EC Nearly Zero-Energy Building Strategy 2020 highlights the importance of a sustainable European economy and society based on the efficient use of resources and renewable energy. In this sense, while buildings are now responsible for 40% of energy consumption and 36% of CO2 emissions in the EU, the Energy Performance of Buildings Directive requires all new buildings to be nearly zero-energy by the end of 2020 and all new public buildings by 2018. LTT will help to face these challenges by reducing buildings CO2 emissions by 690,296 tonnes and will offer our clients accumulated energy and cost savings of 1,237 MWh and €203.2m, respectively during the first 5 years of commercialisation according to our 5-years projections. LTT addresses the large and growing market of technologies for improving energy-efficiency in buildings, which is projected to increase from €163.4bn in 2017 to €259.1bn in 2026 attaining a compound annual growth rate (CAGR) of 5.26%. By successfully implementing the LTT project, we expect to create a measurable impact on Venturigo quantified as increased accumulated revenue of €58.3m and profit of €27.0m, creating 29 full time employments in our company and 55 indirect jobs in Europe.

 Deliverables

List of deliverables.
LTT website Websites, patent fillings, videos etc. 2019-09-13 15:28:52

Take a look to the deliverables list in detail:  detailed list of LTT deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "LTT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "LTT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

DeltaQon (2019)

IOT and cloud computing for online medical analysis service platform

Read More  

RoboSynFarm (2019)

Robotic Synthesis Farm

Read More  

TAPPXSSAI (2019)

Development of a system for automatic ad insertion into on-demand streaming video to provide new monetization mechanisms to the media industry

Read More