Opendata, web and dolomites

EWGB2000

Ekowasher Graffiti Blaster - A Closed-loop system for Environmentally Optimized Cleaning and Decontamination

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 EWGB2000 project word cloud

Explore the words cloud of the EWGB2000 project. It provides you a very rough idea of what is the project "EWGB2000" about.

nozzles    surfaces    market    entering    balance    companies    surpasses    performance    offers    solutions    efficiency    sweden    children    wash    drinking    shortages    efficient    porosity    cleaning    demand    risk    tools    blaster    exceed    residual    separated    graffiti    aerosols    feasibility    purified    exploring    exposure    express    pollutants    consumption    almost    recycled    segments    searching    designed    environmental    washed    wind    collected    ab    decontamination    markets    humans    indicate    economic    40    adjustments    waste    water    europeans    removal    cubic    industries    conduct    supply    innovation    ergonomic    hazardous    foreign    minimized    loop    spread    financial    causing    prices    appear    closed    meters    significantly    ekowasher    ground    procedure    contaminating    animals    expensive    11    improvements    reused    perspectives    business    filters    washing    industry    least    rising    estimations    expansion    inside    specially    combination    deeper    global    ordinary    zero   

Project "EWGB2000" data sheet

The following table provides information about the project.

Coordinator
EKOWASHER SWEDEN AB 

Organization address
address: C/O ALLBA HOLDING AB, BOX 3264
city: STOCKHOLM
postcode: 103 65
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website https://www.ekowasher.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-12-01   to  2019-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    EKOWASHER SWEDEN AB SE (STOCKHOLM) coordinator 50˙000.00

Map

 Project objective

The environmental costs of graffiti removal procedures make them far more expensive than the financial estimations may express. An ordinary graffiti removal procedure requires many cubic meters of drinking water. Waste water is spread around contaminating ground water and causing high exposure of humans (especially children) and animals to the hazardous aerosols. Currently water shortages affect at least 11% of Europeans and in 20 years from now, global water demand is likely to exceed water supply by 40%. As a result, prices for drinking water might significantly rise. The cleaning industry companies are searching for efficient tools that would balance the rising environmental requirements with their economic efficiency. Ekowasher Sweden AB offers an unique closed loop system where the residual products are separated and the wash water is purified by a combination of filters and reused. The water consumption of the Graffiti Blaster is almost zero. Through the specially designed washing nozzles, various surfaces of different porosity can be washed. As the washing water is collected and recycled inside the Graffiti Blaster, the risk of contaminating pollutants being spread by the wash water and the wind is minimized. The Graffiti Blaster’s environmental performance surpasses all other market-available solutions. In this project we will conduct a deeper analysis of the technical feasibility and of potential ergonomic improvements of the Graffiti Blaster. We will identify the necessary adjustments required for further expansion of the Graffiti Blaster across other industries and market segments. We will conduct an economic feasibility assessment that will indicate the perspectives of entering foreign markets. Moreover, we will investigate business opportunities that may appear through a wider adaptation of our innovation by exploring other segments of the cleaning, decontamination and removal industry.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "EWGB2000" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "EWGB2000" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

DeltaQon (2019)

IOT and cloud computing for online medical analysis service platform

Read More  

MindTrack (2019)

Analysis of eye vergence responses for the early detection and monitoring of cognitive and mental disorders

Read More  

IMPACT (2019)

Improving DNA Analysis for Correct Healthcare

Read More