Opendata, web and dolomites

PINTA2 SIGNED

IP1 Traction TD1 and Brakes TD5 – Phase 2

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "PINTA2" data sheet

The following table provides information about the project.

Coordinator
ALSTOM TRANSPORT SA 

Organization address
address: 48 RUE ALBERT DHALENNE
city: SAINT OUEN
postcode: 93400
website: www.alstom.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country France [FR]
 Total cost 0 €
 EC max contribution 12˙680˙591 € (0%)
 Programme 1. H2020-EU.3.4.8.1. (Innovation Programme 1 (IP1): Cost-efficient and reliable trains)
 Code Call H2020-S2RJU-CFM-2018
 Funding Scheme Shift2Rail-RIA-LS
 Starting year 2018
 Duration (year-month-day) from 2018-09-01   to  2020-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ALSTOM TRANSPORT SA FR (SAINT OUEN) coordinator 6˙242˙483.00
2    CAF POWER & AUTOMATION SL ES (DONOSTIA SAN SEBASTIAN) participant 1˙774˙137.00
3    SIEMENS MOBILITY GMBH DE (MUNCHEN) participant 1˙399˙887.00
4    BOMBARDIER TRANSPORTATION SWEDEN AB SE (VASTERAS) participant 929˙938.00
5    PATENTES TALGO SL ES (LAS ROZAS DE MADRID) participant 839˙916.00
6    FAIVELEY TRANSPORT ITALIA SPA IT (PIOSSASCO TO) participant 692˙916.00
7    KNORR-BREMSE SYSTEME FUR SCHIENENFAHRZEUGE GMBH DE (MUNCHEN) participant 443˙936.00
8    DEUTSCHE BAHN AG DE (BERLIN) participant 257˙751.00
9    SNCF MOBILITES FR (ST DENIS) participant 99˙623.00

Map

 Project objective

The PINTA2 Project (IP1 Traction TD1 and Brakes TD5 – Phase 2) will address the two key topics highlighted in the Shift2Rail Call topic S2R-CFM-IP1-01-2018 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management.

PINTA2 will continue, fully in line with PINTA Phase1, to work on Traction & Adhesion improvements of seven technical and economical KPIs of the Traction system that have been agreed and defined in PINTA (fully in line with S2R KPIs). These performances will be improved on five different train applications having different constraints, needs and specificities, from tramway to HST, including metro, sub-urban, regional trains. In particular, Traction sub-project will address the following KPIs: 1) Line capacity increase through weight, volume and noise savings of Traction equipment. 2) Reduction of Maintenance costs via higher reliability/availability and optimized for maintenance Traction components. 3) Railway system LCC reduction via higher energy efficiency and optimized capital cost of the Traction systems.

On Brakes Adhesion side, the work will lead to the achievement of a number of important objectives such as · higherTRL levels of improvement of braking degradation limit in poor adhesion condition · Management of all adhesion conditions in a way that brake distances are optimized · Improvement of the overall train safety, which relies substantially on the management of the wheel/rail contact · Reduction of wheel Life-Cycle-Costs (LCCs) through optimized wheel/rail contact in braking The activities will contribute in developing new performance solutions for Adhesion.

The work done in PINTA2 will consist in higher achievement ( up to TRL6) to prepare the final Phase3 work and future TRL7 demonstration on trains, at least Metro, Regional and HST expected around 2021-22.

 Publications

year authors and title journal last update
List of publications.
2019 1Fischer, Marcus*, 2Szekely, Ferenc, 3Frea, Matteo, 4Jennek, Steffen 1Knorr-Bremse Systeme für Schienenfahrzeuge, Germany, 2Knorr-Bremse Hungária Kft., Hungary, 3Faiveley Transport, a Wabtec Company, Italy, 4Siemens Mobility GmbH, Germany
IMPACT OF SLIP AT LOW ADHESION CONDITIONS CAUSED BY VARIOUS CONTAMINANTS
published pages: , ISSN: , DOI:
2020-03-05

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PINTA2" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PINTA2" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.8.1.)

PIVOT2 (2019)

Performance Improvement for Vehicles on Track 2

Read More  

PINTA2 (2018)

IP1 Traction TD1 and Brakes TD5 – Phase 2

Read More  

CARBODIN (2019)

Car Body Shells, Doors and Interiors

Read More