Opendata, web and dolomites

Safe4RAIL-2 SIGNED

Safe architecture for Robust distributed Application Integration in roLling stock 2

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Safe4RAIL-2 project word cloud

Explore the words cloud of the Safe4RAIL-2 project. It provides you a very rough idea of what is the project "Safe4RAIL-2" about.

interoperability    automotive    functional    ip1    conditioning    fdf    countries    specialized    reduce    switches    certification    industry    modular    multiple    paying    academic    hil    2018    reliability    simulation    heating    companies    communications    loop    platform    etbn    pillars    ethernet    02    expertise    layer    advantage    tsn    profiles    tests    framework    integration    ventilation    hardware    domains    coupling    network    5g    tcms    car    smes    made    technologies    maintenance    railway    levels    communication    air    determinism    time    virtual    manufacturer    dbd    drive    adding    technological    wireless    suitable    functionalities    safe4rail    lte    cfm    laboratory    oriented    consist    train    autosar    sensitive    data    backbone    consists    nodes    flexibility    trl    deployment    imp    standardization    remote    hvac    wltb    validated    sources    s2r    readiness    special    shift2rail    six    demonstrators    industrial    environment   

Project "Safe4RAIL-2" data sheet

The following table provides information about the project.

Coordinator
IKERLAN S. COOP 

Organization address
address: P JOSE MARIA ARIZMENDIARRIETA 2
city: MONDRAGON
postcode: 20500
website: www.ikerlan.es

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Total cost 3˙991˙632 €
 EC max contribution 3˙991˙632 € (100%)
 Programme 1. H2020-EU.3.4.8.1. (Innovation Programme 1 (IP1): Cost-efficient and reliable trains)
 Code Call H2020-S2RJU-OC-2018
 Funding Scheme Shift2Rail-RIA
 Starting year 2018
 Duration (year-month-day) from 2018-10-01   to  2021-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    IKERLAN S. COOP ES (MONDRAGON) coordinator 1˙185˙562.00
2    TTTECH COMPUTERTECHNIK AG AT (WIEN) participant 728˙750.00
3    MOXA EUROPE GMBH DE (UNTERSCHLEISSHEIM) participant 486˙090.00
4    ETAS GMBH DE (STUTTGART) participant 482˙232.00
5    EURECOM FR (BIOT) participant 430˙591.00
6    LIEBHERR-TRANSPORTATION SYSTEMS GMBH & CO KG AT (KORNEUBURG) participant 325˙281.00
7    TECHNIKON FORSCHUNGS- UND PLANUNGSGESELLSCHAFT MBH AT (VILLACH) participant 259˙750.00
8    WESTERMO TELEINDUSTRI AB SE (STORA SUNDBY) participant 93˙375.00

Map

 Project objective

Safe4RAIL-2 and its activities will be based on the development of four technological pillars aimed at improving the capabilities of the TCMS: (1) Integration of the Drive-by-Data (DbD) concept in the train network, i.e. Ethernet Train Backbone Nodes (ETBN), Car Switches and End Devices, using Time-Sensitive Network (TSN) technology for adding determinism to TCMS communications. (2) Development of LTE devices suitable for the deployment of a Wireless Train Backbone (WLTB), along with analyses including wireless consist communications, virtual coupling and 5G technology. (3) Integration of a Heating, Ventilation and Air Conditioning (HVAC) functionality on top of an Integrated Modular Platform (IMP) made up of a Functional Distribution Framework (FDF) platform and a Drive-by-Data communication layer, taking advantage of the expertise obtained from automotive industry specialized on AUTOSAR. (4) Integration of HVAC functionality in a virtual certification simulation environment including remote Hardware-In-the-Loop (HIL) tests. All these technological developments will be further validated in two laboratory demonstrators that will be set up by the Shift2Rail CFM project (S2R-CFM-IP1-02-2018), and will also contribute to standardization in both railway and wireless domains. These results will increase the flexibility and reliability of the TCMS communications, reduce development and maintenance costs, and achieve novel train functionalities, paying special attention to manufacturer interoperability and the availability of multiple sources. The consortium consists of 9 partners with specific industrial profiles and expertise in key technologies from six European countries, including 7 industrial partners (SMEs and large companies), 1 research institution and 1 academic partner. Such an industry-oriented consortium has been considered crucial to bring the selected technologies to higher Technology Readiness Levels (TRL) up to TRL-5.

 Deliverables

List of deliverables.
Internal and external IT communication infrastructure and project website Websites, patent fillings, videos etc. 2019-05-31 10:02:45
Project quality plan Documents, reports 2019-06-06 15:53:43

Take a look to the deliverables list in detail:  detailed list of Safe4RAIL-2 deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SAFE4RAIL-2" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SAFE4RAIL-2" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.8.1.)

PINTA2 (2018)

IP1 Traction TD1 and Brakes TD5 – Phase 2

Read More  

PIVOT2 (2019)

Performance Improvement for Vehicles on Track 2

Read More  

CARBODIN (2019)

Car Body Shells, Doors and Interiors

Read More