SLD_SCOOP

SLD and Icing tests on an Ice Protected Scoop Intake and Channel

 Coordinatore AEROTEX UK LLP 

 Organization address address: "SENTINEL HOUSE HARVEST CRESCENT, ANCELLS BUSINESS PARK"
city: FLEET
postcode: GU51 2UZ

contact info
Titolo: Mr.
Nome: Roger
Cognome: Gent
Email: send email
Telefono: +44 1252 417332
Fax: +44 1252 360910

 Nazionalità Coordinatore United Kingdom [UK]
 Totale costo 173˙025 €
 EC contributo 129˙769 €
 Programma FP7-JTI
Specific Programme "Cooperation": Joint Technology Initiatives
 Code Call SP1-JTI-CS-2009-01
 Funding Scheme JTI-CS
 Anno di inizio 2010
 Periodo (anno-mese-giorno) 2010-01-01   -   2011-03-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    AEROTEX UK LLP

 Organization address address: "SENTINEL HOUSE HARVEST CRESCENT, ANCELLS BUSINESS PARK"
city: FLEET
postcode: GU51 2UZ

contact info
Titolo: Mr.
Nome: Roger
Cognome: Gent
Email: send email
Telefono: +44 1252 417332
Fax: +44 1252 360910

UK (FLEET) coordinator 129˙769.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

icing    tests    series    trials    wind    tunnel    appendix   

 Obiettivo del progetto (Objective)

'This propopsal concerns the planning, execution and reporting of a series of environemntal icing tests to be conducted on an intake sccop and channel. The equipment will be manufactured under a separate EU contract. This proposal will test the supplied equipment under a range of conditions including in-flight icing (CS-25 Appendix C), freezing fog, super-cooled large droplets (FAR 25 Appendix X) and snow (ice crystal) conditions. Our proposal if fully compliant with the CfP. AeroTex is an SME specialising in Aircraft Icing Consultancy and has over 28 years combined staff experience in icing wind tunnel testing. A commericial icing wind tunnel will be hired for the period of the tests. The work programme is split into a series of logical and progressive steps including the establishment of the Test Requirments Document, Icing Tunnel Vendor selection, generating a Trials Plan, holding a Test Readiness Review followed by execution of the agreed tests. Finally a Trials report will be produced and issued along with copies of the data and video DVDs obtained during the test.'

Altri progetti dello stesso programma (FP7-JTI)

FLIP (2014)

Automatic FLIght Plan management tool

Read More  

CISTEM (2013)

Construction of Improved HT-PEM MEAs and Stacks for Long Term Stable Modular CHP Units

Read More  

TEMPO (2011)

Thermal Exchange Modelling and Power Optimization

Read More