Opendata, web and dolomites

TEMPERATE CO2

TEMPERATE WELDING

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 TEMPERATE CO2 project word cloud

Explore the words cloud of the TEMPERATE CO2 project. It provides you a very rough idea of what is the project "TEMPERATE CO2" about.

input    offers    automatic    automated    145    286    faster    a1    competitive    energy    entirely    emissions    advantages    intensive    unity    mag    longer    sparking    fulfill    first    power    ground    demonstrations    degima    welding    metalmechanical    university    projections    electronic    forth    gala    generate    defects    equipment    million    weld    volt    cantabria    heat    save    line    designed    steady    949    producing    generation    foundation    clients    companies    majority    cycle    multiplied    patent    keeps    develop    company    units    completely    provides    plan    minimum    commercial    ampere    4th    greenhouse    lots    significantly    overheat    gar    2011    mig    ep    savings    breaking    despite    yields    complete    600    reducing    efficient    awesome    considerable    supply    avoids    time    kw    accumulated    owns    actions    co2    transfer    reaching    full    reduces    grant    optimizing    manufacturing    duty    qualities    inverter    sold    sectors    gases    additionally    workpieces   

Project "TEMPERATE CO2" data sheet

The following table provides information about the project.

Coordinator
DESARROLLO Y GESTION INDUSTRIAL Y DEL MEDIO AMBIENTE SA 

Organization address
address: Avda. Juan Carlos I 2
city: Maliaño
postcode: 39600
website: www.degima.es

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.degima.es
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-05-01   to  2015-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    DESARROLLO Y GESTION INDUSTRIAL Y DEL MEDIO AMBIENTE SA ES (Maliaño) coordinator 50˙000.00
2    GALA GAR S.L. ES (ZARAGOZA) participant 0.00

Map

 Project objective

Develop a complete, highly efficient MIG-MAG welding equipment (600 A, 30 kW) with unity duty cycle factor, entirely designed to fulfill the needs in the metalmechanical sector. Additionally it offers considerable advantages in automated applications. A ground-breaking power supply technology developed by DEGIMA in collaboration with the University of Cantabria will be at the foundation of this new equipment. DEGIMA owns the European Patent of the power supply technology (EP 2 286 949 A1 /2011): Electronic system for optimizing energy transfer for welding equipment. Despite the advances in new inverter systems, current welding equipments require lots of power, overheat the workpieces and generate sparking that produce defects in the weld line. This new technology significantly reduces power use and CO2 emissions, keeps heat input to the workpieces to a minimum, provides full control of the welding parameters and avoids sparking and projections producing a weld line that is completely steady. This results in a faster welding process that yields a longer weld per unit of time and per volt-ampere used. Each one of this new welding equipment could save up to 20.000 kWh per year, which multiplied by the expected accumulated number of units sold by the 4th year yields savings reaching the 145 million kWh. With the help of this technology brought forth by DEGIMA and GALA GAR (partner and welding equipment manufacturing company), Europe can lead the third generation of welding equipment, much highly energy efficient than the previous, which will grant competitive advantages to all sectors involved into intensive welding activities. It is only a matter of time for the majority of welding equipment to be energy efficient. Reducing emissions of greenhouse gases would be awesome Our first target clients will be the automatic MIG welding process from metalmechanical companies which we plan to approach with commercial actions and demonstrations of the qualities of this equipment

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "TEMPERATE CO2" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "TEMPERATE CO2" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

iDriver (2015)

iDriver

Read More  

SUNIGENT (2015)

Intelligent sunlight system for energy efficient indoor lighting

Read More  

TurboFeasibility (2015)

Feasibility assessment of direct drive high speed turbo compressors for production oil free compressed air for medium size applications

Read More