Opendata, web and dolomites

Cryoshelter

Bringing a new LNG-tank technology to industrial readyness

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Cryoshelter project word cloud

Explore the words cloud of the Cryoshelter project. It provides you a very rough idea of what is the project "Cryoshelter" about.

america    precursor    time    reduce    serious    2017    particulates    sales    whom    liquefied    economic    stage    insulation    diesel    tank    natural    manufacturers    small    provides    suppliers    total    operators    petroleum    certification    engineers    2015    gas    fulfils    last    horizon2020    expressed    entry    ownership    sizes    rates    competitively    vacuum    lng    innovative    scaling    fuel    destructive    completing    trucks    infrastructure    weight    innovation    stability    area    integral    1000    60    tanks    critical    maintenance    98    volumes    adding    first    roi    ebit    final    priced    demonstration    30    full    business    cryoshelter    revolutionize    gt    policy    alternative    plan    expand    compete    ngv    north    heavy    modular    relationships    lower    dominant    qualified    alternatives    customers    truck    maker    readiness    capacity    types    commercialization    margin    market    commercial    transport    prospects    duty    hold    15    world    co2    ready    vehicle    staff    17    2014   

Project "Cryoshelter" data sheet

The following table provides information about the project.

Coordinator
CRYOSHELTER GMBH 

Organization address
address: GEWERBEPARKSTRASSE 91
city: DOBL-ZWARING
postcode: 8143
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Austria [AT]
 Project website http://www.cryoshelter.com
 Total cost 2˙433˙382 €
 EC max contribution 1˙700˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2014
 Funding Scheme SME-2
 Starting year 2015
 Duration (year-month-day) from 2015-05-01   to  2017-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    CRYOSHELTER GMBH AT (DOBL-ZWARING) coordinator 1˙700˙000.00

Map

 Project objective

Cryoshelter has developed an innovative liquefied natural gas (LNG) tank for heavy duty trucks that provides the first serious European technology to compete with the world’s dominant (U.S.) LNG tank maker that has 98% of the European market.

Available in over 1000 sizes due to its modular design, competitively priced Cryoshelter LNG tanks lower the total cost of ownership for truck operators by providing 30% more fuel capacity (adding 30% vehicle range), lower weight, increased hold time, and reduced maintenance due to greatly improved, long term stability of the insulation vacuum. These features address the most critical technical and economic concerns of the heavy duty truck sector and will revolutionize the commercial prospects for LNG as a fuel alternative to diesel in Europe, North America and elsewhere. The Cryoshelter program fulfils current EU policy objectives to reduce CO2 and diesel particulates as well as expand the market and infrastructure for fuel alternatives to petroleum.

Cryoshelter is at the final stage of research, development, and demonstration (Technology Readiness Level 6), now ready for the last destructive testing and field-testing, the precursor to full certification and market entry. We have pre-market relationships with three types of target customers who have expressed strong interest in the Cryoshelter LNG tank: European truck manufacturers, natural gas vehicle (NGV) system suppliers, and LNG truck operators, all of whom are an integral part of the final testing and commercialization plan.

The proposed program is targeted for the H2020 IT.1-2014-2015 Small Business Innovation for Transport (Phase II) area. The EU funding will enable testing, certification and scaling up for competitively priced production volumes as well as increase production and sales staff to 15 highly qualified engineers in 2017. Cryoshelter will achieve ROI rates of >60% and an EBIT margin of >17% after completing the Horizon2020 project.

 Deliverables

List of deliverables.
Maturity for US market Websites, patent fillings, videos etc. 2019-07-24 12:49:11
EU-Certification Documents, reports 2019-07-24 12:49:11
Proven in use Websites, patent fillings, videos etc. 2019-07-24 12:49:11
Market Announcement ACT Expo Websites, patent fillings, videos etc. 2019-07-24 12:49:11
US Certification Documents, reports 2019-07-24 12:49:11

Take a look to the deliverables list in detail:  detailed list of Cryoshelter deliverables.

 Publications

year authors and title journal last update
List of publications.
2016 Dr. Matthias Rebernik
LNG-2: The Second Generation, Multi-Length LNG Tank for Trucks
published pages: , ISSN: , DOI:
2019-07-24

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CRYOSHELTER" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CRYOSHELTER" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

GT WHR system (2015)

Green Turbine WHR System

Read More  

eco-railjacket (2015)

Total Full Ecologic Embedded Railways Jacket System

Read More