Opendata, web and dolomites

Cryoshelter

Bringing a new LNG-tank technology to industrial readyness

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Cryoshelter project word cloud

Explore the words cloud of the Cryoshelter project. It provides you a very rough idea of what is the project "Cryoshelter" about.

alternatives    ownership    readiness    truck    lng    vehicle    operators    ebit    completing    reduce    2014    time    transport    innovative    hold    alternative    innovation    petroleum    revolutionize    rates    whom    stage    serious    17    diesel    tanks    60    destructive    ready    co2    98    scaling    duty    expand    sizes    gt    plan    certification    engineers    qualified    15    modular    area    demonstration    compete    north    heavy    gas    relationships    customers    liquefied    entry    commercialization    types    weight    staff    fuel    lower    final    fulfils    integral    2017    economic    1000    total    margin    suppliers    vacuum    natural    last    policy    maintenance    ngv    america    roi    2015    horizon2020    sales    maker    infrastructure    commercial    full    precursor    tank    critical    competitively    manufacturers    first    volumes    30    adding    cryoshelter    capacity    provides    world    small    stability    market    particulates    dominant    priced    business    prospects    insulation    trucks    expressed   

Project "Cryoshelter" data sheet

The following table provides information about the project.

Coordinator
CRYOSHELTER GMBH 

Organization address
address: GEWERBEPARKSTRASSE 91
city: DOBL-ZWARING
postcode: 8143
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Austria [AT]
 Project website http://www.cryoshelter.com
 Total cost 2˙433˙382 €
 EC max contribution 1˙700˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2014
 Funding Scheme SME-2
 Starting year 2015
 Duration (year-month-day) from 2015-05-01   to  2017-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    CRYOSHELTER GMBH AT (DOBL-ZWARING) coordinator 1˙700˙000.00

Map

 Project objective

Cryoshelter has developed an innovative liquefied natural gas (LNG) tank for heavy duty trucks that provides the first serious European technology to compete with the world’s dominant (U.S.) LNG tank maker that has 98% of the European market.

Available in over 1000 sizes due to its modular design, competitively priced Cryoshelter LNG tanks lower the total cost of ownership for truck operators by providing 30% more fuel capacity (adding 30% vehicle range), lower weight, increased hold time, and reduced maintenance due to greatly improved, long term stability of the insulation vacuum. These features address the most critical technical and economic concerns of the heavy duty truck sector and will revolutionize the commercial prospects for LNG as a fuel alternative to diesel in Europe, North America and elsewhere. The Cryoshelter program fulfils current EU policy objectives to reduce CO2 and diesel particulates as well as expand the market and infrastructure for fuel alternatives to petroleum.

Cryoshelter is at the final stage of research, development, and demonstration (Technology Readiness Level 6), now ready for the last destructive testing and field-testing, the precursor to full certification and market entry. We have pre-market relationships with three types of target customers who have expressed strong interest in the Cryoshelter LNG tank: European truck manufacturers, natural gas vehicle (NGV) system suppliers, and LNG truck operators, all of whom are an integral part of the final testing and commercialization plan.

The proposed program is targeted for the H2020 IT.1-2014-2015 Small Business Innovation for Transport (Phase II) area. The EU funding will enable testing, certification and scaling up for competitively priced production volumes as well as increase production and sales staff to 15 highly qualified engineers in 2017. Cryoshelter will achieve ROI rates of >60% and an EBIT margin of >17% after completing the Horizon2020 project.

 Deliverables

List of deliverables.
Maturity for US market Websites, patent fillings, videos etc. 2019-07-24 12:49:11
EU-Certification Documents, reports 2019-07-24 12:49:11
Proven in use Websites, patent fillings, videos etc. 2019-07-24 12:49:11
Market Announcement ACT Expo Websites, patent fillings, videos etc. 2019-07-24 12:49:11
US Certification Documents, reports 2019-07-24 12:49:11

Take a look to the deliverables list in detail:  detailed list of Cryoshelter deliverables.

 Publications

year authors and title journal last update
List of publications.
2016 Dr. Matthias Rebernik
LNG-2: The Second Generation, Multi-Length LNG Tank for Trucks
published pages: , ISSN: , DOI:
2019-07-24

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CRYOSHELTER" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CRYOSHELTER" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

SIADE (2014)

Spatial Decision Support System for Transportation Planning

Read More  

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More