Opendata, web and dolomites

Cryoshelter

Bringing a new LNG-tank technology to industrial readyness

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Cryoshelter project word cloud

Explore the words cloud of the Cryoshelter project. It provides you a very rough idea of what is the project "Cryoshelter" about.

policy    infrastructure    first    suppliers    manufacturers    commercial    volumes    stage    certification    expressed    whom    lower    cryoshelter    qualified    particulates    transport    natural    truck    priced    insulation    heavy    sales    types    north    gt    ngv    ownership    plan    area    tanks    economic    business    ebit    dominant    17    lng    co2    adding    diesel    fulfils    15    stability    world    relationships    roi    weight    demonstration    final    duty    fuel    horizon2020    readiness    precursor    rates    critical    full    vehicle    expand    innovation    commercialization    provides    alternative    completing    market    sizes    capacity    competitively    total    entry    compete    scaling    destructive    2014    margin    time    customers    maker    prospects    ready    gas    serious    integral    liquefied    98    america    innovative    modular    reduce    trucks    vacuum    maintenance    engineers    2015    last    30    60    1000    small    alternatives    2017    revolutionize    tank    petroleum    operators    hold    staff   

Project "Cryoshelter" data sheet

The following table provides information about the project.

Coordinator
CRYOSHELTER GMBH 

Organization address
address: GEWERBEPARKSTRASSE 91
city: DOBL-ZWARING
postcode: 8143
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Austria [AT]
 Project website http://www.cryoshelter.com
 Total cost 2˙433˙382 €
 EC max contribution 1˙700˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2014
 Funding Scheme SME-2
 Starting year 2015
 Duration (year-month-day) from 2015-05-01   to  2017-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    CRYOSHELTER GMBH AT (DOBL-ZWARING) coordinator 1˙700˙000.00

Map

 Project objective

Cryoshelter has developed an innovative liquefied natural gas (LNG) tank for heavy duty trucks that provides the first serious European technology to compete with the world’s dominant (U.S.) LNG tank maker that has 98% of the European market.

Available in over 1000 sizes due to its modular design, competitively priced Cryoshelter LNG tanks lower the total cost of ownership for truck operators by providing 30% more fuel capacity (adding 30% vehicle range), lower weight, increased hold time, and reduced maintenance due to greatly improved, long term stability of the insulation vacuum. These features address the most critical technical and economic concerns of the heavy duty truck sector and will revolutionize the commercial prospects for LNG as a fuel alternative to diesel in Europe, North America and elsewhere. The Cryoshelter program fulfils current EU policy objectives to reduce CO2 and diesel particulates as well as expand the market and infrastructure for fuel alternatives to petroleum.

Cryoshelter is at the final stage of research, development, and demonstration (Technology Readiness Level 6), now ready for the last destructive testing and field-testing, the precursor to full certification and market entry. We have pre-market relationships with three types of target customers who have expressed strong interest in the Cryoshelter LNG tank: European truck manufacturers, natural gas vehicle (NGV) system suppliers, and LNG truck operators, all of whom are an integral part of the final testing and commercialization plan.

The proposed program is targeted for the H2020 IT.1-2014-2015 Small Business Innovation for Transport (Phase II) area. The EU funding will enable testing, certification and scaling up for competitively priced production volumes as well as increase production and sales staff to 15 highly qualified engineers in 2017. Cryoshelter will achieve ROI rates of >60% and an EBIT margin of >17% after completing the Horizon2020 project.

 Deliverables

List of deliverables.
Maturity for US market Websites, patent fillings, videos etc. 2019-07-24 12:49:11
EU-Certification Documents, reports 2019-07-24 12:49:11
Proven in use Websites, patent fillings, videos etc. 2019-07-24 12:49:11
Market Announcement ACT Expo Websites, patent fillings, videos etc. 2019-07-24 12:49:11
US Certification Documents, reports 2019-07-24 12:49:11

Take a look to the deliverables list in detail:  detailed list of Cryoshelter deliverables.

 Publications

year authors and title journal last update
List of publications.
2016 Dr. Matthias Rebernik
LNG-2: The Second Generation, Multi-Length LNG Tank for Trucks
published pages: , ISSN: , DOI:
2019-07-24

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CRYOSHELTER" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CRYOSHELTER" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

SIADE (2014)

Spatial Decision Support System for Transportation Planning

Read More  

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More