Opendata, web and dolomites

Cryoshelter

Bringing a new LNG-tank technology to industrial readyness

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Cryoshelter project word cloud

Explore the words cloud of the Cryoshelter project. It provides you a very rough idea of what is the project "Cryoshelter" about.

alternatives    engineers    plan    full    sizes    dominant    total    adding    ebit    15    entry    reduce    modular    weight    hold    lower    30    commercial    market    provides    particulates    america    serious    cryoshelter    economic    destructive    final    98    gt    gas    vacuum    small    north    2017    customers    expressed    fuel    maker    liquefied    rates    manufacturers    qualified    precursor    truck    volumes    innovation    trucks    tank    sales    roi    vehicle    60    maintenance    critical    2015    competitively    horizon2020    lng    heavy    time    last    duty    area    operators    tanks    completing    ngv    margin    scaling    prospects    stage    expand    diesel    innovative    compete    demonstration    infrastructure    stability    commercialization    17    natural    ready    integral    policy    suppliers    staff    alternative    capacity    business    co2    whom    transport    revolutionize    world    insulation    petroleum    fulfils    certification    priced    1000    types    relationships    2014    first    ownership    readiness   

Project "Cryoshelter" data sheet

The following table provides information about the project.

Coordinator
CRYOSHELTER GMBH 

Organization address
address: GEWERBEPARKSTRASSE 91
city: DOBL-ZWARING
postcode: 8143
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Austria [AT]
 Project website http://www.cryoshelter.com
 Total cost 2˙433˙382 €
 EC max contribution 1˙700˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2014
 Funding Scheme SME-2
 Starting year 2015
 Duration (year-month-day) from 2015-05-01   to  2017-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    CRYOSHELTER GMBH AT (DOBL-ZWARING) coordinator 1˙700˙000.00

Map

 Project objective

Cryoshelter has developed an innovative liquefied natural gas (LNG) tank for heavy duty trucks that provides the first serious European technology to compete with the world’s dominant (U.S.) LNG tank maker that has 98% of the European market.

Available in over 1000 sizes due to its modular design, competitively priced Cryoshelter LNG tanks lower the total cost of ownership for truck operators by providing 30% more fuel capacity (adding 30% vehicle range), lower weight, increased hold time, and reduced maintenance due to greatly improved, long term stability of the insulation vacuum. These features address the most critical technical and economic concerns of the heavy duty truck sector and will revolutionize the commercial prospects for LNG as a fuel alternative to diesel in Europe, North America and elsewhere. The Cryoshelter program fulfils current EU policy objectives to reduce CO2 and diesel particulates as well as expand the market and infrastructure for fuel alternatives to petroleum.

Cryoshelter is at the final stage of research, development, and demonstration (Technology Readiness Level 6), now ready for the last destructive testing and field-testing, the precursor to full certification and market entry. We have pre-market relationships with three types of target customers who have expressed strong interest in the Cryoshelter LNG tank: European truck manufacturers, natural gas vehicle (NGV) system suppliers, and LNG truck operators, all of whom are an integral part of the final testing and commercialization plan.

The proposed program is targeted for the H2020 IT.1-2014-2015 Small Business Innovation for Transport (Phase II) area. The EU funding will enable testing, certification and scaling up for competitively priced production volumes as well as increase production and sales staff to 15 highly qualified engineers in 2017. Cryoshelter will achieve ROI rates of >60% and an EBIT margin of >17% after completing the Horizon2020 project.

 Deliverables

List of deliverables.
Maturity for US market Websites, patent fillings, videos etc. 2019-07-24 12:49:11
EU-Certification Documents, reports 2019-07-24 12:49:11
Proven in use Websites, patent fillings, videos etc. 2019-07-24 12:49:11
Market Announcement ACT Expo Websites, patent fillings, videos etc. 2019-07-24 12:49:11
US Certification Documents, reports 2019-07-24 12:49:11

Take a look to the deliverables list in detail:  detailed list of Cryoshelter deliverables.

 Publications

year authors and title journal last update
List of publications.
2016 Dr. Matthias Rebernik
LNG-2: The Second Generation, Multi-Length LNG Tank for Trucks
published pages: , ISSN: , DOI:
2019-07-24

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CRYOSHELTER" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CRYOSHELTER" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More  

eco-railjacket (2015)

Total Full Ecologic Embedded Railways Jacket System

Read More