Opendata, web and dolomites

WELL

Wind, Efficient, Light, Lifter

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 WELL project word cloud

Explore the words cloud of the WELL project. It provides you a very rough idea of what is the project "WELL" about.

lack    turbines    critical    itself    generator    24    72    competitive    workers    manufacturers    lift    scope    blade    2000    well    replacement    appropriate    company    protected    technological    public    expenses    reducing    risks    first    groups    models    waiting    profit    90    7m    leunamme    business    needing    union    presented    approached    submission    hours    maintenance    maximizing    turbine    vs    aligned    operation    customer    20    operators    operated    wind    dependent    strategy    score    01    evaluation    replacements    uses    last    weak    telescopic    2015    tower    scaling    14    tonnage    iberdrola    expansion    sie    sme    usa    farms    total    point    services    metre    03    time    scalability    patent    launch    cranes    approximately    components    raquo    assembly    88    engineering    accidents    minimizing    blades    12    intrument    day    farm    lt    plans    commercial    analyisis    period    global    18    innovation    laquo    winds    feasibility    contingency   

Project "WELL" data sheet

The following table provides information about the project.

Coordinator
LEUNAMME ENGINEERING S.L.U. 

Organization address
address: C/ RIO URBI, 53
city: GORRAIZ-EGUES
postcode: 31620
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://koalalifter.com
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2015
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-09-01   to  2016-02-29

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    LEUNAMME ENGINEERING S.L.U. ES (GORRAIZ-EGUES) coordinator 50˙000.00

Map

Leaflet | Map data © OpenStreetMap contributors, CC-BY-SA, Imagery © Mapbox

 Project objective

The “WELL” system, protected by patent in Europe and in the USA is an innovation and technological advancement on a global scope, that allows the assembly and replacement of the blades of a wind turbine on a wind farm without needing to use large tonnage cranes, by using a “telescopic lift” system that uses the turbine wind tower itself as a support system. It can be operated by no more than 3 workers (vs 14), work can be completed in less than 24 hours (vs. 72), and in winds of up to 12 metre/second (vs. <7m/s), thus minimizing the number of accidents, reducing the waiting period for blade replacements, reducing the cost of the operation by more than 90%, and also reducing the profit loss for wind farm operators (approximately €2000 per day). Leunamme Engineering has an agreement with Iberdrola to launch the WELL system. WELL is aligned with the global target «20-20-20» of the European Union.

The main customer groups of WELL system are the wind farms operators, and manufacturers of wind turbines. They are interested in reducing maintenance costs and in maximizing the operational hours of the wind farm, because O&M expenses are becoming critical in order to be more competitive and less dependent on public support.

Through this Feasibility Analysis, the design of a technological scalability and commercial expansion strategy of the company services at a European and global level have been approached, in order to include other generator models and other large components of wind turbines. Phase II would consider the implementation of the technological scaling development of WELL system.

The WELL proposal was presented for the first time to the last call of the SME-Intrument program (18-03-2015, SIE-01-2015 1 P) achieving a total score of 12,88. The only weak point in the evaluation was the lack of a risks analyisis. An appropriate technical and business risks analysis, and their associated contingency plans, has been included in this new submission of the proposal.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "WELL" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "WELL" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

VaporPV (2016)

Low cost PV cooling system for ground-mounted and rooftop systems - VaporPV

Read More  

MirrorPV (2015)

MirrorPV - Balanced growth photovoltaic generation with Roof PV mirrors

Read More  

EcoMultiCloud (2015)

Hierarchical Approach for Green Workload Management in Distributed Data Centers reducing energy bill and carbon footprint

Read More