Opendata, web and dolomites

RiserSure SIGNED

Rapid Integrity Assessment of Flexible Risers for Offshore Oil and Gas Installations

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 RiserSure project word cloud

Explore the words cloud of the RiserSure project. It provides you a very rough idea of what is the project "RiserSure" about.

preparations    downtime    market    commercial    mexico    sea    contribution    jobs    penetrates    designed    successful    revenues    warning    risersure    driving    digital    alone    uses    2010    destructive    complete    trials    shore    operation    requesting    2013    industry    service    launch    ideal    incidents    safety    profit    2015    rapid    521    foundations    operators    risers    drilling    legislation    action    reflecting    trl9    costly    commercialisation    gulf    trl6    riser    270m    subsea    led    gas    offshore    reduce    customers    90m    nature    leaks    139    pipe    lost    asset    providers    sme    lay    radiography    optimising    reducing    148    plans    ndt    adapting    reliably    trade    flexible    directive    creates    environmental    monitor    manufacturing    techniques    layers    profitability    892    oil    sub    3m    cumulative    customer    assessing    damages    is    roi    day    detector    50m    environment    disaster    pipes    prompted    benefits    saving    rule    33   

Project "RiserSure" data sheet

The following table provides information about the project.

Coordinator
INNOVATIVE TECHNOLOGY AND SCIENCE LIMITED - INNOTECUK 

Organization address
address: HILDERSHAM ROAD NORTH WING THE OLD LIVERY
city: CAMBRIDGE
postcode: CB21 6DR
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.risersure.eu/
 Total cost 3˙044˙860 €
 EC max contribution 2˙565˙674 € (84%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2. (PRIORITY 'Industrial leadership')
 Code Call H2020-FTIPilot-2016-1
 Funding Scheme IA
 Starting year 2016
 Duration (year-month-day) from 2016-12-01   to  2019-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    INNOVATIVE TECHNOLOGY AND SCIENCE LIMITED - INNOTECUK UK (CAMBRIDGE) coordinator 529˙173.00
2    TWI LIMITED UK (CAMBRIDGE) participant 777˙283.00
3    LONDON SOUTH BANK UNIVERSITY LBG UK (LONDON) participant 670˙291.00
4    MISTRAS GROUP HELLAS ANONYMOS BIOMICHANIKI KAI EMPORIKI ETAIREIA EL (ATHINA) participant 330˙090.00
5    IKNOWHOW INTERNATIONAL SARL LU (LUXEMBOURG) participant 258˙835.00
6    WLB LIMITED CY (LEFKOSIA) participant 0.00

Map

 Project objective

This action will bring to market a unique product, RiserSure™, for assessing the condition of flexible riser pipes widely used in offshore oil and gas production. Riser failure is increasing and is costly (€3M per day from lost production alone). It damages the environment and creates the potential for major incidents. The Gulf of Mexico disaster in 2010 prompted very recent new safety legislation in the US and Europe (2015 US offshore safety drilling rule, 2013 EU Offshore Safety Directive). This is driving the uptake of non-destructive testing (NDT) to monitor riser condition. Current techniques cannot reliably or efficiently assess flexible riser condition to provide advance warning of failure. Radiography is ideal as it penetrates all the layers in the pipe. However, current systems are designed for on-shore applications, not sub-sea. The objective of this action is to take to market RiserSure™, which uses a novel subsea digital radiography detector. We will take the technology from TRL6 to TRL9 by optimising it for operation on flexible risers and adapting it to the needs of our customers – the NDT service providers and asset operators. Sub-sea field trials will demonstrate customer benefits. Within this 33 month project we will complete commercial and manufacturing preparations for product launch and lay the foundations for growth. RiserSure™ will reduce the environmental impact and improve the safety of offshore production. It will improve the profitability of operators by reducing leaks and downtime, saving the industry €270M over 5 years. It will develop new revenues of €90M with a profit of €50M cumulative within 5 years of the end of the action; creating 139 new jobs for the SME led the consortium and an ROI of 148:1. Our industry-led consortium is requesting an EU contribution of €2,521,892 reflecting the costly nature of offshore testing, and our ambitious plans to achieve successful and rapid commercialisation of RiserSure™.

 Deliverables

List of deliverables.
Certification technical file Documents, reports 2020-01-14 15:14:25
Operation & Maintenance manual Documents, reports 2020-01-14 15:14:25
Promotional Material Pack Documents, reports 2019-09-02 11:01:30
Project website Websites, patent fillings, videos etc. 2019-09-02 11:01:30

Take a look to the deliverables list in detail:  detailed list of RiserSure deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "RISERSURE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "RISERSURE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.)

Innovation Principle (2019)

Developing an Innovation-Friendly Legislative Culture – the Innovation Principle at Work

Read More  

PULSe (2017)

Pervasive Ubiquitous Lightwave SEnsor

Read More  

InToTidal (2017)

Demonstration of Integrated Solution for offshore Tocardo Tidal power plants.

Read More