Opendata, web and dolomites

SPG SIGNED

Seafarm Pulse Guard

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SPG project word cloud

Explore the words cloud of the SPG project. It provides you a very rough idea of what is the project "SPG" about.

parasite    2014054951    immediately    wo    stages    ler    farmers    nauplius    estimate    life    spg    attach    7m    stopping    signed    preventive    surrounding    biofouling    assembled    pulses    technologies    preventing    pelagic    seafarm    solution    validate    escape    farming    20    start    harvest    agreements    trl8    cutting    prototypes    334396    commercialisation    sea    uses    cage    environmental    compliant    41    min    inactivate    post    trl9    reached    functional    ecosystem    ready       successful    trl7    guard    asa    predictable    84    brings    lice    opening    least    accumulated    free    additional    patented    vest    fish    optimisation    full    pulse    salmon    commercial    copepodites    infection    90    closure    chemical    3m    parasites    welfare    market    electrical    marine    infestation    2023    mature    b1    revenue    validation    spreading    standards    risk    sites    time    streams    sustainability    sustainable    positions    subsequent    completion    a1    farms    kg    environment    sub    reduces    oslash    treatment    expansion    attenuates    crustacean    profits    strictest    27   

Project "SPG" data sheet

The following table provides information about the project.

Coordinator
SFD AS 

Organization address
address: LERVIGSVEIEN 16
city: STAVANGER
postcode: 4014
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Project website http://www.sfd.no
 Total cost 2˙516˙250 €
 EC max contribution 1˙761˙375 € (70%)
 Programme 1. H2020-EU.3.2.5. (Cross-cutting marine and maritime research)
2. H2020-EU.3.2.3. (Unlocking the potential of aquatic living resources)
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-03-01   to  2019-02-28

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SFD AS NO (STAVANGER) coordinator 1˙761˙375.00

Map

 Project objective

SPG will mature and validate a unique, chemical-free, and cost-effective technology preventing sea lice infestation in salmon farms and contributing to a more sustainable parasite control, with no additional environmental impact. Our patented technology (Seafarm Pulse Guard, WO 2014054951 A1 and NO 334396 B1) uses electrical pulses to inactivate pelagic stages of crustacean parasites (Nauplius/Copepodites) before they attach to the fish, stopping infestation within the cage and further spreading in the surrounding environment. SPG effectively reduces sea lice infestation by up to 90%, biofouling by 90% and attenuates the risk of escape in 20%, cutting sea lice treatment costs from current €0.3-0.9 to €0.1-0.2 per kg of fish produced. Being compliant with the strictest fish welfare standards, SPG brings fish farmers more predictable revenue streams, and a reduction in overall operational costs of min. 20%. Upon successful completion of this Phase II project, SPG will be the only preventive method in the market that also reduces infection spreading in the marine ecosystem, increasing the sustainability of existing sea salmon farming sites and opening new opportunities for expansion and access to new areas. We have already signed commercial agreements with Marine Harvest ASA and Lerøy Vest allowing us to start the commercialisation of our SPG solution immediately after SPG project closure. By the end of 2023 (5 years post-project) we estimate to have reached an accumulated revenue of €84.3m, generated at least 27 new full-time positions, and accumulated profits of €41.7m. We have completed the development of the SPG’s sub-system technologies and prototypes to TRL7. Now the technology can be integrated and assembled into a functional system at TRL8, with necessary adaptation and optimisation, ready for subsequent validation in a large-scale real-life environment (TRL9).

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SPG" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SPG" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.2.5.;H2020-EU.3.2.3.;H2020-EU.2.3.1.)

SEABOAT (2018)

Sustainable Environmentally-friendly Advanced-Composite Zero-Emission Boats

Read More  

ICE2LAST (2018)

Innovative technology based on the integration of natural substances in ice to improve animal welfare and extend shelf-life of farmed fish

Read More  

OpenOceanFC (2017)

The Open Ocean Fish Cage

Read More