Opendata, web and dolomites

SPG SIGNED

Seafarm Pulse Guard

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SPG project word cloud

Explore the words cloud of the SPG project. It provides you a very rough idea of what is the project "SPG" about.

infection    immediately    pulse    wo    time    20    marine    ler    nauplius    validate    2023    sea    farmers    expansion    mature    sub    technologies    commercial    7m    guard    electrical    salmon    additional    subsequent    full    parasites    inactivate    opening    optimisation    attach    strictest    2014054951    farms    ecosystem    90    streams    stopping    biofouling    3m    spreading    assembled    surrounding    market    compliant    cage    chemical    41    sustainability    signed    crustacean    min    agreements    preventing    84    harvest    lice    prototypes    brings    completion    solution    patented    b1    standards    risk    cutting    trl8       welfare    closure    sustainable    a1    functional    infestation    revenue    uses    trl7    start    copepodites    validation    pulses    spg    preventive    parasite    ready    positions    pelagic    post    farming    fish    estimate    commercialisation    least    attenuates    accumulated    profits    sites    334396    seafarm    predictable    kg    treatment    asa    environment    life    trl9    environmental    successful    reached    free    stages    escape    oslash    reduces    27    vest   

Project "SPG" data sheet

The following table provides information about the project.

Coordinator
SFD AS 

Organization address
address: LERVIGSVEIEN 16
city: STAVANGER
postcode: 4014
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Project website http://www.sfd.no
 Total cost 2˙516˙250 €
 EC max contribution 1˙761˙375 € (70%)
 Programme 1. H2020-EU.3.2.5. (Cross-cutting marine and maritime research)
2. H2020-EU.3.2.3. (Unlocking the potential of aquatic living resources)
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-03-01   to  2019-02-28

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SFD AS NO (STAVANGER) coordinator 1˙761˙375.00

Map

 Project objective

SPG will mature and validate a unique, chemical-free, and cost-effective technology preventing sea lice infestation in salmon farms and contributing to a more sustainable parasite control, with no additional environmental impact. Our patented technology (Seafarm Pulse Guard, WO 2014054951 A1 and NO 334396 B1) uses electrical pulses to inactivate pelagic stages of crustacean parasites (Nauplius/Copepodites) before they attach to the fish, stopping infestation within the cage and further spreading in the surrounding environment. SPG effectively reduces sea lice infestation by up to 90%, biofouling by 90% and attenuates the risk of escape in 20%, cutting sea lice treatment costs from current €0.3-0.9 to €0.1-0.2 per kg of fish produced. Being compliant with the strictest fish welfare standards, SPG brings fish farmers more predictable revenue streams, and a reduction in overall operational costs of min. 20%. Upon successful completion of this Phase II project, SPG will be the only preventive method in the market that also reduces infection spreading in the marine ecosystem, increasing the sustainability of existing sea salmon farming sites and opening new opportunities for expansion and access to new areas. We have already signed commercial agreements with Marine Harvest ASA and Lerøy Vest allowing us to start the commercialisation of our SPG solution immediately after SPG project closure. By the end of 2023 (5 years post-project) we estimate to have reached an accumulated revenue of €84.3m, generated at least 27 new full-time positions, and accumulated profits of €41.7m. We have completed the development of the SPG’s sub-system technologies and prototypes to TRL7. Now the technology can be integrated and assembled into a functional system at TRL8, with necessary adaptation and optimisation, ready for subsequent validation in a large-scale real-life environment (TRL9).

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SPG" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SPG" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.2.5.;H2020-EU.3.2.3.;H2020-EU.2.3.1.)

SEABOAT (2018)

Sustainable Environmentally-friendly Advanced-Composite Zero-Emission Boats

Read More  

ICE2LAST (2018)

Innovative technology based on the integration of natural substances in ice to improve animal welfare and extend shelf-life of farmed fish

Read More  

OpenOceanFC (2017)

The Open Ocean Fish Cage

Read More