Opendata, web and dolomites

eMRB SIGNED

CodeIT Electronic Manufacturing Record Book

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 eMRB project word cloud

Explore the words cloud of the eMRB project. It provides you a very rough idea of what is the project "eMRB" about.

codeit    digital    gross    boost    selling    post    offshore    validation    international    2023    techni    point    actual    maturation    ftes    least    piloting    optimise    automatic    market    categories    book    stringent    2016    grouped    industrial    solution    outlined    feasibility    46m    elevate    102728    validate    profit    commercial    environments    wp1    disruptive    ict    emrb    commercialisation    record    automated    requirement    chain    rapid    worldwide    quantified    manufacturing    sme    15m    evcam    creation    prior    sectors    employment    nmf    lifecycle    communication    45    documentation    functionalities    commercialise    traceability    tts    sales    facilities    innovation    250    cloud    software    mrb    wp4    group    perspective    revenues    pilot    trl6    first    continuous    wp2    successfully    traction    track    significantly    operation    trl8    trl    exceeding    accumulated    maritime    series    successful    electronic    quality   

Project "eMRB" data sheet

The following table provides information about the project.

Coordinator
CODEIT AS 

Organization address
address: OSTENSJOVEIEN 15B
city: OSLO
postcode: 661
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Project website http://codeit.no/horizon-2020/
 Total cost 1˙762˙186 €
 EC max contribution 1˙233˙530 € (70%)
 Programme 1. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-07-01   to  2019-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    CODEIT AS NO (OSLO) coordinator 1˙233˙530.00

Map

 Project objective

'The objective of the eMRB project is commercialise and bring to market the first and only worldwide cloud based software solution specifically for the automatic creation and validation of digital Manufacturing Record Book (MRB) - a major advancement on current state-of-the-art and our unique selling point. CodeIT eMRB is a ICT disruptive software solution for the automated creation of comprehensive electronic documentation for design, production, operation, testing and delivery of products that require stringent documentation from a product lifecycle perspective, and where continuous track and traceability is a key requirement.

The overall objective of the eMRB Phase 2 project is to address and implement the findings of our SME Phase 1 Feasibility Study (EVCAM#2016/102728) to enable rapid and successful commercialisation of eMRB. We have outlined a series of Commercialisation Objectives that can be grouped in 3 categories and achieving them will bring us to a wide international market uptake: 1) Technology maturation objectives will optimise eMRB functionalities prior to piloting at end-user’s facilities. Objective is to raise the TRL of our technology from its current TRL6 to TRL8 (WP1). 2) Pilot and validation objectives to demonstrate and validate the commercial potential of eMRB in actual end user operating environments across two different industrial market sectors (Offshore/Maritime) together with three end users; Quality Group AS, TTS NMF GmbH and Techni AS. The piloting activities will elevate eMRB from TRL8 to 9 (WP2-3). 3) Market maturation, communication and innovation management objectives enabling us to successfully bring eMRB to the market and reach sales traction post-project (WP4-6).

Through eMRB we will significantly boost our growth – quantified as accumulated revenues exceeding €46m for the 5-year post-project (2023) with accumulated gross profit of more than €15m and employment growth of at least 45 FTEs at CodeIT and 250 in our value chain.'

 Deliverables

List of deliverables.
eMRB project website Websites, patent fillings, videos etc. 2019-07-19 13:46:17

Take a look to the deliverables list in detail:  detailed list of eMRB deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "EMRB" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "EMRB" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.2.1.1.;H2020-EU.2.3.1.)

WIMUACT (2017)

TECHNOLOGY FOR THE IMPROVEMENT OF SPORTS PERFORMANCE IN NON-PROFESSIONAL CONTEXTS

Read More  

Enterprise BIM (2017)

Enterprise BIM digitization platform feasibility verification

Read More  

REALM (2015)

A disruptive method to free physicians from Hospital Information Systems by generating fault free patient diagnostic documents in real-time using natural language

Read More