Opendata, web and dolomites

TRIBOSORT

Robust recycling technology that separates different plastic types from a mix of plastic waste to produce a plastic material directly marketable to manufacturers

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 TRIBOSORT project word cloud

Explore the words cloud of the TRIBOSORT project. It provides you a very rough idea of what is the project "TRIBOSORT" about.

recycling    separate    prices    scrap    1950    skyrocketed    company    9001    250    worldwide    certificate    minimum    residue    certified    sorting    collecting    vehicles    annual    wo    5mt    countries    95    investment    companies    capacity    recycled       investing    waste    marketable    2015    final    6m    global    price    disposal    14001    china    selling    expensive    environmental    requirement    ca    5t    material    persons    solution    workshops    awarded    iso    electronic    provider    market    discharge    apr2    tribosort    a1    valuable    000m2    90    landfill    purity    sme    banned    electrical    recycle    manufacturers    109096    plastic    gt    mostly    producing    10    120    asia    rate    treatment    soon    negative    life    sending    3rd    options    pct    80    weee    least    employed    considerable    renown    thanks    patent    components    pay    dismantling    ultimate    prototype    50001    turnover    ton    delivered    322mt    handicapped    area    elv    pending    du    2010    constant    fee    15    5kt    first    industrial    approved    85    wastes    residues   

Project "TRIBOSORT" data sheet

The following table provides information about the project.

Coordinator
APR 2 - ATELIER PRO RESEAUX RECYCLAGE 

Organization address
address: RTE NATIONALE 13 VILLAGE ENTREPRISE -ZI
city: BONNIERES SUR SEINE
postcode: 78270
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country France [FR]
 Project website http://apr2-plast.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2017
 Duration (year-month-day) from 2017-12-01   to  2018-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    APR 2 - ATELIER PRO RESEAUX RECYCLAGE FR (BONNIERES SUR SEINE) coordinator 50˙000.00

Map

 Project objective

Plastic is today the 3rd material produced and global production has skyrocketed: from 1.5Mt in 1950 to 322Mt in 2015. But only 5% of worldwide produced plastic is today recycled, being one of the least recycled material. Plastic wastes that are not recycled are called Ultimate scrap residues and come mostly from End-of-life vehicles (ELV) and Waste Electrical and Electronic Equipment (WEEE). Today, companies producing Ultimate scrap residue have two options to discharge this waste: 1) Landfill disposal where they must pay a considerable fee (120€/t in 2015) with a strong environmental impact but this practice is expected to be soon banned in Europe; 2) selling and sending the wastes to Asia (mostly in China) at a price of 250€/ton but with the requirement of investing in expensive pre-treatment systems and with also negative environmental impact. Our TRIBOSORT technology is a unique solution that allows to 1) recycle all ultimate scrap residues from ELV and WEEE, 2) separate its valuable plastic components with a purity of 95% minimum, 3) provide an industrial scale solution with a production capacity of 1.5t/h, 4) produce a final recycled plastic material directly marketable to manufacturers, 5) provide a Recycle certificate along with our final products. APR2 is an experienced SME with 2.6M€ turnover and over 15 years in the plastic recycling market collecting, sorting and dismantling WEEE (over 5Kt treated every year) thanks to our 5,000m2 of exploitation area, 5 dismantling workshops, and 15 approved provider partners to recycle their wastes with recycling rate between 85 and 90%. APR2 has been awarded of many renown prices for its constant investment in R&D (10% annual du CA). Our first TRIBOSORT prototype design obtained a worldwide PCT Patent (WO 2010/109096 A1) and has been today delivered in 7 countries and pending in 2 further countries. We are certified “Adapted Company” (> of 80% handicapped persons employed), ISO 9001, 14001 and 50001.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "TRIBOSORT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "TRIBOSORT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

APA (2018)

Filter-less water-based Air Pollution Abatement system

Read More  

PAIR (2015)

Plasma active pollution control system

Read More  

MRP (2017)

autonomous Multi-electric Recycling Process line

Read More