Opendata, web and dolomites

i4Offshore SIGNED

Integrated Implementation of Industrial Innovations for Offshore Wind Cost Reduction

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 i4Offshore project word cloud

Explore the words cloud of the i4Offshore project. It provides you a very rough idea of what is the project "i4Offshore" about.

validated    farshore    i4offshore    implementing    safety    ennvironment    foundation    lcoe    solution    mitigation    decommissioning    efficient    components    faster    jacket    demonstration    drive    gravity    operation    phases    holistic    handling    solutions    size    viability    transportation    bottlenecks    leaner    enabled    full    construction    array    offshore    installed    cable    innovative    offfshore    leader    transport    modularized    vattenfall    reducing    special    gamesa    siemens    market    barriers    manufacturing    hybrid    consist    site    data    generation    direct    led    safeguarding    pipe    stages    wind    deepwater    featuring    onshore    technological    maintenance    material    combines    installation    class    highest    commercial    energy    turbine    whilst    mwh    paramount    logistics    standards    demonstrator    drawing    farm    2025    strategies    chain    validate    deep    proven    operated    sized    sites    health    break    consisting    gw   

Project "i4Offshore" data sheet

The following table provides information about the project.

Coordinator
SIEMENS GAMESA RENEWABLE ENERGY AS 

Organization address
address: BORUPVEJ 16
city: BRANDE
postcode: 7330
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Denmark [DK]
 Total cost 27˙122˙345 €
 EC max contribution 19˙877˙916 € (73%)
 Programme 1. H2020-EU.3.3.2. (Low-cost, low-carbon energy supply)
 Code Call H2020-LC-SC3-2018-RES-SingleStage
 Funding Scheme IA
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2023-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SIEMENS GAMESA RENEWABLE ENERGY AS DK (BRANDE) coordinator 5˙238˙086.00
2    UNIVERSAL FOUNDATION AS DK (FREDERICIA) participant 2˙127˙042.00
3    BLADT INDUSTRIES AS DK (AALBORG OST) participant 1˙891˙048.00
4    AALBORG UNIVERSITET DK (AALBORG) participant 1˙889˙863.00
5    PER AARSLEFF AS DK (VIBY J) participant 1˙559˙868.00
6    SALZGITTER AG DE (SALZGITTER) participant 1˙515˙122.00
7    WINDAR RENOVABLES SL ES (AVILES) participant 1˙434˙775.00
8    DR TECHN OLAV OLSEN AS NO (LYSAKER) participant 1˙142˙536.00
9    SINTEF OCEAN AS NO (TRONDHEIM) participant 779˙840.00
10    NKT GMBH & CO KG DE (COLOGNE) participant 708˙982.00
11    BUREAU VERITAS MARINE & OFFSHORE REGISTRE INTERNATIONAL DE CLASSIFICATION DE NAVIRES ET DE PLATEFORMES OFFSHORE FR (PUTEAUX) participant 402˙962.00
12    MAERSK BROKER KS DK (KOBENHAVN) participant 305˙512.00
13    DANMARKS TEKNISKE UNIVERSITET DK (KGS LYNGBY) participant 304˙545.00
14    DEUGRO DANMARK AS DK (HERNING) participant 300˙590.00
15    FRED. OLSEN OCEAN AS NO (OSLO) participant 277˙138.00

Map

 Project objective

Led by market leader Siemens Gamesa, drawing on best-in-class partners covering the full value chain of offshore wind energy, i4Offshore will demonstrate the break-down of cost-barriers of large-scale offshore developments. At a commercial, challenging, farshore, deepwater Vattenfall site, a highly innovative offshore system solution featuring a Siemens Gamesa next-generation direct drive wind turbine, a hybrid-material gravity jacket foundation that is optimised for low cost manufacturing, and new very-low-cost array cable-in-pipe solution will be installed and operated as a full size demonstrator during the project. The project is much more than a technology demonstration. i4Offshore combines the technological advances with deep but targeted study of holistic concepts for leaner manufacturing, onshore and offshore transport of components for full scale operation, innovative strategies for operation and maintenance as well as for offshore logistics and installation. The mitigation of bottlenecks in the value chain will be given special attention. Reduction of cost is the paramount concern across all stages of the offshore wind manufacturing, construction, installation, operation, maintenance and decommissioning process, whilst safeguarding the highest standards of health, safety and ennvironment. Enabled by the innovative concepts for manufacturing, logistics, installation, and O&M, validated data from the installed and operated wind turbine system will validate the commercial viability of implementing GW-sized offfshore wind farm consisting of the i4Offshore field-proven solution. The new offshore solution will consist of new, modularized components which allow leaner, faster, more reliable and much more cost-efficient logistics in the transportation, handling, installation and O&M phases of future commercial project development. i4Offshore will deliver innovative, reliable and robust solutions to reducing LCoE to 80€/MWh at highly challenging sites before 2025.

 Deliverables

List of deliverables.
Project website Websites, patent fillings, videos etc. 2019-10-08 11:23:02

Take a look to the deliverables list in detail:  detailed list of i4Offshore deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "I4OFFSHORE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "I4OFFSHORE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.2.)

PERCISTAND (2020)

Development of all thin-film PERovskite on CIS TANDem photovoltaics

Read More  

ARBAHEAT (2018)

Cost-effective transformation of a Highly-Efficient, Advanced, Thermal Ultra-SuperCritical coal-fired power plant into a CHP by retrofitting and integrating an ARBAFLAME biomass upgrading process.

Read More  

i4Offshore (2018)

Integrated Implementation of Industrial Innovations for Offshore Wind Cost Reduction

Read More