CLEANSKY-LBD

Adaptation of a generic wind tunnel model for attachment line transition measurements

 Coordinatore  

 Organization address address: KLAGENFURTER STRASSE 2
city: BREMEN
postcode: 28359

contact info
Titolo: Dr.
Nome: Andreas
Cognome: Stephen
Email: send email
Telefono: +49 421 21858017

 Nazionalità Coordinatore Non specificata
 Totale costo 298˙976 €
 EC contributo 224˙232 €
 Programma FP7-JTI
Specific Programme "Cooperation": Joint Technology Initiatives
 Code Call SP1-J
 Anno di inizio 2013
 Periodo (anno-mese-giorno) 2013-04-01   -   2014-10-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    BIAS - BREMER INSTITUT FUR ANGEWANDTE STRAHLTECHNIK GMBH

 Organization address address: KLAGENFURTER STRASSE 2
city: BREMEN
postcode: 28359

contact info
Titolo: Dr.
Nome: Andreas
Cognome: Stephen
Email: send email
Telefono: +49 421 21858017

DE (BREMEN) coordinator 224˙232.06

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

drilling    done    manufacturing    holes    tunnel    market    inserts    model    wind    suction    hole    integration    tests    flow    laser    significantly    insert   

 Obiettivo del progetto (Objective)

'The Hybrid Laminar Flow Technology for drag reduction needs small holes for boundary layer suction. This proposal addresses the perforation and integration of inserts for flow tunnel tests. Therefore, an approved laser process at BIAS for drilling suction holes for flow meters shall be transferred to an adequate system technology for large inserts using a short pulsed fibre laser with high power as recently available on the laser market. The process parameters must be adapted to the new system technology. This will be done by investigation of drilled hole geometries and tolerances using transmitted light microscopy with automated edge detection, which will be calibrated using prepared cross-sections of the holes. The efficient machining speed and fast analysis methods also enable to reconfigure an insert if the achieved results of the wind tunnel tests make this necessary. The following steps shall be done to investigate the production of wind tunnel inserts: Installation/configuration of the drilling system, process development for laser drilling, manufacturing of test specimen and hole analysis, upscaling of laser drilling procedure, manufacturing of 3 suction inserts, integration of suction inserts into model. Within this project the system technology and knowledge about the necessary drilling technology for inserts usable in flow tunnel tests is developed. Furthermore, the feasibility is proven in form of a full size model. This is a contribution to the targets of the CleanSky programme as the successful production of an insert for wind tunnel tests can significantly contribute to the technological breakthrough and shorten the time to market of the suction hole technology, thus contributing significantly to reducing the environmental footprint of aviation.'

Altri progetti dello stesso programma (FP7-JTI)

MATISSE (2014)

MAnufacTuring Improved Stack with textured Surface Electrodes for Stationary and CHP applications

Read More  

EASYPATCH (2010)

Prefabricated CFRP Parts

Read More  

E-SLEEVE (2012)

Direct filament wound rotor carbon resin sleeves by bulk curing and layer-by-layer Electron beam polymerisation

Read More