E-PRICE

Price-based Control of Electrical Power Systems

 Coordinatore TECHNISCHE UNIVERSITEIT EINDHOVEN 

 Organization address address: Den Dolech 2
city: EINDHOVEN
postcode: 5612 AZ

contact info
Titolo: Dr.
Nome: Suzanne ( S. )
Cognome: Udo
Email: send email
Telefono: +31 40 2475842
Fax: +31 40 2448375

 Nazionalità Coordinatore Netherlands [NL]
 Totale costo 3˙391˙011 €
 EC contributo 2˙448˙000 €
 Programma FP7-ICT
Specific Programme "Cooperation": Information and communication technologies
 Code Call FP7-ICT-2009-4
 Funding Scheme CP
 Anno di inizio 2010
 Periodo (anno-mese-giorno) 2010-02-01   -   2013-05-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    TECHNISCHE UNIVERSITEIT EINDHOVEN

 Organization address address: Den Dolech 2
city: EINDHOVEN
postcode: 5612 AZ

contact info
Titolo: Dr.
Nome: Suzanne ( S. )
Cognome: Udo
Email: send email
Telefono: +31 40 2475842
Fax: +31 40 2448375

NL (EINDHOVEN) coordinator 0.00
2    ABB SCHWEIZ AG

 Organization address address: Brown Boveri Strasse 6
city: BADEN
postcode: 5400

contact info
Titolo: Dr.
Nome: Andrew
Cognome: Paice
Email: send email
Telefono: +41 58 586 81 07
Fax: +41 58 586 73 65

CH (BADEN) participant 0.00
3    APX B.V.

 Organization address address: WTC, Strawinskylaan
city: Amsterdam
postcode: 1077 XX

contact info
Titolo: Mr.
Nome: Paul
Cognome: Boonekamp
Email: send email
Telefono: +31 20 3054000
Fax: +31 20 305 4001

NL (Amsterdam) participant 0.00
4    EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZURICH

 Organization address address: Raemistrasse
city: ZUERICH
postcode: 8092

contact info
Titolo: Prof.
Nome: Manfred
Cognome: MORARI
Email: send email
Telefono: +4144 632 7626
Fax: +4144 632 1211

CH (ZUERICH) participant 0.00
5    KEMA NEDERLAND BV

 Organization address address: Utrechtseweg 310
city: ARNHEM
postcode: 6812 AR

contact info
Titolo: Mr.
Nome: Wouter
Cognome: Boer, de
Email: send email
Telefono: 31263566291
Fax: 31263516034

NL (ARNHEM) participant 0.00
6    O.R.S. Operational Research Systems S.R.L.

 Organization address address: Piazza Prunotto Urbano
city: Alba
postcode: 12051

contact info
Titolo: Dr.
Nome: Pierluigi
Cognome: RIVA
Email: send email
Telefono: +39 0173 620201

IT (Alba) participant 0.00
7    SCUOLA IMT (ISTITUZIONI, MERCATI, TECNOLOGIE) ALTI STUDI DI LUCCA

 Organization address address: PIAZZA SAN PONZIANO
city: LUCCA
postcode: 55100

contact info
Titolo: Ms.
Nome: Manuela
Cognome: CORSINI
Email: send email
Telefono: +39 0583 4326 574
Fax: +39 0583 4326 565

IT (LUCCA) participant 0.00
8    Sveuciliste u Zagrebu, Fakultet strojarstva i brodogradnje

 Organization address address: Ivana Lucica
city: Zagreb
postcode: 10 000

contact info
Titolo: Dr.
Nome: Andrej
Cognome: Jokic
Email: send email
Telefono: +385 1 6168 434
Fax: +385 1 6168 351

HR (Zagreb) participant 0.00
9    TENNET TSO BV

 Organization address address: UTRECHTSEWEG
city: ARNHEM
postcode: 6812AR

contact info
Titolo: Mr.
Nome: Frank
Cognome: Nobel
Email: send email
Telefono: +31 26 373 1507
Fax: +31 26 373 1615

NL (ARNHEM) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

electric    ict    decisions    time    intelligent    producers    arrangements    framework    reserve    imbalance    consumers    incentives    real    power    economic    local    ancillary    predictable    net    hundreds    services   

 Obiettivo del progetto (Objective)

The EU electric power system experiences a fundamental change in the quasi-monopolistic, top-down oriented, stable, and reasonable predictable arrangements of the past. It now spans continents, has hundreds of millions consumers and hundreds of thousands of producers, from nuclear power plants to privately-owned and operated badly predictable renewables such as solar cells, wind and microturbines and operates in an increasingly liberalized market. These developments pose huge challenges for its reliable and economic operation. This proposal focuses on the real-time power imbalance in the power net, which arises as a consequence of errors in the prediction of both production and demand. As this power imbalance will increase both in size and in frequency, presents arrangements to cope with this imbalance are no longer valid. They are neither reliable nor economic anymore. This project proposes an advanced ICT and control framework for ancillary services (reserve capacity) which allows a more intelligent solution by giving consumers and producers clear, real-time financial incentives to adapt their consumption/production according to the actual needs of the power system. This design is based on a distributed control structure, enabled by a fast ICT infrastructure and advanced control theory to reliably and economically deal with the necessary ancillary services. Decisions by consumers, producers, power exchanges and TSOs can be taken locally, based on local or national preferences and regulation. Still, the embedded incentives of the proposed framework can guarantee that all these local decisions together contribute to the global objectives of the EE power net: a reliable electric energy supply at the lowest costs.nInstead of investing in additional expensive and environment-unfriendly reserve production or storage facilities with a low utilization rate, the reliability and economy are enforced by intelligent ICT and control.

Altri progetti dello stesso programma (FP7-ICT)

ISS-EWATUS (2014)

Integrated Support System for Efficient Water Usage and Resources Management

Read More  

E-GREENWATER (2012)

Electrolytic Water Disinfection and Recycling System in Greenhouses for Water and Fertiliser Saving and Better Hygienic Security

Read More  

ICT-ENSURE (2008)

European ICT environmental sustainability research

Read More