Opendata, web and dolomites

Mucky

MUCKY: The circular solution for the valorisation of mixed municipal waste streams.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Mucky project word cloud

Explore the words cloud of the Mucky project. It provides you a very rough idea of what is the project "Mucky" about.

cracking    incinerated    landfills    25    incineration    treatment    linear    energy    manufacturing    final    return    mucky    municipal    conversion    ratio    solving    50    ton    roughly    executing    market    51    reactor    streams    dry    locations    companies    bi    thermal    quality    total    intensive    chemical    giving    resource    obtaining    economic    gives    reducing    private    added    mixed    solution    installations    2020    mws    time    viability    roadmap    instead    convincing    recyclable    accepted    industry    depends    49    hydrocarbons    installation    upgrading    dimensioned    certification    solid    public    500    writing    ambition    feasibility    uniquely    atoms    turning    investment    chain    consists    syngas    demonstrations    starting    demonstration    55    mton    dumped    valuable    day    hurdles    landfilling    introduction    carbon    least    proving    units    waste    deteriorated    minerals    250    representative    establishing    outperforms    competent    innovation    pyrolysis   

Project "Mucky" data sheet

The following table provides information about the project.

Coordinator
BI-ENERGY BV 

Organization address
address: JAC P THIJSSELAAN 68
city: OEGSTGEEST
postcode: 2341 PD
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Netherlands [NL]
 Project website http://www.bi-energy.nl/595/mucky.html
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2015
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-07-01   to  2015-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    BI-ENERGY BV NL (OEGSTGEEST) coordinator 50˙000.00

Map

 Project objective

In Europe, each year 250 Mton municipal waste streams (MWS) are produced of which about 55% is non-recyclable and currently dumped on landfills or incinerated. Current state of the art does not offer a solution for upgrading this deteriorated, low quality mixed waste streams without the need of intensive (pre)treatment.

The main objective of the overall innovation project is to provide a technical solution, the Mucky, for turning mixed MWS into valuable linear hydrocarbons as a new resource for the chemical industry. The Mucky is not based on pyrolysis. Instead the uniquely dimensioned reactor of the Mucky allows controlled thermal cracking of the mixed waste into linear hydrocarbons up to 20 carbon atoms, giving syngas and solid minerals as side-products in a ratio of roughly 50 : 49 : 1. Landfilling of MWS gives a loss and incineration gives a value return of at best € 25/ton. The Mucky outperforms this by far, leading to an added value of around € 90/ton.

The key market for the Mucky consists of all public and private municipal waste chain companies in Europe. The long term ambition of Bi-Energy is the conversion by Mucky of at least 50% of all carbon based, non-recyclable MWS, starting with the introduction of 100 Mucky installations in Europe before 2020. The total potential market consists of 51,500 Mucky units, each processing 2.5 ton of dry waste a day.

In this feasibility assessment the final hurdles will be taken towards an Europe wide market introduction supported by convincing demonstrations of the Mucky installation at 10 representative locations. The final hurdles for establishing technical feasibility are obtaining an EU wide accepted certification and reducing manufacturing time and cost of the Mucky. The economic viability depends on solving legal issues, proving a favourable return on investment, creating a competent consortium for executing the Europe wide demonstration project, and writing a strong market implementation roadmap.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "MUCKY" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "MUCKY" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

EPIC (2017)

Environmentally Friendly Recycled Plastic Floors in Containers

Read More  

MRP (2017)

autonomous Multi-electric Recycling Process line

Read More  

ProTreaT (2015)

FEASIBILITY ASSESSMENT OF THE GREEN “ProTreaT” TECHNOLOGY FOR PROTEIN-BASED, NATURAL REMOVAL OF HEAVY METALS FROM WATER AND WASTEWATER

Read More