INcreasing Safety in NPPs by Covering gaps in Environmental Fatigue Assessment

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 INCEFA - PLUS project word cloud

Explore the words cloud of the INCEFA - PLUS project. It provides you a very rough idea of what is the project "INCEFA - PLUS" about.

nrc    time    plus    data    nuclear    fatigue    assurance    operation    safety    experimental    incefa    strain    gaps    material    hold    mean    environmental   

Project "INCEFA - PLUS" data sheet

The following table provides information about the project.

Coordinator
AMEC FOSTER WHEELER NUCLEAR UK LIMITED 

Organization address
address: Chelford Road, Booths Park
city: KNUTSFORD
postcode: WA16 8QZ
website: www.amec.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Total cost 6˙140˙668 €
 EC max contribution 2˙550˙128 € (42%)
 Programme 1. H2020-Euratom-1.8. (Ensure availability and use of research infrastructures of pan_european relevance)
2. H2020-Euratom-1.3. (Support the development and sustainability of nuclear competences at Union level)
3. H2020-Euratom-1.1. (Support safe operation of nuclear systems)
 Code Call NFRP-2014-2015
 Funding Scheme /RIA
 Starting year 2015
 Duration (year-month-day) from 2015-07-01   to  2020-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    AMEC FOSTER WHEELER NUCLEAR UK LIMITED UK (KNUTSFORD) coordinator 481˙324.00
2    ELECTRICITE DE FRANCE FR (PARIS 08) participant 395˙770.00
3    Studiecentrum voor Kernenergie/Centre d'Etude de l'Energie Nucléaire BE (BRUXELLES) participant 332˙397.00
4    JRC -JOINT RESEARCH CENTRE- EUROPEAN COMMISSION BE (BRUSSELS) participant 326˙806.00
5    UNIVERSIDAD DE CANTABRIA ES (SANTANDER) participant 198˙125.00
6    INESCO INGENIEROS SL ES (SANTANDER) participant 148˙681.00
7    PAUL SCHERRER INSTITUT CH (VILLIGEN PSI) participant 125˙000.00
8    Teknologian tutkimuskeskus VTT Oy FI (Espoo) participant 119˙550.00
9    CENTRO DE INVESTIGACIONES ENERGETICAS, MEDIOAMBIENTALES Y TECNOLOGICAS-CIEMAT ES (MADRID) participant 100˙000.00
10    INSTITUT DE RADIOPROTECTION ET DE SURETE NUCLEAIRE FR (FONTENAY AUX ROSES) participant 85˙050.00
11    AREVA NP SAS FR (COURBEVOIE) participant 82˙500.00
12    UJV REZ, a. s. CZ (HUSINEC) participant 74˙662.00
13    LIETUVOS ENERGETIKOS INSTITUTAS LT (KAUNAS) participant 41˙263.00
14    COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES FR (PARIS 15) participant 39˙000.00
15    PREUSSENELEKTRA GMBH DE (HANNOVER) participant 0.00
16    ROLLS-ROYCE POWER ENGINEERING PLC UK (DERBY) participant 0.00

Mappa

 Project objective

INCEFA-PLUS delivers new experimental data and new guidelines for assessment of environmental fatigue damage to ensure safe operation of European nuclear power plants.

Austenitic stainless steels will be tested for the effects of mean strain, hold time and material roughness on fatigue endurance. Testing will be in nuclear Light Water Reactor environments. The three experimental parameters were selected in the framework of an in-kind project during which the current state of the art for this technical area was developed. The data obtained will be collected and standardised in an online fatigue database with the objective of organising a CEN workshop on this aspect.

The gaps in available fatigue data lead to uncertainty in current assessments. The gaps, will be targeted so that fatigue assessment procedures can address behaviour under conditions closer to normal plant operation than is currently possible. Increased safety can thus be assured.

INCEFA-PLUS also develops and disseminates a modified procedure for estimating environmental fatigue degradation. This will take better account of the effects of mean strain, hold time and surface finish. This will enable better management of nuclear components, making possible the long term operation (LTO) of NPPs under safer conditions.

INCEFA-PLUS is relevant to the NFRP1-2014 programme because:

• Present guidance originates from NRC. In Europe various national programmes aim to develop counter proposals allowing greater operational efficiency with at least comparable safety assurance. INCEFA-PLUS brings these programmes together through which a strong EU response to the NRC methodology will be obtained with improved safety assurance through increased lifetime assessment reliability. • INCEFA-PLUS improves comparability of data from EU programmes because partner laboratories will do some tests on a common material under common conditions. Reduced assessment uncertainty will enable easier maintenance of safety

 Work performed, outcomes and results:  advancements report(s) 

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "INCEFA - PLUS" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "INCEFA - PLUS" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1.)

INCEFA - PLUS (2015)

INcreasing Safety in NPPs by Covering gaps in Environmental Fatigue Assessment

Read More  

SESAME (2015)

thermal hydraulics Simulations and Experiments for the Safety Assessment of MEtal cooled reactors

Read More  

SOTERIA (2015)

Safe long term operation of light water reactors based on improved understanding of radiation effects in nuclear structural materials

Read More