Opendata, web and dolomites

16gAirTest-Phase2 SIGNED

Innovative EASA certified dynamic test method for 16g aircraft seat cushions

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 16gAirTest-Phase2 project word cloud

Explore the words cloud of the 16gAirTest-Phase2 project. It provides you a very rough idea of what is the project "16gAirTest-Phase2" about.

designed    market    fuel    monolithic    extremely    double    fact    found    sell    facto    deadlock    back    comfort    extend    certification    seats    save    scenario    chain    certifies    airplane    de    10    backs    20    commercialize    supportive    approved    ros    72    hard    safety    delay    cushion    alternative    unsafe    certified    cushions    models    tests    16g    too    smes    lower    sme    legs    authorized    160    company    share    competitor    airlines    supply    original    approval    600    co2    passenger    overcome    multilayer    travel    expensive    did    happens    aviation    times    crash    independently    seat    manufacturers    240    price    faa    pax    worn    replaced    easa    turnover    safe    business    300    competitive    tas    grace    replacement    lightweight    action    comfortable    aero    weight    sale    obtain    testori    passengers       intends    impacts    feasibility    2020    replacements    outlined    uncomfortable    roi    emissions    oem   

Project "16gAirTest-Phase2" data sheet

The following table provides information about the project.

Coordinator
TESTORI AERO SUPPLY SRL 

Organization address
address: VIA FRANCESCO PETRARCA 22
city: MILANO
postcode: 20123
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.testori.aero
 Total cost 1˙845˙893 €
 EC max contribution 1˙280˙925 € (69%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2015
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-01-01   to  2018-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    TESTORI AERO SUPPLY SRL IT (MILANO) coordinator 1˙280˙925.00

Map

 Project objective

Airplane seat cushions are designed to be safe, comfortable, supportive for passengers' legs and backs, and lightweight to save fuel and CO2 emissions. But how many times did you experience worn out, uncomfortable cushions, too hard on legs and back? This happens because seat cushions should be replaced every 4-5 years, to maintain their safety and comfort characteristics. But cushions replacement is expensive: a cushions set may cost 600 € and, when original replacements are no more in production the whole seat must be replaced (~1.300 €/pax). In fact cushions need to be certified along with the seat, through expensive crash tests. So airlines delay cushions replacements and passengers travel on unsafe and uncomfortable seats. Testori Aero Supply (TAS) has found a way to overcome this deadlock: it has developed a test method for 16g monolithic models that certifies cushions only, independently from the crash test on the whole seat. This method has been approved by European Aviation Safety Authority (EASA). TAS is the unique company able to sell alternative 16g certified monolithic cushions, at an extremely competitive price (160 €/pax). This project intends to extend this certification method (and obtain EASA/FAA approval) to a new type of airplane cushions, the 16g multilayer, that have been recently introduced in the market by Original Manufacturers (OEM) to increase passenger's comfort and lower weight. Grace to this method TAS will produce and commercialize certified 16g multilayer cushion replacements, at an average sale price of 240 €/pax, thus becoming de-facto the only authorized competitor of OEM. The feasibility study conducted in SME action Phase 1 has assessed the project feasibility, costs and impacts on the company and on other SMEs of the production chain, and has outlined a business scenario where TAS will more than double its turnover by 2020 (160%), increase market share by 10%, and achieve 20% ROS and 72% ROI.

 Deliverables

List of deliverables.
EASA approval Websites, patent fillings, videos etc. 2020-04-23 02:42:39
Communication materials Documents, reports 2020-04-23 02:42:39
Web site Websites, patent fillings, videos etc. 2020-04-23 02:42:39
Quality Plan and Risk assessment Documents, reports 2020-04-23 02:42:39

Take a look to the deliverables list in detail:  detailed list of 16gAirTest-Phase2 deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "16GAIRTEST-PHASE2" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "16GAIRTEST-PHASE2" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More  

SIADE (2014)

Spatial Decision Support System for Transportation Planning

Read More