Opendata, web and dolomites

ELSi SIGNED

Industrial scale recovery and reuse of all materials from end of life silicon-based photovoltaic modules

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 ELSi project word cloud

Explore the words cloud of the ELSi project. It provides you a very rough idea of what is the project "ELSi" about.

purity    industrially    months    economically    rtd    publications    contracts    silicon    dissolution    big    logistic    procurement    disposed    outbound    twelve    copper    aluminum    mt    place    contained    oriented    recover    put    geltz    demonstrating    winning    request    business    association    transportation    reaching    raw    first    1000    patented    economic    plan    supplies    couple    pv    environmental    industrial    decades    chemical    95    gold    last    separation    conferences    silver    sales    waste    journals    actions    tin    fraunhofer    validate    complete    solartys    presentations    returning    electrically    showing    recycling    besides    recovery    combined    demonstration    plants    post    life    site    supply    mechanical    glass    photovoltaic    elsi    communication    enormous    electrolytic    prior    revatech    commercialisation    visits    logistics    materials    worked    web    realised    market    marketing    eol    modules    operation    variata   

Project "ELSi" data sheet

The following table provides information about the project.

Coordinator
GELTZ UMWELTTECHNOLOGIE GMBH 

Organization address
address: KERSCHENSTEINERSTRASSE 6
city: MUHLACKER
postcode: 75417
website: http://www.geltz.de/

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Germany [DE]
 Project website http://elsi-pv-recycling.eu/
 Total cost 3˙248˙338 €
 EC max contribution 2˙529˙607 € (78%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2. (PRIORITY 'Industrial leadership')
 Code Call H2020-FTIPilot-2015-1
 Funding Scheme IA
 Starting year 2016
 Duration (year-month-day) from 2016-05-01   to  2018-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    GELTZ UMWELTTECHNOLOGIE GMBH DE (MUHLACKER) coordinator 1˙104˙250.00
2    FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. DE (MUNCHEN) participant 748˙816.00
3    VARIATA DORIT LANG GMBH & COKG DE (MUHLACKER) participant 367˙165.00
4    RECYCLAGE ET VALORISATION TECHNIQUE BE (ENGIS) participant 205˙625.00
5    ASOCIATION ESPANOLA PARA LA INTERNACIONALIZACION Y LA INNOVACION DE LAS EMPRESAS SOLARES - SOLARTYS ES (BARCELONA) participant 103˙750.00

Map

 Project objective

This ElSi project will demonstrate and validate a complete recycling system for end of life (eol) photovoltaic (PV) modules. During the last three decades PV systems have been deployed throughout Europe showing enormous growth. Early systems are now reaching end of life and have to be disposed after returning. Facing this increasing environmental challenge three industrial partners, Geltz, Variata and Revatech identified the big economic potential of raw materials contained in eol PV modules. Prior to this request for funding they have developed a patented technology to recover about 95% of silicon, high purity glass, aluminum, copper, silver, gold, tin and lead from eol modules. Together with Solartys, industrial association, and Fraunhofer as RTD partner this will all be realised by demonstrating the technology involving mechanical and electrolytic based processes at an industrially relevant scale (1000 mt/a). Mechanical separation processes, chemical dissolution and electrically driven separation and winning will be combined in a new way enabling economically viable recovery. Besides these technical tasks there will be a couple of logistic aspects to be worked on including procurement, transportation and outbound logistics. It will be important to ensure that supplies of eol PV modules are available for post project operation of the ELSi plants and thus supply contracts will be put in place during the life of this project. Various marketing and communication activities will be carried out like visits at the demonstration site, publications in user-oriented recycling and waste journals, presentations at conferences and various web-based dissemination actions. During the whole project a focus will be on the commercialisation of the ELSi PV recycling system. Therefore the consortium will further assess the market and work out an advanced business plan to ensure market take-up by the end of the project and first sales within twelve months post project.

 Deliverables

List of deliverables.
Project Website Websites, patent fillings, videos etc. 2019-05-30 15:07:58

Take a look to the deliverables list in detail:  detailed list of ELSi deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ELSI" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "ELSI" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.)

Innovation Principle (2019)

Developing an Innovation-Friendly Legislative Culture – the Innovation Principle at Work

Read More  

PULSe (2017)

Pervasive Ubiquitous Lightwave SEnsor

Read More  

Intel-Line (2016)

An intelligent inspection system for improved and efficient power line cable maintenance

Read More