Opendata, web and dolomites

ELSi SIGNED

Industrial scale recovery and reuse of all materials from end of life silicon-based photovoltaic modules

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 ELSi project word cloud

Explore the words cloud of the ELSi project. It provides you a very rough idea of what is the project "ELSi" about.

web    demonstration    1000    tin    procurement    gold    photovoltaic    oriented    logistic    chemical    separation    besides    publications    communication    environmental    modules    combined    post    recover    patented    economic    supplies    recycling    economically    plants    visits    commercialisation    realised    dissolution    conferences    industrial    association    complete    variata    put    outbound    marketing    materials    contracts    enormous    raw    industrially    business    demonstrating    revatech    couple    95    market    mt    copper    returning    disposed    first    logistics    aluminum    fraunhofer    transportation    electrolytic    purity    big    validate    journals    place    geltz    waste    silicon    eol    contained    supply    last    elsi    winning    twelve    solartys    decades    electrically    pv    plan    recovery    glass    worked    reaching    prior    site    months    presentations    request    operation    silver    life    mechanical    actions    showing    sales    rtd   

Project "ELSi" data sheet

The following table provides information about the project.

Coordinator
GELTZ UMWELTTECHNOLOGIE GMBH 

Organization address
address: KERSCHENSTEINERSTRASSE 6
city: MUHLACKER
postcode: 75417
website: http://www.geltz.de/

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Germany [DE]
 Project website http://elsi-pv-recycling.eu/
 Total cost 3˙248˙338 €
 EC max contribution 2˙529˙607 € (78%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2. (PRIORITY 'Industrial leadership')
 Code Call H2020-FTIPilot-2015-1
 Funding Scheme IA
 Starting year 2016
 Duration (year-month-day) from 2016-05-01   to  2018-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    GELTZ UMWELTTECHNOLOGIE GMBH DE (MUHLACKER) coordinator 1˙104˙250.00
2    FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. DE (MUNCHEN) participant 748˙816.00
3    VARIATA DORIT LANG GMBH & COKG DE (MUHLACKER) participant 367˙165.00
4    RECYCLAGE ET VALORISATION TECHNIQUE BE (ENGIS) participant 205˙625.00
5    ASOCIATION ESPANOLA PARA LA INTERNACIONALIZACION Y LA INNOVACION DE LAS EMPRESAS SOLARES - SOLARTYS ES (BARCELONA) participant 103˙750.00

Map

 Project objective

This ElSi project will demonstrate and validate a complete recycling system for end of life (eol) photovoltaic (PV) modules. During the last three decades PV systems have been deployed throughout Europe showing enormous growth. Early systems are now reaching end of life and have to be disposed after returning. Facing this increasing environmental challenge three industrial partners, Geltz, Variata and Revatech identified the big economic potential of raw materials contained in eol PV modules. Prior to this request for funding they have developed a patented technology to recover about 95% of silicon, high purity glass, aluminum, copper, silver, gold, tin and lead from eol modules. Together with Solartys, industrial association, and Fraunhofer as RTD partner this will all be realised by demonstrating the technology involving mechanical and electrolytic based processes at an industrially relevant scale (1000 mt/a). Mechanical separation processes, chemical dissolution and electrically driven separation and winning will be combined in a new way enabling economically viable recovery. Besides these technical tasks there will be a couple of logistic aspects to be worked on including procurement, transportation and outbound logistics. It will be important to ensure that supplies of eol PV modules are available for post project operation of the ELSi plants and thus supply contracts will be put in place during the life of this project. Various marketing and communication activities will be carried out like visits at the demonstration site, publications in user-oriented recycling and waste journals, presentations at conferences and various web-based dissemination actions. During the whole project a focus will be on the commercialisation of the ELSi PV recycling system. Therefore the consortium will further assess the market and work out an advanced business plan to ensure market take-up by the end of the project and first sales within twelve months post project.

 Deliverables

List of deliverables.
Project Website Websites, patent fillings, videos etc. 2019-05-30 15:07:58

Take a look to the deliverables list in detail:  detailed list of ELSi deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "ELSI" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "ELSI" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.)

Innovation Principle (2019)

Developing an Innovation-Friendly Legislative Culture – the Innovation Principle at Work

Read More  

PULSe (2017)

Pervasive Ubiquitous Lightwave SEnsor

Read More  

DynaHUBS (2016)

DynaHUBs is a new application designed to kick start the development of the Physical Internet using a crowd-sourced approach

Read More