Opendata, web and dolomites

DiGas Dual fuel

A novel dual fuel system for diesel locomotive modernisation to CNG or LNG operation

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 DiGas Dual fuel project word cloud

Explore the words cloud of the DiGas Dual fuel project. It provides you a very rough idea of what is the project "DiGas Dual fuel" about.

countries    strengthen    strives    methane    railroads    either    oil    rolling    environmental    cng    solid    cat    delivering    substitution    piloting    investors    compressed    global    company    lines    rollout    decrease    stock    liquefied    fuel    scalable    proprietary    innovation    adoption    form    off    hold    commercialization    rest    alternative    world    cleaner    companies    comply    certification    trucks    installable    sustainable    commercially    exhaust    times    locomotive    periods    multiple    hurdles    switching    eur    digas    80    lagging    attractive    market    homologation    transition    dual    business    few    government    bio    tougher    game    500k    smaller    cheaper    designed    diesel    minimum    accelerate    transport    rate    retrofit    seized    gen    lng    time    feasibility    markets    shunter    payback    trl    rail    ge    shipping    emd    advantage    customer    routes    risks    haul    standards    competing    changing    opportunity    combined    operators    plan    strategy    kick   

Project "DiGas Dual fuel" data sheet

The following table provides information about the project.

Coordinator
SABIEDRIBA AR IEROBEZOTU ATBILDIBU DIGAS 

Organization address
address: TALSU SOSEJA 31 K-17-34
city: JURMALA
postcode: 2016
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Latvia [LV]
 Project website http://www.digasgroup.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2016
 Duration (year-month-day) from 2016-12-01   to  2017-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SABIEDRIBA AR IEROBEZOTU ATBILDIBU DIGAS LV (JURMALA) coordinator 50˙000.00

Map

 Project objective

Company is developing proprietary state-of-the-art dual fuel technology and has designed low-cost, scalable, installable at minimum cost and lead time dual fuel system tailored for locomotive sector. The project will accelerate diesel locomotive market transition from oil based diesel fuel to cheaper, cleaner and much more sustainable alternative and bio fuel - methane either in form of Liquefied (LNG) or Compressed (CNG) methane. Switching the fuel enables locomotive sector to strengthen the advantage railroads hold over trucks in long-haul shipping, comply with tougher environmental and exhaust standards and decrease fuel costs in the same time. In recent years methane is getting a high attention from transport companies, investors, and government in rail sector with US leading the market development. Opportunity is being seized by GE, CAT, EMD and few smaller companies by piloting and testing their dual fuel products. EU is clearly lagging the rest of the world in the adoption of methane as the next gen fuel for locomotive applications. Being European company DiGas is bringing to market dual fuel product dedicated for locomotive sector out competing all similar products on a global scale. With today’s average cost of locomotive dual fuel retrofit 500k EUR, the proprietary game changing innovation enables multiple times decrease of locomotive retrofit costs combined with high diesel fuel substitution rate (60-80%) of the system allowing for commercially attractive payback periods (4 y for shunter and 2 y for main-lines) for rail operators. In project Phase 1 DiGas strives to investigate project risks and potential hurdles of the product commercialization kick-off in Phase 2, for example certification and homologation routes, rail rolling stock and customer for various countries as well as commercialization path for various markets delivering a solid business plan. Based on feasibility study, a strategy TRL raise from 6 to 9 and market-rollout will be defined.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "DIGAS DUAL FUEL" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "DIGAS DUAL FUEL" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

ELEONE (2016)

New advanced sensor for automated metrology

Read More  

Ellum AC System (2018)

An advanced air conditioning system for Electric Vehicles

Read More  

DTD SYSTEM 2 (2017)

A disruptive innovation for the minisation of railway mantenance costs

Read More