Opendata, web and dolomites

DiGas Dual fuel

A novel dual fuel system for diesel locomotive modernisation to CNG or LNG operation

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 DiGas Dual fuel project word cloud

Explore the words cloud of the DiGas Dual fuel project. It provides you a very rough idea of what is the project "DiGas Dual fuel" about.

routes    adoption    alternative    digas    homologation    haul    lng    combined    commercially    fuel    operators    eur    kick    railroads    countries    trl    times    diesel    80    game    transport    companies    cheaper    customer    accelerate    environmental    strengthen    ge    exhaust    liquefied    business    form    global    markets    government    proprietary    company    transition    rest    payback    opportunity    cng    solid    emd    world    lagging    either    few    lines    trucks    strategy    shipping    smaller    methane    rail    shunter    attractive    scalable    compressed    standards    competing    innovation    strives    500k    cat    feasibility    hold    market    stock    cleaner    periods    rolling    comply    changing    retrofit    investors    tougher    locomotive    installable    decrease    time    rate    dual    oil    bio    certification    sustainable    risks    advantage    off    multiple    gen    rollout    piloting    plan    switching    commercialization    designed    seized    hurdles    delivering    substitution    minimum   

Project "DiGas Dual fuel" data sheet

The following table provides information about the project.

Coordinator
SABIEDRIBA AR IEROBEZOTU ATBILDIBU DIGAS 

Organization address
address: TALSU SOSEJA 31 K-17-34
city: JURMALA
postcode: 2016
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Latvia [LV]
 Project website http://www.digasgroup.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2016
 Duration (year-month-day) from 2016-12-01   to  2017-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SABIEDRIBA AR IEROBEZOTU ATBILDIBU DIGAS LV (JURMALA) coordinator 50˙000.00

Map

 Project objective

Company is developing proprietary state-of-the-art dual fuel technology and has designed low-cost, scalable, installable at minimum cost and lead time dual fuel system tailored for locomotive sector. The project will accelerate diesel locomotive market transition from oil based diesel fuel to cheaper, cleaner and much more sustainable alternative and bio fuel - methane either in form of Liquefied (LNG) or Compressed (CNG) methane. Switching the fuel enables locomotive sector to strengthen the advantage railroads hold over trucks in long-haul shipping, comply with tougher environmental and exhaust standards and decrease fuel costs in the same time. In recent years methane is getting a high attention from transport companies, investors, and government in rail sector with US leading the market development. Opportunity is being seized by GE, CAT, EMD and few smaller companies by piloting and testing their dual fuel products. EU is clearly lagging the rest of the world in the adoption of methane as the next gen fuel for locomotive applications. Being European company DiGas is bringing to market dual fuel product dedicated for locomotive sector out competing all similar products on a global scale. With today’s average cost of locomotive dual fuel retrofit 500k EUR, the proprietary game changing innovation enables multiple times decrease of locomotive retrofit costs combined with high diesel fuel substitution rate (60-80%) of the system allowing for commercially attractive payback periods (4 y for shunter and 2 y for main-lines) for rail operators. In project Phase 1 DiGas strives to investigate project risks and potential hurdles of the product commercialization kick-off in Phase 2, for example certification and homologation routes, rail rolling stock and customer for various countries as well as commercialization path for various markets delivering a solid business plan. Based on feasibility study, a strategy TRL raise from 6 to 9 and market-rollout will be defined.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "DIGAS DUAL FUEL" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "DIGAS DUAL FUEL" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Ellum AC System (2018)

An advanced air conditioning system for Electric Vehicles

Read More  

K.A.R.S. (2017)

ANTIROTATION SYSTEM FOR HELIRESCUE

Read More  

Blinkers (2018)

Next generation bicycle lights. Be visible, understood and expected by other vehicles, whatever the weather, angle and situation.

Read More