Opendata, web and dolomites

DiGas Dual fuel

A novel dual fuel system for diesel locomotive modernisation to CNG or LNG operation

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 DiGas Dual fuel project word cloud

Explore the words cloud of the DiGas Dual fuel project. It provides you a very rough idea of what is the project "DiGas Dual fuel" about.

advantage    company    oil    market    business    countries    locomotive    minimum    lagging    diesel    smaller    rest    operators    customer    scalable    switching    piloting    combined    bio    time    competing    game    multiple    environmental    government    feasibility    plan    trucks    opportunity    liquefied    attractive    500k    cleaner    retrofit    times    cng    rate    fuel    world    proprietary    risks    substitution    hurdles    routes    shunter    railroads    markets    seized    solid    decrease    strategy    rolling    delivering    exhaust    accelerate    strengthen    form    comply    cat    few    off    trl    emd    alternative    stock    either    periods    adoption    gen    commercialization    hold    global    eur    lines    rollout    standards    sustainable    dual    methane    certification    homologation    digas    haul    strives    transition    tougher    lng    installable    compressed    rail    companies    ge    transport    commercially    80    innovation    designed    kick    changing    payback    investors    shipping    cheaper   

Project "DiGas Dual fuel" data sheet

The following table provides information about the project.

Coordinator
SABIEDRIBA AR IEROBEZOTU ATBILDIBU DIGAS 

Organization address
address: TALSU SOSEJA 31 K-17-34
city: JURMALA
postcode: 2016
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Latvia [LV]
 Project website http://www.digasgroup.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2016
 Duration (year-month-day) from 2016-12-01   to  2017-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SABIEDRIBA AR IEROBEZOTU ATBILDIBU DIGAS LV (JURMALA) coordinator 50˙000.00

Map

Leaflet | Map data © OpenStreetMap contributors, CC-BY-SA, Imagery © Mapbox

 Project objective

Company is developing proprietary state-of-the-art dual fuel technology and has designed low-cost, scalable, installable at minimum cost and lead time dual fuel system tailored for locomotive sector. The project will accelerate diesel locomotive market transition from oil based diesel fuel to cheaper, cleaner and much more sustainable alternative and bio fuel - methane either in form of Liquefied (LNG) or Compressed (CNG) methane. Switching the fuel enables locomotive sector to strengthen the advantage railroads hold over trucks in long-haul shipping, comply with tougher environmental and exhaust standards and decrease fuel costs in the same time. In recent years methane is getting a high attention from transport companies, investors, and government in rail sector with US leading the market development. Opportunity is being seized by GE, CAT, EMD and few smaller companies by piloting and testing their dual fuel products. EU is clearly lagging the rest of the world in the adoption of methane as the next gen fuel for locomotive applications. Being European company DiGas is bringing to market dual fuel product dedicated for locomotive sector out competing all similar products on a global scale. With today’s average cost of locomotive dual fuel retrofit 500k EUR, the proprietary game changing innovation enables multiple times decrease of locomotive retrofit costs combined with high diesel fuel substitution rate (60-80%) of the system allowing for commercially attractive payback periods (4 y for shunter and 2 y for main-lines) for rail operators. In project Phase 1 DiGas strives to investigate project risks and potential hurdles of the product commercialization kick-off in Phase 2, for example certification and homologation routes, rail rolling stock and customer for various countries as well as commercialization path for various markets delivering a solid business plan. Based on feasibility study, a strategy TRL raise from 6 to 9 and market-rollout will be defined.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "DIGAS DUAL FUEL" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "DIGAS DUAL FUEL" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

WOOLF (2017)

An advanced and wearable solution to increase motorcyclists’ safety

Read More  

SIRENA (2018)

Novel electric stair climber to break barriers in transport of disabled people and goods through a safe, quick and comfortable movement

Read More  

ChargeAtHome (2017)

CHARGE@HOME: A SOFTWARE THAT ENABLES FAST CHARGING SERVICES FOR ELECTRIC VEHICLES AT HOME

Read More