Opendata, web and dolomites

GRAILS-SWE

Greater RAIL Safety using the Smart Washer Ecosystem

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 GRAILS-SWE project word cloud

Explore the words cloud of the GRAILS-SWE project. It provides you a very rough idea of what is the project "GRAILS-SWE" about.

guided    period    comprise    2017    mechanical    sensors    kilos    31    2016    geometry    2010       fastenings    rail    delays    force    railroad    remote    ecosystem    fed    intelligent    offers    network    reliability    voids    washer    travelled    installations    bed    inclination    multitude    500    scf    maintenance    proprietary    responsible    alone    2005    2014    fastening    track    full       interfaces    server    cloud    worth    infrastructure    minutes    381    technologies    globally    sct    data    gives    21    derailments    points    combined    billion    cbm    movement    conservative    vital    time    market    trains    cumulative    platform    rcm    dcu    sales    networks    monitor    switch    entire    freight    asset    point    solutions    stability    smart    passenger    tonne    connected    critical    software    6th    integrity    monitoring    roi    service    uk    million    eur    sw3    occurred    installation    600    km    77    containing    clamp    2015    remotely    280    implementing    tracks    owners    assets    signalling    audit    crossing    solution    controller    capacity   

Project "GRAILS-SWE" data sheet

The following table provides information about the project.

Coordinator
SMART COMPONENT TECHNOLOGIES LIMITED 

Organization address
address: OLYMPUS PARK, QUEDGELEY
city: GLOUCESTER
postcode: GL2 4NF
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.smartcomptech.com
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2017
 Duration (year-month-day) from 2017-01-01   to  2017-09-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SMART COMPONENT TECHNOLOGIES LIMITED UK (GLOUCESTER) coordinator 50˙000.00

Map

 Project objective

9% of all EU freight (280 billion tonne-kilos) & 381 billion passenger km were travelled on EU rail networks in 2014. A railroad switch & crossing (point) is a mechanical installation enabling trains to be guided from one track to another. Point integrity is vital; there are on average 31 critical fastenings at each switch. Across the EU, SCF was responsible for 21 derailments between 2005-2010. Globally, SCF is responsible for 5.77% of all derailments (6th largest cause of derailments). SCF is a leading cause of signalling failure, leading to delays; 9.5 million minutes of passenger delays due to SCF occurred during the 2015/2016 audit period on the UK rail network alone. EU rail infrastructure owners are implementing ‘intelligent infrastructure’ solutions across their rail networks that enable remote condition monitoring (RCM) & condition based maintenance (CBM) as a way of monitoring assets, such as points, to increase reliability & capacity of rail networks. To enable RCM & CBM, Smart Component Technologies (SCT) have developed their proprietary ‘Smart Washer’ platform technology. Smart Washer 3 (SW3) is a washer containing a multitude of sensors that is deployed at critical fastenings at points to measure parameters (including clamp force & movement) from directly within the fastening. Through a connected Data Controller Unit (DCU), the measurements are fed in real-time to a cloud based server that interfaces with RCM software used by those responsible for the maintenance of rail tracks to remotely monitor the entire switch asset, as well as track bed stability (including voids & track geometry/inclination).

Combined, the SW3 & DCU comprise the ‘Smart Washer Ecosystem', which offers a full ‘end-to-end’ solution for RCM & CBM; this will service the Rail infrastructure maintenance market, expected to be worth $5.8 billion in 2017.

Conservative cumulative five-year sales of 3,500 installations gives sales of EUR 6.3 million, & a ROI to SCT of 600%.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "GRAILS-SWE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "GRAILS-SWE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

ESCaPE (2016)

A game-changing light aircraft enabled by advanced materials and novel production menthods

Read More  

Ellum AC System (2018)

An advanced air conditioning system for Electric Vehicles

Read More  

Wave Predictor (2018)

Wave Predictor

Read More