Opendata, web and dolomites

GRAILS-SWE

Greater RAIL Safety using the Smart Washer Ecosystem

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 GRAILS-SWE project word cloud

Explore the words cloud of the GRAILS-SWE project. It provides you a very rough idea of what is the project "GRAILS-SWE" about.

roi    trains    guided    fastenings    responsible    service    track    cbm    maintenance    conservative    stability    platform    reliability    381    force    connected    cloud    minutes    combined    washer    billion    technologies    ecosystem    globally    monitoring    derailments    clamp    switch    gives    vital    passenger    tracks    solutions    proprietary    points    sw3    solution    critical    21    kilos       remotely    period    rail    geometry    dcu    2015    2005    assets    voids    comprise    capacity    2016    2014    asset    signalling    occurred    sct    containing    installations    audit    alone    infrastructure    travelled    600    bed    remote    entire    controller    sales    installation    eur    data    crossing    point    railroad    77    6th    uk    networks    network    31    full    smart    fed    km       owners    worth    integrity    2010    2017    500    scf    monitor    offers    movement    280    delays    freight    market    intelligent    million    server    software    implementing    inclination    interfaces    rcm    sensors    fastening    mechanical    time    multitude    tonne    cumulative   

Project "GRAILS-SWE" data sheet

The following table provides information about the project.

Coordinator
SMART COMPONENT TECHNOLOGIES LIMITED 

Organization address
address: OLYMPUS PARK, QUEDGELEY
city: GLOUCESTER
postcode: GL2 4NF
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.smartcomptech.com
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2017
 Duration (year-month-day) from 2017-01-01   to  2017-09-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SMART COMPONENT TECHNOLOGIES LIMITED UK (GLOUCESTER) coordinator 50˙000.00

Map

 Project objective

9% of all EU freight (280 billion tonne-kilos) & 381 billion passenger km were travelled on EU rail networks in 2014. A railroad switch & crossing (point) is a mechanical installation enabling trains to be guided from one track to another. Point integrity is vital; there are on average 31 critical fastenings at each switch. Across the EU, SCF was responsible for 21 derailments between 2005-2010. Globally, SCF is responsible for 5.77% of all derailments (6th largest cause of derailments). SCF is a leading cause of signalling failure, leading to delays; 9.5 million minutes of passenger delays due to SCF occurred during the 2015/2016 audit period on the UK rail network alone. EU rail infrastructure owners are implementing ‘intelligent infrastructure’ solutions across their rail networks that enable remote condition monitoring (RCM) & condition based maintenance (CBM) as a way of monitoring assets, such as points, to increase reliability & capacity of rail networks. To enable RCM & CBM, Smart Component Technologies (SCT) have developed their proprietary ‘Smart Washer’ platform technology. Smart Washer 3 (SW3) is a washer containing a multitude of sensors that is deployed at critical fastenings at points to measure parameters (including clamp force & movement) from directly within the fastening. Through a connected Data Controller Unit (DCU), the measurements are fed in real-time to a cloud based server that interfaces with RCM software used by those responsible for the maintenance of rail tracks to remotely monitor the entire switch asset, as well as track bed stability (including voids & track geometry/inclination).

Combined, the SW3 & DCU comprise the ‘Smart Washer Ecosystem', which offers a full ‘end-to-end’ solution for RCM & CBM; this will service the Rail infrastructure maintenance market, expected to be worth $5.8 billion in 2017.

Conservative cumulative five-year sales of 3,500 installations gives sales of EUR 6.3 million, & a ROI to SCT of 600%.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "GRAILS-SWE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "GRAILS-SWE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

K.A.R.S. (2017)

ANTIROTATION SYSTEM FOR HELIRESCUE

Read More  

GMP (2017)

Green Marine Propulsion

Read More  

Ellum AC System (2018)

An advanced air conditioning system for Electric Vehicles

Read More