Opendata, web and dolomites

SheaRIOS SIGNED

Wind Turbine Shearography Robotic Inspection On-blade System (SheaRIOS)

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SheaRIOS project word cloud

Explore the words cloud of the SheaRIOS project. It provides you a very rough idea of what is the project "SheaRIOS" about.

kit    september    innovation    robotics    provider    assuming    turbines    base    validation    accurate    move    data    electricity    deploy    reduce    preliminary    tower    solution    unforeseen    shore    turbine    platform    time    save    market    055    service    link    translates    operator    first    action    air    workers    power    safety    wind    shearios    integrate    inspection    revenue    renewables    robotic    readiness    site    investment    keep    ascend    translate    act    payback    countries    inspections    will    place    hundreds    averting    shearography    accidents    backbone    suction    quality    export    cantilever    rope    74m    generation       savings    lost    20    failures    cumulative    laboratory    destructive    easier    faster    mid    health    wtb    climber    idle    day    deployment    competitive    92    blade    utilising    successful    full    industry    modeling    edf    small    transition    outside    farm    period    carry    companies    drive    152    off    2016   

Project "SheaRIOS" data sheet

The following table provides information about the project.

Coordinator
TWI LIMITED 

Organization address
address: GRANTA PARK GREAT ABINGTON
city: CAMBRIDGE
postcode: CB21 6AL
website: www.twi.co.uk

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Total cost 3˙318˙177 €
 EC max contribution 2˙716˙906 € (82%)
 Programme 1. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
 Code Call H2020-ICT-2017-1
 Funding Scheme IA
 Starting year 2018
 Duration (year-month-day) from 2018-01-01   to  2021-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    TWI LIMITED UK (CAMBRIDGE) coordinator 851˙441.00
2    VISATEC GESELLSCHAFT FUR VISUELLE INSPEKTIONSANLAGEN MBH DE (SULZBERG) participant 515˙261.00
3    AINOOUCHAOU PLIROFORIKI AE EL (ATHINA) participant 474˙008.00
4    ACONDICIONAMIENTO TARRASENSE ASSOCIACION ES (TERRASSA) participant 462˙500.00
5    WRS CATHODIC PROTECTION BV NL (STRIJEN) participant 210˙765.00
6    EDF ENERGY R&D UK CENTRE LIMITED UK (LONDON) participant 117˙941.00
7    EDF ENERGY RENEWABLES LIMITED UK (LONDON) participant 84˙988.00
8    RENEWABLE TECHNICAL SERVICES LIMITED UK (KETTERING) participant 0.00

Map

 Project objective

SheaRIOS is a solution for the Wind Turbine Blade (WTB) inspection industry that enables easier, faster and more accurate inspection utilising robotics and shearography, a high-quality method that is applied outside of the laboratory for the first time. A deployment platform will ascend on the wind turbine tower and deploy a work climber on the base of the blade. The climber will move on the blade by means of air-suction and carry out inspection with a shearography kit on a cantilever. The deployment platform will also act as the power and data link.

Operational modeling is done by EDF, the end-users that drive this Innovation Action. Preliminary testing and validation of the market-readiness of SheaRIOS robotic application will take place at their site, both on-shore (EDF R&D) and off-shore (EDF Renewables). Three competitive small and mid-scale technology companies from three European countries will contribute so Europe will (1) integrate more wind power, (2) reduce operational costs, (3) keep the technology lead, and (4) remain a major export. As per Wind Europe, these are the targets for enabling wind to become the backbone of our electricity generation system.

Based on our analysis, the non-destructive testing service provider would save 1,055€ per wind turbine inspection and payback of SheaRIOS investment will be achieved after 152 inspections, or the first 2 years. The wind farm operator will save more than 1 full day per wind turbine inspection, because of the reduced inspection time, which directly translates to less revenue lost due to idle wind turbines. Finally, the cumulative savings for a period of the first 5 years will translate to €92.74m, assuming SheaRIOS will be successful in averting just 20% of the unforeseen WTB failures and contributing to increased health and safety for the rope access workers that are involved in hundreds of accidents each year.

[1] Wind Europe, “Making transition work”, September 2016

 Deliverables

List of deliverables.
Report on Awareness events Documents, reports 2020-04-14 16:59:44
Composition of the IAB: discovery and invitation Documents, reports 2020-04-14 16:59:44

Take a look to the deliverables list in detail:  detailed list of SheaRIOS deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SHEARIOS" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SHEARIOS" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.2.1.1.)

MultiFlex (2019)

Ultrashort Pulsed Laser Processing at 1 Kilowatt Using a Flexible Multi Beam Approach

Read More  

DEL4ALL (2020)

Digital Enhanced Learning for ALL

Read More  

MedPhab (2020)

Photonics Solutions at Pilot Scale for Accelerated Medical Device Development

Read More