Opendata, web and dolomites

SPEED-EU

Damping device to solve the pantograph-line capture problems, especially for the EU high-speed railways lines

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SPEED-EU project word cloud

Explore the words cloud of the SPEED-EU project. It provides you a very rough idea of what is the project "SPEED-EU" about.

temperatures    limit    materials    difficult    fixed    thanks    started    railway    construction    war    enter    effect    million    solution    works    airline    direct    traffic    carpentry    industry    save    kineto    period    fluids    becomes    commercialization    trains    continuous    pantograph    exploits    stringing    nor    countries    speed    structures    arcing    special    fluid    companies    conductors    thread    post    sensitive    inspected    mechanically    innovation    contact    1901    bertolotti    founded    allowable    electricity    specialised    rail    dispersed    oscillations    officina    90    train    jobs    power    installation    interruption    iron    15    brand    damage    fratelli    dynamic    create    esploitation    expensive    demands    electrical    abandonment    56    modern    infrastructure    transport    consequent    blacksmith    considerable    customers    joule    made    company    electric    dissipation    visually    catenary    small    workshop    transmission    linked    crawling    environment    revenues    acquisition    goodness    replacement    linear    substitution    1920   

Project "SPEED-EU" data sheet

The following table provides information about the project.

Coordinator
OFFICINA FRATELLI BERTOLOTTI SPA 

Organization address
address: VIA MILANO 4
city: VOLPIANO
postcode: 10088
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website https://www.fratelli-bertolotti.com/ricerca-sviluppo/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-02-01   to  2018-07-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    OFFICINA FRATELLI BERTOLOTTI SPA IT (VOLPIANO) coordinator 50˙000.00

Map

 Project objective

'Officina Fratelli Bertolotti S.p.A. was founded in 1901 as a small workshop that was working as blacksmith. From 1920 it specialised in special iron carpentry and in the post-war period it becomes a modern industry thanks to the acquisition of customers in the industry 'Electricity transmission'. Today the company brand is linked to that of the most important Electrical and Transport companies in various countries. The proposed innovation was started in order to respond to the emerging needs of the railway sector for the high-speed trains infrastructure. The goodness of the electric power uptake by the thread of the airline has been a problem since the abandonment of the 'third rail', but the increase in speed and power demands made it even more difficult to ensure continuous contact between catenary and crawling, with the consequent formation of electrical arcing which can damage fixed installation, pantograph and electrical systems of the train. The ability to maintain a continuous and fluid contact between these two elements is one of the main factors that limit the allowable speed of trains. The most direct solution, that is the stringing of conductors, involves considerable problems related to the substitution of the infrastructure: high costs and rail traffic interruption. Our innovation exploits the non-linear kineto-dynamic made by the specific construction, it is mechanically simple, does not use materials sensitive to temperatures, nor dissipation by Joule effect, works for small and large oscillations, does not use fluids that may be dispersed in the environment, and can be inspected visually. Furthermore, it is much less expensive than the replacement of the conductors and of support structures, allowing to save 90% of replacement costs. From the esploitation of SPEED-EU we expect to create 15 new jobs, enter into the rail sector and increase revenues of €56 million in a 4-years commercialization period.'

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SPEED-EU" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SPEED-EU" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

ESCaPE (2016)

A game-changing light aircraft enabled by advanced materials and novel production menthods

Read More  

Wave Predictor (2018)

Wave Predictor

Read More  

SAFECHILD (2016)

SAFECHILD: Innovative Safety System for Children Transported in Vehicles

Read More