Opendata, web and dolomites

SPEED-EU

Damping device to solve the pantograph-line capture problems, especially for the EU high-speed railways lines

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SPEED-EU project word cloud

Explore the words cloud of the SPEED-EU project. It provides you a very rough idea of what is the project "SPEED-EU" about.

1901    iron    save    stringing    transmission    crawling    replacement    airline    carpentry    catenary    transport    inspected    becomes    effect    small    post    train    fixed    thanks    damage    mechanically    consequent    countries    started    special    conductors    million    oscillations    15    continuous    modern    electrical    specialised    dissipation    expensive    56    considerable    innovation    create    companies    bertolotti    fratelli    electricity    works    environment    contact    visually    company    installation    railway    jobs    demands    war    officina    brand    trains    90    goodness    traffic    workshop    linear    acquisition    nor    direct    exploits    kineto    rail    power    revenues    abandonment    difficult    fluids    limit    enter    construction    founded    dispersed    structures    speed    pantograph    interruption    commercialization    linked    dynamic    esploitation    infrastructure    arcing    1920    made    temperatures    sensitive    allowable    blacksmith    fluid    customers    materials    joule    electric    period    thread    substitution    industry    solution   

Project "SPEED-EU" data sheet

The following table provides information about the project.

Coordinator
OFFICINA FRATELLI BERTOLOTTI SPA 

Organization address
address: VIA MILANO 4
city: VOLPIANO
postcode: 10088
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website https://www.fratelli-bertolotti.com/ricerca-sviluppo/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2016-2017
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-02-01   to  2018-07-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    OFFICINA FRATELLI BERTOLOTTI SPA IT (VOLPIANO) coordinator 50˙000.00

Map

 Project objective

'Officina Fratelli Bertolotti S.p.A. was founded in 1901 as a small workshop that was working as blacksmith. From 1920 it specialised in special iron carpentry and in the post-war period it becomes a modern industry thanks to the acquisition of customers in the industry 'Electricity transmission'. Today the company brand is linked to that of the most important Electrical and Transport companies in various countries. The proposed innovation was started in order to respond to the emerging needs of the railway sector for the high-speed trains infrastructure. The goodness of the electric power uptake by the thread of the airline has been a problem since the abandonment of the 'third rail', but the increase in speed and power demands made it even more difficult to ensure continuous contact between catenary and crawling, with the consequent formation of electrical arcing which can damage fixed installation, pantograph and electrical systems of the train. The ability to maintain a continuous and fluid contact between these two elements is one of the main factors that limit the allowable speed of trains. The most direct solution, that is the stringing of conductors, involves considerable problems related to the substitution of the infrastructure: high costs and rail traffic interruption. Our innovation exploits the non-linear kineto-dynamic made by the specific construction, it is mechanically simple, does not use materials sensitive to temperatures, nor dissipation by Joule effect, works for small and large oscillations, does not use fluids that may be dispersed in the environment, and can be inspected visually. Furthermore, it is much less expensive than the replacement of the conductors and of support structures, allowing to save 90% of replacement costs. From the esploitation of SPEED-EU we expect to create 15 new jobs, enter into the rail sector and increase revenues of €56 million in a 4-years commercialization period.'

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SPEED-EU" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SPEED-EU" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

ESCaPE (2016)

A game-changing light aircraft enabled by advanced materials and novel production menthods

Read More  

Wave Predictor (2018)

Wave Predictor

Read More  

DTD SYSTEM 2 (2017)

A disruptive innovation for the minisation of railway mantenance costs

Read More