Opendata, web and dolomites

AIRCRANE SIGNED

New Concrete-Towers Assembly system for taller Wind Turbines.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 AIRCRANE project word cloud

Explore the words cloud of the AIRCRANE project. It provides you a very rough idea of what is the project "AIRCRANE" about.

group    million    additionally    serves    cranes    action    convinced    once    completion    tallest    least    external    install    units    energy    skyscrapers    limited    self    loads    32    nacelle    mw    opportunity    307    niche    reduce    direct    construction    turbines    heavier    capture    marked    towers    assembly    supporting    58    turning    steel    176    business    inspired    decrease    indirect    revenues    lower    advantages    machines    concentrated    98    regarding    manufacturers    market    sources    limitations    blows    levelized    successful    height    rotor    worldwide    turbulences    creation    expensive    crane    infinite    jobs    point    heights    rises    groups    lift    climbing    sme    harder    blades    167    construct    wind    radically    create    mainly    buildings    idea    weak    turbine    weight    aircrane    coming    crawlers    powerful    alternative    tower    skyscraper    manner    taller    strategies    limits    building    lcoe    brand   

Project "AIRCRANE" data sheet

The following table provides information about the project.

Coordinator
HWS CONCRETE TOWERS SL 

Organization address
address: CALLE PUIO 10, 3º
city: SAN SEBASTIAN GIPUZKOA
postcode: 20009
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.hwstowers.com/
 Total cost 2˙125˙125 €
 EC max contribution 1˙487˙587 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-03-01   to  2020-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    HWS CONCRETE TOWERS SL ES (SAN SEBASTIAN GIPUZKOA) coordinator 1˙487˙587.00

Map

 Project objective

Skyscrapers building technology marked a turning point in the construction sector: Due to the great heights of those buildings, the only way to build them is with a crane which rises in the manner the skyscraper does. Inspired by that idea, we developed the AIRCRANE SYSTEM. The wind energy sector currently has a main objective: decrease the Levelized Cost of produced Energy (LCoE), in order to be comparable to other energy sources in the coming years. The strategies to decrease are mainly concentrated in two action groups: Reduce the cost of wind turbines and capture as much energy as possible. Regarding the second group, manufacturers are convinced the best way is to create more powerful turbines (up to 8 MW) and install the nacelle and rotor at greater heights, where the wind blows harder and there are less turbulences. The market requires taller towers, supporting heavier loads on top as well. The only alternative, due to steel tower's limitations, is to make at least the lower part with concrete. But the concrete weak point is its weight, which requires the use of largest crawlers and cranes: very expensive machines and with a limited number of units worldwide. The AIRCRANE SYSTEM is a brand new technology that serves to assembly concrete wind-turbine towers, with theoretically infinite height: the Aircrane system is based on a external self-climbing crane which rises as the construction of the tower does, once its completed and built, the system will lift the nacelle and blades. There are two main advantages: (1) Radically reduce current construction costs in the tallest concrete towers, and additionally (2) open a new market-niche, being able to construct towers with no height limits. Successful project completion represents a significant business opportunity for our SME, with expected REVENUES of € 32,5/58,5 million within 5/7 years and the creation of 98/167 Direct Jobs, and 176/307 Indirect jobs

 Deliverables

List of deliverables.
Periodic Report Documents, reports 2020-03-04 09:49:40

Take a look to the deliverables list in detail:  detailed list of AIRCRANE deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "AIRCRANE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "AIRCRANE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Horizon (2018)

Cableway based Photovoltaic Retractable Folding Roof for Dual Usage of Spaces

Read More  

X-TEC (2018)

A groundbreaking renewable-energy technology for reducing truck emissions

Read More  

HomeEnergyStorage (2017)

Cost-effective battery for storage of locally produced Photovoltaic energy at residential buildings

Read More