Opendata, web and dolomites

IN2TRACK2 SIGNED

Research into enhanced track and switch and crossing system 2

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "IN2TRACK2" data sheet

The following table provides information about the project.

Coordinator
NETWORK RAIL INFRASTRUCTURE LIMITED 

Organization address
address: 1 EVERSHOLT STREET
city: LONDON
postcode: NW1 2DN
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Total cost 0 €
 EC max contribution 13˙188˙020 € (0%)
 Programme 1. H2020-EU.3.4.8.3. (Innovation Programme 3: Cost Efficient and Reliable High Capacity Infrastructure)
 Code Call H2020-S2RJU-CFM-2018
 Funding Scheme Shift2Rail-IA-LS
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2021-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    NETWORK RAIL INFRASTRUCTURE LIMITED UK (LONDON) coordinator 4˙584˙886.00
2    TRAFIKVERKET - TRV SE (BORLANGE) participant 3˙228˙121.00
3    SNCF RESEAU FR (LA PLAINE SAINT-DENIS) participant 742˙148.00
4    RAILENIUM FR (FAMARS) participant 642˙294.00
5    ACCIONA CONSTRUCCION SA ES (ALCOBENDAS) participant 441˙114.00
6    AC2T RESEARCH GMBH AT (WIENER NEUSTADT) participant 400˙959.00
7    KOMPETENZZENTRUM DAS VIRTUELLE FAHRZEUG FORSCHUNGSGESELLSCHAFT MBH AT (GRAZ) participant 393˙791.00
8    OBB-Infrastruktur AG AT (WIEN) participant 359˙389.00
9    UNIVERSIDADE DO PORTO PT (PORTO) participant 248˙542.00
10    UNIVERSIDADE DO MINHO PT (BRAGA) participant 193˙479.00
11    PRORAIL BV NL (UTRECHT) participant 192˙570.00
12    DEUTSCHE BAHN AG DE (BERLIN) participant 177˙927.00
13    VOESTALPINE VAE GMBH AT (WIEN) participant 175˙981.00
14    PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN GESELLSCHAFT MBH AT (WIEN) participant 164˙480.00
15    VOESTALPINE SCHIENEN GMBH AT (LEOBEN) participant 161˙154.00
16    CENTRO DE ESTUDIOS DE MATERIALES Y CONTROL DE OBRA SA ES (MALAGA) participant 134˙386.00
17    INFRAESTRUTURAS DE PORTUGAL SA PT (LISBOA) participant 129˙764.00
18    KIRCHDORFER FERTIGTEILHOLDING GMBH AT (WOLLERSDORF) participant 106˙687.00
19    TATA STEEL FRANCE RAIL SA FR (HAYANGE) participant 106˙655.00
20    HITACHI RAIL STS SPA IT (GENOVA) participant 102˙212.00
21    GETZNER WERKSTOFFE GMBH AT (BUERS) participant 98˙207.00
22    MATERIALS CENTER LEOBEN FORSCHUNG GMBH AT (LEOBEN) participant 75˙992.00
23    UNIVERSIDAD DEL PAIS VASCO/ EUSKAL HERRIKO UNIBERTSITATEA ES (LEIOA) participant 74˙081.00
24    VOSSLOH COGIFER FR (RUEIL MALMAISON) participant 70˙081.00
25    SLOVENSKE ZELEZNICE DOO SI (Ljubljana) participant 57˙653.00
26    WIENER LINIEN GMBH &CO KG AT (WIEN) participant 49˙708.00
27    TURKIYE CUMHURIYETI DEVLET DEMIR YOLLARI ISLETMESI GENEL MUDURLUGU TR (ANKARA) participant 47˙861.00
28    FCP FRITSCH, CHIARI & PARTNER ZIVILTECHNIKER GMBH AT (WIEN) participant 27˙883.00

Map

 Project objective

The IN2TRACK2 proposal addresses the topic of “Research into optimised and future railway infrastructure” of the 2018 HORIZON 2020 SHIFT2RAIL Call for proposals for the Joint Undertaking Members (S2R-CFM-IP3-01-2018). IN2TRACK2 deals with rail infrastructure sub-system and covers all the works on Switch & Crossing (S&C), Track and Structures (Bridges and Tunnels) included in the SHIFT2RAIL Innovation Programme 3 (including the project IN2TRACK) and contributes to the full longer-term SHIFT2RAIL objectives. IN2TRACK2 represents the opportunity to choose some high-risk, innovative activities from the current SHIFT2RAIL work programme for development under intensive collaboration as the right path for success. IN2TRACK2 aims to reduce lifecycle costs, improve reliability and punctuality, whilst increasing capacity, enhancing interoperability and improving the customer experience. The structure of the work plan is designed around the development of a certain number of well-focused technological innovations in several areas (S&C, Track and Structures), each and all together, will contribute to achieve the desired impact at the overall railway system level. The IN2TRACK2 proposal is organised around three technical sub-projects, which are interconnected: S&C, Track and Structures. S&C activities aim at both improving the operational performance of existing S&C and providing radical new S&C system solutions that deliver a step-change in performance of the asset. The IN2TRACK2 Track activities aim at both exploring new track construction to optimise the today track system and improving the track system substantially to provide a step change in performance. The IN2TRACK 2 Bridges and Tunnels activities aim at improving methods and repair techniques to reduce costs, improve quality and extend the service life of structures. By enhancing S&C, Track and Structures, IN2TRACK2 contributes to all of the expected impacts identified in the Shift2Rail Annual Work Plan 2018.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "IN2TRACK2" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "IN2TRACK2" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.8.3.)

FUNDRES (2019)

FUTURE UNIFIED DC RAILWAY ELECTRIFICATION SYSTEM

Read More  

IN2TRACK2 (2018)

Research into enhanced track and switch and crossing system 2

Read More  

Assets4Rail (2018)

Measuring, monitoring and data handling for railway assets; bridges, tunnels, tracks and safety systems

Read More