Project "NEXTGEAR" data sheet

The following table provides information about the project.

Coordinator
UNION DES INDUSTRIES FERROVIAIRES EUROPEENNES - UNIFE 

Organization address
address: AVENUE LOUISE 221
city: BRUXELLES
postcode: 1050
website: www.unife.org

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Belgium [BE]
 Total cost 2˙573˙877 €
 EC max contribution 2˙573˙877 € (100%)
 Programme 1. H2020-EU.3.4.8.1. (Innovation Programme 1 (IP1): Cost-efficient and reliable trains)
 Code Call H2020-S2RJU-OC-2019
 Funding Scheme Shift2Rail-RIA
 Starting year 2019
 Duration (year-month-day) from 2019-12-01   to  2021-11-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    UNION DES INDUSTRIES FERROVIAIRES EUROPEENNES - UNIFE BE (BRUXELLES) coordinator 159˙500.00
2    KUNGLIGA TEKNISKA HOEGSKOLAN SE (STOCKHOLM) participant 357˙937.00
3    POLITECNICO DI MILANO IT (MILANO) participant 269˙112.00
4    RINA CONSULTING SPA IT (GENOVA) participant 227˙500.00
5    METRO DE MADRID SA ES (MADRID) participant 204˙992.00
6    UNIVERSITY OF HUDDERSFIELD UK (HUDDERSFIELD) participant 188˙912.00
7    BERCELLA SRL IT (VARANO DE MELEGARI) participant 188˙500.00
8    NEAT SRL IT (ROMA) participant 183˙125.00
9    UNIVERSITAS NEBRISSENSIS SA ES (HOYO DE MANZANARES) participant 164˙687.00
10    UNIVERSITY OF LEEDS UK (LEEDS) participant 152˙687.00
11    THE UNIVERSITY OF NOTTINGHAM UK (NOTTINGHAM) participant 116˙512.00
12    LUCCHINI RS SPA IT (Brescia) participant 113˙750.00
13    TECHNISCHE UNIVERSITAET GRAZ AT (GRAZ) participant 92˙222.00
14    STATENS VAG- OCH TRANSPORTFORSKNINGSINSTITUT SE (LINKOEPING) participant 90˙750.00
15    DELLNER DAMPERS AKTIEBOLAG SE (FLEN) participant 40˙000.00
16    AUTORITATEA FEROVIARA ROMANA RO (BUCURESTI) participant 23˙687.00

Map

 Project objective

The rail sector has recently seen only limited changes in running gear.The rail sector has recently seen only limited changes in running gear. A reason is that innovations have the tendency to increase the first cost of the running gear while they reduce the LCC by reduce maintenance costs. The long-term cost reduction, however, is not easy to quantify. This dilemma will be addressed in WP1 where an updated Universal Cost Model based on the one from the Roll2Rail project will be developed that makes it possible to judge the economic impact of the innovation suggested for an operator using the vehicle. How can the costs for buying, operating and maintaining the vehicle be influenced? Lower bogie weight would reduce wheel-rail forces and allow for higher payload. In WP2, the project is going to suggest ideas that are based both on the use of new materials and new manufacturing methods. Simulation techniques will be explored to allow optimisation of designs. It will be investigated whether required properties of the running gear such as stiffness and damping could be distributed through the structure rather than requiring specific components. In parallel, active control strategies will be investigated to improve the level of ride comfort or reduce wheel and rail damage. The wheelset is another extremely important and safety-critical component in a rail vehicle. Since it represents a so-called “unsuspended mass” there is a desire to minimize the wheelset weight. The main objective of WP3 is a feasibility study on the use of composite materials for the construction of railway wheelsets. Technology concepts for a lightweight wheelset will be defined. Main focus areas are material selection, durability, manufacturing process and joining methods. The output of this project will be important input for the parallel member project in IP1 both regarding the Cost Model and the technical innovations. There will also be a contribution to the overall S2R KPI’s and partly IP3.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "NEXTGEAR" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "NEXTGEAR" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.8.1.)

PIVOT2 (2019)

Performance Improvement for Vehicles on Track 2

Read More  

PINTA2 (2018)

IP1 Traction TD1 and Brakes TD5 – Phase 2

Read More  

Safe4RAIL-2 (2018)

Safe architecture for Robust distributed Application Integration in roLling stock 2

Read More