Opendata, web and dolomites

EPC_PLUS SIGNED

Energy Performance Contracting Plus

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "EPC_PLUS" data sheet

The following table provides information about the project.

Coordinator
CENTRE FOR RENEWABLE ENERGY SOURCES AND SAVING FONDATION 

Organization address
address: MARATHONOS 19TH KM
city: PIKERMI
postcode: 19009
website: http://www.cres.gr

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Greece [EL]
 Total cost 1˙486˙015 €
 EC max contribution 1˙486˙014 € (100%)
 Programme 1. H2020-EU.3.3.7. (Market uptake of energy innovation - building on Intelligent Energy Europe)
 Code Call H2020-EE-2014-3-MarketUptake
 Funding Scheme /CSA
 Starting year 2015
 Duration (year-month-day) from 2015-03-01   to  2018-03-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    CENTRE FOR RENEWABLE ENERGY SOURCES AND SAVING FONDATION EL (PIKERMI) coordinator 104˙668.00
2    FACTOR 4 BVBA BE (DUFFEL) participant 217˙862.00
3    ESCAN SL ES (MADRID) participant 168˙932.00
4    ARBEITSGEMEINSCHAFT ASEW c/o VKU DE (KOLN) participant 122˙887.00
5    GRAZER ENERGIEAGENTUR GMBH AT (GRAZ) participant 119˙643.00
6    E7 ENERGIE MARKT ANALYSE AT (WIEN) participant 118˙426.00
7    ESCO ITALIA SRL IT (MILANO) participant 110˙022.00
8    TIPPERARY ENERGY AGENCY LIMITED IE (CAHIR) participant 101˙553.00
9    INSTITUTO DE SISTEMAS E ROBOTICA-ASSOCIACAO PT (Coimbra) participant 98˙315.00
10    BLACK SEA ENERGY RESEARCH BG (SOFIA) participant 90˙370.00
11    SEVEN, THE ENERGY EFFICIENCY CENTER Z.U. CZ (PRAHA) participant 83˙818.00
12    INSTITUT JOZEF STEFAN SI (LJUBLJANA) participant 81˙918.00
13    HELESCO ENERGY SERVICES SA EL (ATHINA) participant 67˙595.00
14    SEVEN STREDISKO PRO EFEKTIVNI VYUZIVANI ENERGIE O.P.S. CZ (PRAHA 2) participant 0.00

Mappa

 Project objective

Energy Performance Contracting (EPC) is generally looked upon favourably, but its implementation can be complicated and lengthy. The reason lies mainly in the procurement law provisions and the long-term and complex contracts, which impede a real breakthrough in the spread of the EPC methodology. The other main barriers for the implementation of EPC in SMEs are:

• The transaction costs for procuring energy services are too high • Investments and project sizes are too small • It is difficult to obtain financing for such small projects • High costs for guarantees, measurement and verification procedures

The ultimate goal of the EPC project is to reduce transaction costs of energy service packages drastically so that smaller investments and projects in SMEs become possible for companies offering energy services. This can only happen if both the technical solutions as well as the contractual issues of energy services are highly standardized. The energy services offered can be either partly or wholly financed with innovative financing solutions, or may be more service-oriented solutions with guaranteed energy performances.

The major outputs of the project include: (1) the development of commercial, standardized energy service packages for SMEs in each participant country. Each participant country will develop energy service packages that suit the specific and particular requirements of their country. These will include a standardized technical solution for a specific market sector, a model contract and, where possible, a financing solution. (2) the implementation of pilot projects for the EPC packages in each participant country (3) the set-up and management of clusters of companies (SPINS) in each participant countries. These clusters will offer energy services to the SME market, (4) the training of these clusters of companies in each participant country and (4) the development of an international e-market for energy service providers.

 Work performed, outcomes and results:  advancements report(s) 

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "EPC_PLUS" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "EPC_PLUS" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.7.)

BUILD UPON (2015)

A multi-stakeholder Regional Action Network as a living structural base to effectively help define and implement deep energy efficient building renovation at local, national and European level.

Read More  

EU-MERCI (2016)

EU-MERCI - EU coordinated MEthods and procedures based on Real Cases for the effective implementation of policies and measures supporting energy efficiency in the Industry

Read More  

PremiumLight_Pro (2016)

Next-level energy efficient lighting systems in the service sector

Read More