Opendata, web and dolomites

HySolarKit

Converting conventional cars into hybrid and solar vehicles

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 HySolarKit project word cloud

Explore the words cloud of the HySolarKit project. It provides you a very rough idea of what is the project "HySolarKit" about.

130ml    economic    flexibility    greenhouse    typologies    invalidating    rongtong    financing    integrates    customer    ind    electrification    effort    realized    first    proposer    coupling    hybrid    thorough    business    validation    shown    car    possibility    investment    huge    safety    emissions    ion    self    applicability    tentative    conventional    financers    limited    flexible    cars    fuel    modify    performance    line    put    energy    hysolarkit    successful    eproinn    capital    introduces    35    selling    beijing    pay    20    points    company    last    worldwide    acceptable    vehicle    b2b    powered    strategy       adaptive    motors    convenient    passengers    decade    fleets    technologies    wheel    500    actua    landi    battery    categories    showing    markets    market    feasibility    regulatory    renzo    sme    instrument    commercialization    industrial    preliminary    plan    ciaotech    panel    b2c    respect    pv    initial    li    italy    plug    electric    23    solar    fleet    roi    ghg    payback    time    period    sources    subcontractors    consumption    innovation    drafted    positive    willingness    reducing    group    gases   

Project "HySolarKit" data sheet

The following table provides information about the project.

Coordinator
EPROINN SRL 

Organization address
address: VIA GIOVANNI PAOLO II 132
city: FISCIANO SA
postcode: 84084
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.hysolarkit.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-05-01   to  2015-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    EPROINN SRL IT (FISCIANO SA) coordinator 50˙000.00

Map

 Project objective

In the last decade, increasing effort has been put worldwide in reducing the impact on fuel consumption and greenhouse gases (GHG) emissions from passengers cars. HySolarKit introduces for the first time the possibility to modify a conventional car into a plug-in solar-powered hybrid electric vehicle, allowing reduction of fuel consumption and GHG emissions by ~20%, with limited investment cost (~2.500€), acceptable payback (2-3 years) and without invalidating performance and safety. The innovation integrates for the first time state of the art technologies (in-wheel motors, Li-ion battery, flexible PV panel) with an advanced control system, self-adaptive to different vehicle and in-wheel typologies and features. HySolarKit unique selling points are: i) successful coupling with solar energy ii) applicability to existing fleets, with limited investment with respect to a fleet electrification, iii) flexibility of energy sources. eProInn will foster the industrial development of the research aimed at a successful commercialization strategy. A preliminary market assessment has already shown huge market potential (~130Ml€ in Italy only), as well as willingness to pay by main customer categories. Proposer SME has already defined a thorough commercialization strategy, addressing the B2C and B2B main markets, in line with own company strategy. This includes an initial self-financing for R&D development and market validation as well as the technical and capital support of already involved partners (Landi Renzo and Actua), financers (Beijing Rongtong S&T Ind. Group) and subcontractors (Ciaotech), and others identified in Phase 1. A tentative business plan has already been drafted over a 23-year period, showing that with the help of the SME-instrument a positive ROI can be realized already at year 4 (35%). Phase 1 project will assess the technical, regulatory and economic feasibility of HySolarKit project and define a convenient commercialization strategy for the product.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "HYSOLARKIT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "HYSOLARKIT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.3.1.)

SMP (2015)

THE SUSTAINABLE MOBILITY PLANNER (SMP)

Read More  

REFEREE (2015)

pREcise Fluids mEteRing EquipmEnt

Read More  

SIADE (2014)

Spatial Decision Support System for Transportation Planning

Read More